Project Scope
Sl.No. Description

1.A CCTV SYSTEM


Each floor CCTV cable connect to electrical room
CCTV system will fix in GF security room

1.B ACCESS CONTROL SYSTEM


Client requested to used Matrix system for this project
To provided access control temporary system for current IAM office
IAM requested – Face recognition system for main doors
Contactless card reader proposed for this project

1.C WIFI SYSTEM


Each floor WIFI cable connect to electrical room

1.D TV SCREEN
2 data and 1 power points required for all type of tv screen
TV mounting level and distances details to be issued
News room number of screen and data points details
News room screen mounting details, support required

1.E IT – DATA POINTS


Floor Box 1X = 2 no’s data & 2 power points, 2X = 4 data & 4 power points

GF Left side rooms data cable direct connect to server room, cablelength as per rack
requirements
GF Reception area cable connect to server room
GF right side room cable connect to electrical room
First and second floor data cables connect to electrical room
Cat-6A cable to be used for data points
1.F General
All cable in server room termination done by client sub-con

Page 1 of 2
K24 BUILDING PROJECT
SECURITY SERVICES

SCOPE OF WORKS Version 1.0


25-10-2021
1. INTRODUCTION – SCOPE OF WORKS
1.1. Confidential
This Request for Proposal “RFP” and the matters referred to herein are strictly confidential.

1.2. About INFO ARAB MEDIA FZ LCC


Info Arab Media FZ LLC “INFO ARAB MEDIA”, “Client”, Employer”, established in Dubai Studio City, is a
privately-owned company, is planning to launch a new Arabic Multi-Media Platform in the MENA
region with their Headquarter in Studio City, Dubai.

1.3. Purpose of the RFP


This document is intended to Security Companies “Security Company”, “Sub-contractor” who have a
proven track record in building security Design & build, who easily understand the need of the
customer and is able to deliver his result on a very short term to respond for the security system build
for a new interconnecting building and 2 existing buildings.

Client is leasing 2 buildings (so called Boutique Studio’s) BS15 & BS16 located at Dubai Studio City.
By connecting both buildings the existing courtyard could become a newsroom “Atrium”, “Newsroom”
which could occupy approx. 30 -40 people: journalists, producers, online & social teams as well the
Head of News and the presenters.

1.4. Purpose interconnecting the buildings


By interconnecting the 2 buildings a new main front entrance will be created with waiting area,
security room, disable toilets, etc.

The central area will lead to both existing buildings as well to a ~200m² newsroom with an open view
to a mezzanine, accessible from the 1st floor of both buildings. On top of this mezzanine roofing a small
corridor is located to connect the 2nd floors of BS15 & BS16.

Both Building BS15 and BS16 are (partial) core & shell or already fit-out; a Constriction Company will
construct the new interconnecting build and complete both buildings for fit-out as main Contractor,
“Contractor” .

The security company will be subcontracted to the contractor to ensure the whole project will be a
turn-key project, as well coordination between the flat-wiring install (CAT6A IT cables, power
connections, empty conducts, etc) is guaranteed and final result is a complete working system.

The new ground main entrance will host also a make-up room, disable toilets, a green room and prayer
rooms. The main entrance should have the possibility for security checks and key-pass speed-lane gate
entrance.

1.5 Security Company Scope of Work


The Security company Scope Of Work will be: designing and implementation of a complete company
security system, like (but not limited to):
• card-access (+ electrical door locks) on specific rooms,
• indoor & outdoor security camera to register & control movements in some dedicated areas,
• speed-lane access to the main atrium and both buildings,
• interfacing with new or existing fire-fighting system,
• interfacing to BMS system,
• interfacing to H&R system,
• interfacing to landlord camera systems (if required)

1.6 Security company’s Local Regulations experience


___________________________________________________________________________________________________________________
K24-RFP Security 25-10-2021 Confidential Page 2 of 16
The Contractor should be following and is fully aware and in charge () to obtain all local regulations
and/or authority permits (including but not limited to):
DDA (Dubai Development Authority), DCD (Dubai Civil Defence), Dewa (Dubai Water and Electricity),
TECOM, DCCA (Dubai Department of Civil Aviation), FLS (Fire and Life Safety), FICA (Federal Identity
and Citizenship Authority), Telecom Provider, etc.

