You are on page 1of 1

KEY PLAN

architectural & engineering consultants

MAIN
ENT.

ROA
D

499.05

D
ROA

286.52
20613
AMER 012 4
ICAN
UNIVE
(GOV RSITY
T. OF
RAK)

ENT.

D
ROA
286.52
EXIT
366.50
SUB ENT
.
m 50.00m

51.01m
206134

51.01m
013
ROA
D

50.00m 82.50m

SITE PLAN

SYMBOL DESCRIPTION

IP FIXED DOOM CAMERA (SAMSUNG 2 MB FULL HD)

NOTE : 4 CORE SINGLE MODE ARMORED SHIELDED FIBER CABLE RUNNING FROM "CCTV ROOM" TO BUILDING G "CCTV ROOM"
WDR IP FIXED BULLET CAMERA (SAMSUNG 2 MB FULL HD)

I N T E R N A L R O A D
NVR NVR
01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22
97500
100 3500 6950 6950 3600 6950 6730 220 3600 7000 5200 3800 3200 4450 6200 4450 220 4880 1875 6975 7050 3500 100

SHADED PA RKING A R E A SHADED PA RKING A R E A SHADED PA RKING A R E A

-1.55
FFL

Powder coated
Alum.handrail S.S Steel handrail
-0.15
-0.15 -0.15 P.L Perforated Alum. screen -0.15
G/C-1 P.L G/C-7 P.L Ramp up P.L G/C-15
Ramp Slope 1:12% Ramp A.C.P Cladding +0.60
10cm Expansion Joint. G/C-8 W24

100
100

Perforated Alum. screen Perforated Alum. screen Perforated Alum. screen FFL W20
2 hours fire rated
A Flower Box G/C-14 A
1000

1000
Flower Box W6 -0.76 W5 Flower Box
G/C-2 W17
Gas FFL G/C-16
09 10 11
08

B STORE G/C-3 G/C-4


LPG STORE G/C-5
G/C-6
Store
G/C-9 Duct
+0.60
07
06
05
Powder coated
Alum.handrail +0.15
B
Gas FFL 04
F.F.L
+0.60
Elec.
3700

3700
03
FFL 02
-1.05 STORE (Under steps)
01
FFL
up CAT 6 A CABLE
PREPARATION HDRF CABLE TRAYS HDRF CABLE TRAYS TO ABOVE
+0.60
FFL
PREPARATION Duct G/C-13
C Mechanical
ventilation
CAT 6 A CABLE Tel. G/C-12 C
W14

PREPARATION
Duct +3.00 +3.00
BIOCHEMISTRY LAB
+2.85 +2.85
(Graduate Students) MICRO BIOLOGY LAB
CAT 6 A CABLE BIOCHEMISTRY LAB (Undergraduate Lab)
CELL CULTURE
+0.60LAB (Graduate Students)
MICRO BIOLOGY LAB
(Undergraduate Students) STORE +2.70 +2.70
up +0.60
FFL Duct
+0.60 +2.55 +2.55
CAT 6 A FFL
CABLE FFL
5700

5700
HDRF CABLE TRAYS HDRF CABLE TRAYS TO ABOVE

NVR
01
+0.60 +2.40 +2.40
02
03 TECHNICIAN IT ROOM FFL
+2.25 +2.25
04 CAT 6 A CABLE
05 TECHNICIAN 12
11 +2.10 +2.10
06
TECHNICIAN 10
09 +1.95 +1.95
Perforated Alum. screen
-0.15 COLD ROOM 08
W2
LIFT
S.S Steel handrail

S.S Steel handrail

07 +1.80 +1.80
FFL
D 06
D
Ramp

G/C-10 G/C-11
LOBBY Thermal Insulation
05
+1.65 +1.65 G/C-17 G/C-19
1500

1500
04
07 03 G/C-21
+1.50 +1.50
08 02

E 09
10 Powder coated
01

up
+1.35 +1.35 E
11 Alum.handrail
160 Seats

1775
+1.20 +1.20
CW25
+0.60 RECORDING ROOM STAGE
+0.60 G/C-44 HDRF CABLE TRAYS FOR LOW CURRENT G/C-42 G/C-41
3200

FFL
CAT 6 A CABLE
FFL CORRIDOR +0.60
CORRIDOR +0.75
+1.05 +1.05
E'
CAT 6 A CABLE
FFL FFL +0.90 +0.90 +0.60 COMPUTER LAB
CAT 6 A CABLE Mechanical ventilation
AUDITORIUM