1.7 Security Deliverables


The Security stages will be broken down as follows (final delivery order to be defined):
• System & wiring design, creating shop drawings, finalise approvals
• Control flat wiring install (SOW of construction company)
• Indoor Camera installs
• Outdoor day/night Camera install
o sufficient lighting required. Install movement tracking controllers for lights if needed
• Card access install incl. electric door locks
• Speed-lane install
o Same card reading system as above
• Optional X-ray equipment
o Small device, to be installed in security or store room
• Security room install, including desk, control monitors, interfacing servers, recording servers, etc.
o Servers could be located in the main server room in BS15
• Interconnection software with the in 1.5 mentioned SOW
• Configuration of the system
• Training to client users
• Certification
• Final project handover

It is the contractor’s responsibility to sequence the detail Security works of the above stages to ensure
the best possible efficiencies with regards to the Security programme.
The whole project will be awarded as a turn-key solution.

___________________________________________________________________________________________________________________
K24-RFP Security 25-10-2021 Confidential Page 3 of 16
2. DUBAI STUDIO CITY STUDIO LOCATION
The 2 existing buildings are located in Dubai Studio City, known as Boutique Studio Building BS16
and Building BS15 with the adjected UPS room.

As the client isn’t the owner of the buildings, the infill atrium construction between BS15 and BS16
needs to be “independent” in case it needs to be decommissioned for other future usage (> 10
years)

Below shows a satellite view, left building is BS16, right building is BS15
with the UPS room.
The right picture shows the main entrance of BS16 (view from front parking)

___________________________________________________________________________________________________________________
K24-RFP Security 25-10-2021 Confidential Page 4 of 16
3. FLOORPLANS
The below picture shows the proposed front and rear view of the interconnected new building

The below pictures show an artist impression of the main entrance from the outside & inside

The below pictures show an artist impression of the newsroom and mezzanine at the
interconnecting building

The below proposed ground floor floorplan gives a quick overview of the usage of the building.
Both office ground floor levels will be used for typical broadcast usage, including a server data
center.
___________________________________________________________________________________________________________________
K24-RFP Security 25-10-2021 Confidential Page 5 of 16
The main entrance, the atrium and the partial area between the office are an independent new
building.

BS15 ground floor is shell & core, BS16 ground floor has a fit-out but need to be reworked.

The below proposed first floor floorplan gives a quick overview of the usage of the building.
Majority of both office first floor level will be used for office usage.

___________________________________________________________________________________________________________________
K24-RFP Security 25-10-2021 Confidential Page 6 of 16
The main entrance is ground floor level only, the mezzanine of the atrium and the partial area
between the office are the independent new building.

BS15 first floor is shell & core, BS16 first floor has a fit-out but need partial to be reworked.

The below proposed second floor floorplan gives a quick overview of the usage of the building.
Majority of both office second floor level will be used for office usage.

On the roof of the mezzanine level is a small corridor to connect the 2 buildings.
___________________________________________________________________________________________________________________
K24-RFP Security 25-10-2021 Confidential Page 7 of 16
BS15 second floor is shell & core, BS16 second floor has a fit-out but need partial to be reworked.

___________________________________________________________________________________________________________________
K24-RFP Security 25-10-2021 Confidential Page 8 of 16
4. REQUIREMENTS OVERVIEW
The Client wishes to connect two existing buildings together with a so called “infill atrium” which will
be will be three (3) floors (G+2). The building will include a main entrance, a ground floor open office
space called “newsroom” with adjected lounge with (future) canteen facilities, a first-floor open office
space and a 2nd floor interconnecting construction.

Build Contractor required to provide the full build solution for the premises. The Scope of Works
describes, without limitation, the nature of the Works to be executed by the Contractor pursuant to
the Contract. It is intended to provide a summary and general description of the Works and to
highlight factors of particular importance to the Company, which the Contractor must take into
account in executing the Works. The Scope of Works is not exhaustive. The requirements identified
and set out within this document along with annexes, attachments, documents, drawings, etc.,
(inclusive) shall be regarded as the minimum work or minimum standards and specifications of
performance required to be executed or complied by the Contractor under the Contract. This Scope of
Works shall not be taken to comprise all of the Contractor's obligations under the Contract, which
must be construed in light of the Contract read in its entirety.

The Contractor is required to execute engineering (by professional engineering firm), procurement and
supply, provision of services, transportation, logistics, pre-fabrication, fabrication and construction,
connect the building to the utilities, pre-commissioning, commissioning, start-up, required tests and
training, provision of required spares during commissioning, obtaining all necessary permits, etc. in
relation to the Works as described in the contents of this document with relevant addendums. The
Contractor shall supply all the materials necessary for the completion of Works and the materials shall
be suitable for their intended purpose. The Contractor shall ensure that the materials and
workmanship shall be in good order and condition, in conformity in every respect with the
requirements of the Contract, shall comply with the specifications, all relevant codes and standards set
out in the Contract, Good Industry Practices with all applicable Laws and approved by the client.

___________________________________________________________________________________________________________________
K24-RFP Security 25-10-2021 Confidential Page 9 of 16
5. OBJECTIVES
The project is a turn-key lump sum project, the general conditions of final contract shall be based on
the guideline of the FIDIC Red Book “Conditions of Contract for Construction for Buildings and
Engineering Works designed by the Employer”, First Edition 1999, prepared by and obtainable from the
Federation International Des Ingenieurs-Conseils (FIDIC), P.O. Box 86, CH 1000, Lausanne 12,
Switzerland. All provisions of all Articles not specifically amended herein shall remain in full force and
effect.

The RFP tender is leading for technical drawings, recommendation addendum documents, BOQ.
Client would like to highlight the below; but the project is not limited to:

7.1 Mobilisation works


Mobilisation period is not only required to create the designs including shop drawings in close
cooperation with the client, architect and construction company.

7.2 Fire-fighting
A connection needs to be made with the existing and new fire-fighting and/or BMS system. In
case of a fire, all electrical doors need to be unlocked, the speed-lane need to be opened.

7.3 IT wiring works


The construction contractor is responsible for the IT flat wiring (CAT6A) required for CCTV,
access control readers and electric door locks, BMS controlled units, fire-fighting controlled
units, etc. all terminated to the server room in BS15 (or specific control units like fire-fighting
panels, etc), the other end to be specified.
The CCTV cameras and access control readers are in SOW, the electrical door equipment (key
lock or magnet locks) is part of the SOW of the construction company, unless agreed differently.
7.4 Disposables- & waste management
Contractor is fully responsible for clean site, regular cleaning of skip containers. Outside the
fenced area, skip containers need to be covered, in all cases no food disposables are allowed to
put in the skip containers to avoid pets & cats or other presence.

7.5 Safety & Health care on construction site


Client expect the security companies are following the UAE guidelines for employees working on
construction sites, including the by the Dubai Development Authority (DDA) taken steps to
mitigate the impact of COVID-19 on the construction sector!

In the below chapter read Security employer or employee where construction is mentioned.

As a good construction employee, you should (but not limit too) follow the below UAE
construction statements for your employees:
1. Construction and industrial workers are not permitted to work during the hottest hours of
the day during the summer, staff should have designated break time
2. Construction employers are required to provide insurance to their employees.
3. No construction employer may bring or allow others to bring any kind of alcoholic drinks for
consumption on work premises.
4. Construction employers should provide their employees with suitable means of protection
against injuries and dangers such as a fire which may result from the use of machinery and
other work equipment and against occupational diseases which may be contacted during
work.
5. Construction employers shall display in a permanent and visible place at the work site,
detailed instructions regarding the means of preventing fire and the means through which
employees can protect themselves from hazards to which they might be exposed during

___________________________________________________________________________________________________________________
K24-RFP Security 25-10-2021 Confidential Page 10 of 16
work. These instructions shall be in Arabic & English and if necessary, another language
understood by the employee.
6. Construction employers must keep a first aid kit or kits containing medicines, bandages and
other first aid material readily available.
7. Construction employers must take care of
o suitable transportation to/from site
o suitable sun-shade resting area
o suitable drinking water
o first aid services
All the above services will be on the construction employer's account.