1425
FFL +0.60
+0.60 G/C-23
G/C-35 FFL
G/C-38 +0.75 Area-278.5 FFL +0.75

F +0.60G/C-47
G/C-36
G/C-18
F
2100

2100
FFL +0.60
up FFL G/C-20 +0.60
CAT 6 A CABLE
01 TOILET(F) TOILET(M)
G/C-37 STAGE FFL 09
08

F' 02
07
F'

Powder coated
35600

35600
Alum.handrail
03
Powder coated

06
Alum.handrail

+0.60
04 +1.05 AUDIO LAB 05
05 F.F.L FFL STORE 04
2350

2350
CLASS ROOM-3 CAT 6 A CABLE
06
CLASS ROOM-1 CLASS ROOM-2 CLASS ROOM-4 +0.60 03
Ramp Slope 1:12%

07 +0.60 +0.60 Area = 48.60 M FFL 02


Area = 48.60 M Area = 48.60 M VIDEO LAB
HPL Partition with door

08 Area = 48.60 M FFL FFL 32 Seats32 01


09
32 Seats32 32 Seats32 32 Seats32 W/C STORE
W/C
HPL Partition with door

G LOUNGE ENTRANCE HALL G/C-34


up
+0.60
G PROJECT:

1550
G/C-48 W/C G/C-22 FFL
Ramp

W/C +0.60
2950

G'
Stainless Steel handrail
FFL +0.60
FFL
Duct W/C
Abdullah Ali Al Sharhan school of

1400
G/C-46 G/C-43 W/C 10cm Expansion Joint.
G/C-40 G/C-39 CORRIDOR
H W/C W/C
G/C-33 HDRF CABLE TRAYS HDRF CABLE TRAYS FOR LOW CURRENT HDRF CABLE TRAYS HDRF CABLE TRAYS FOR LOW CURRENT
CORRIDOR G/C-26
+0.60 up ±0.00
P.L
H
Arts and sciences
CW25 W4 W4 W7 G/C-27 FFL
CAT 6 A CABLE CAT 6 A CABLE
1800

1800
Mechanical ventilation
G/C-45 Flower Box Flower Box Duct
Duct
I I
Duct Disabled
CW1

Ramp
+0.15
PL
OWNER:

5400
Stainless Steel handrail
-0.40

W21
PL
STORE/JANITOR American University
7500

ENTRANCE SCHOOL OF ARTS & READING HALL CAT 6 A CABLE


+0.60
FFL
of Ras Al Khaimah
up Area = 151.84 M2
+0.60
Steel column with Stinless steel
cladding. (Mirror type.) MULTI PURPOSE HALL FFL
I'
Area = 198.38 M2

2100
G/C-25
G/C-28
J up W2 Perforated Alum. screen
J
20cm Insulated block wall
G/C-24
+0.15
3600

3600
P.L

G/C-31
G/C-32 G/C-29 CONSULTANT:
K K
100

100
W3
G/C-30 Perforated Alum. screen

100 3500 6950 6950 3600 6950 6730 220 3600 7000 5200 3800 3200 4450 6200 4450 220 4880 1875 6975 7050 3500
HOME OF ARCHITECTURE
100 FOR ENGINEERING CONSULTANTS
97500

01 02 03 04 05 06 07 08 09 10 11 12 13 14 15 16 17 18 19 20 21 22 MAIN CONTRACTOR:
ENJAZ
CONSTRUCTIONS
GULPHAR TOWER , FLAT NO.3305
RAS AL KHAIMAH
TEL:07-2285557 FAX:07-2277716
P.O BOX : 2201
WWW.ENJAZCONST.COM
MEP CONTRACTOR:

GROUND FLOOR CCTV PLAN


Proton Electromechanical Contracting LLC.
Al Naeem Tower 2, Near RAK Insurance, Al Nakheel,
Ras Al Khaimah, UAE. PO Box:- 1670.
CLIENT: AMERICAN UNIVERSITY OF RAS AL KHAIMAH

PROJECT: ABDULLAH ALI AL SHARHAN SCHOOL OF ARTS AND SCIENCES

DRAWING TITLE: GROUND FLOOR CCTV PLAN


AREA Seih Al Aribi - RAK PLOT NO. 206134012

DATE 30/09/2020 FLOOR TYPE GROUND FLOOR

SCALE 1:100@A1 BLDG. MAIN BUILDING


DRAWN ARUN SHEET NO CCTV-01
CHECKED Eng.SHAMON REV 00

You might also like