Required personnel protection equipment (PPE) must be worn at all times when on
construction site.
All construction employees should ware/use the below PPE:
• Hard Hat () safety helmets.
• Sturdy safety shoes or boots should be worn by all construction people. No flip-flops,
open-toe shoes, sneakers etc. are allowed, if any of these are noticed during client
inspection a fine of AED 1,000.- pp/pd will be given!
• All construction personnel should wear adequate and suitable protective clothing to
protect them from possible hazard due to weather changes, electricity, impacts, and other
risks. For an employee AND visitors, a reflected vest is required.
• Construction employees shall be provided with eye and face protection equipment when
their job have a potential risk of exposing the eyes and face from hazard. They are the
machines operators, welders, grinders, bar bender and the like.
• All personnel handling rough, sharp and excessive coarse material such as reinforcement
bars, rods, pre-cast concrete, toxic, electric and hot materials shall be protected by safety
gloves.
• In the event that noise levels in worksite are too much to handle (over 85 DBA), ear
protected gear are also needed by the site personnel.
• Site employees working at an elevated level to about 2m or more shall be provided by
safety harness or belts to protect them from accidental fall. Anchorage point of the safety
harness shall be placed above the head of the worker and not less than 5 meters from the
ground level.
• Scaffolds should have fall-protection bars and proper ladders to reach each level and shall
only be used with green scaf-tags in date. Wooden ladders shall be removed from site.
• Hot works permits to be obtained prior to execution of works and fire-extinguishers shall
be present at site at all times.
• Electrical cable management shall be undertaken by the Contractor on a daily basis and all
electrical equipment on site shall have correct plugs installed and shall be disconnected
from the power supply when not in use. Unsuitable power tools (i.e., without plugs) shall
be removed from site without prior notice.

___________________________________________________________________________________________________________________
K24-RFP Security 25-10-2021 Confidential Page 11 of 16
6. CONTRACTOR RESPONSIBILITIES
8.1 User Requirements:
The client wishes to construct a new construction of approx. 250m² and fit out the new building
including 2 existing buildings. Each office floor is ~180 m² of offices and 90m² of interlacing
areas.
Contractor to provide the full building based on the following:
• Engineering;
• Procurement;
• Installation;
• All authority approvals in close cooperation with the architect Bluehaus and/or
construction company;
• Any associated works & activity to complete the building as per Info Arab Media
requirements and subject to Info Arab Media satisfaction.

Where card readers are mentioned in below sections, this comes including electrical locks on
top of the door or build in frame and a push button exit unit.

All camera & card access flat wiring will be centralized in either each floor electrical room
and/or the data server room

The below section 8.2 are a quick summary and highlights of the security works
to be executed but not limited to:
8.2 Security Works:
BS15 Ground Floor Area Security works:
o Install indoor camera(s) at lift lobby area
▪ capable to see movements to lift and staircase area
▪ capable to see movements to date center area
▪ capable to see movements to PCR TX rooms and studio areas
o Install indoor camera(s) in TV studio
▪ capable to see movements from the main entrance and nearby elephant door areas
o Install outdoor camera(s) nearby outdoor electrical room
▪ capable to see movements nearby elephant door and outdoor electrical room areas
o Install outdoor camera(s) nearby emergency exit rear door
▪ capable to see movements nearby 3 exit emergency doors
o Install card readers at both doors of the server room
o Install card reader at indoor electrical room
o Install card reader at outdoor walking thru door at shutter elephant door

BS15 First Floor Office Security works:


o Install indoor camera(s) at lift lobby area
▪ capable to see movements to lift and staircase area
▪ capable to see movements to atrium area
o Install card reader at indoor electrical room

BS15 Second Floor Office Security works:


o Install indoor camera(s) at lift lobby area
▪ capable to see movements to lift and staircase area
▪ capable to see movements to door to studio roof
o Install card reader at indoor electrical room

___________________________________________________________________________________________________________________
K24-RFP Security 25-10-2021 Confidential Page 12 of 16
BS16 Ground Floor Area Security works:
o Install indoor camera(s) at lift lobby area
▪ capable to see movements to lift and staircase area
▪ capable to see movements to PCR NOC GFX rooms and studio areas
o Install indoor camera(s) in TV studio
▪ capable to see movements from the main entrance and nearby elephant door areas
o Install outdoor camera(s) nearby outdoor electrical room
▪ capable to see movements nearby elephant door and outdoor electrical room areas
o Install outdoor camera(s) nearby UPS room
▪ capable to see movements into UPS room
o Install outdoor camera(s) nearby emergency exit rear door
▪ capable to see movements nearby 2 emergency exit doors
o Install card reader at indoor electrical room
o Install card reader at outdoor walking th*ru door at shutter elephant door

o BS16 First Floor Office Security works:


o Install indoor camera(s) at lift lobby area
▪ capable to see movements to lift and staircase area
▪ capable to see movements to atrium area
o Install indoor camera inside store room
▪ capable to see movements inside the store room
o Install card reader at indoor electrical room
o Install card reader at store room door

BS16 Second Floor Office Security works:


o Install indoor camera(s) at lift lobby area
▪ capable to see movements to lift and staircase area
▪ capable to see movements to door to studio roof
o Install card reader at indoor electrical room

Ground Floor Atrium Security works:


o Install indoor and/or outdoor camera(s) at main entrance
▪ capable to see movements in & out the building
o Install indoor camera(s) nearby reception
▪ capable to see movements towards main entrance & reception area
▪ capable to see movements nearby speed lane area and VIP newsroom area
o Install indoor camera(s) nearby BS15 lounge area
▪ capable to see movements towards the speed lane
▪ capable to see movements towards the centralized lounge and BS16 building
o Install indoor camera(s) inside central indoor lounge area
▪ capable to see movements into indoor lounge area and door to outdoor lounge area
o Install outdoor camera(s) inside outdoor lounge area
▪ capable to see movements into outdoor lounge area and door to indoor lounge area
o Install card readers at main entrance
▪ Optional keypad security override panel to be installed?
o Install card reader to Newsroom VIP entrance
▪ Optional override from reception desk?
o Install card reader at security room
o Install card reader at store room
o Install card reader at Speedline to open
o Install card reader at outdoor lounge door
o Install speed lane towards BS15 & BS16 corridor
o Install or make provision for small X-ray unit in either security room or store room
o Install security room supplies (servers monitors recorder etc).
▪ Major equipment can be installed in the data server room
___________________________________________________________________________________________________________________
K24-RFP Security 25-10-2021 Confidential Page 13 of 16
First Floor Atrium Security works:
o Install indoor camera(s) at interconnection between BS15 & BS16 building
▪ capable to see movements to/from BS15 & BS16 building
o Install outdoor camera(s) nearby BS16 CAT Ladder to main entrance roof
▪ capable to see movements to the roof

Second Floor Atrium Security works:


o Install indoor camera(s) at interconnection between BS15 & BS16 building
▪ capable to see movements to/from BS15 & BS16 building
o Install outdoor camera(s) interconnection between BS15 & BS16 building
▪ capable to see movements to the atrium roof
o Install card reader(s) to the outdoor atrium roof doors

UPS Room Security works:


o Install outdoor camera(s) nearby UPS room
▪ capable to see movements into UPS room
o Install card reader at UPS room door

8.4 Permits and Approvals:


The Contractor shall identify any permits and approvals that will govern and affect the Project.
All related and required permits and approval (design, construction &function) are the
contractor full responsibility

For the avoidance of doubt the Scope of Works is inclusive (but not limited) to the provision of
the following minimal requirements by the Contractor:

A. All construction stage approvals, permits, licenses, No Objection Certificates (NOC’s), etc. for
the Project. The contractor should be following and is fully aware and in charge (together with
the architect) to get/assist all local regulations and/or authority permits (but not limited to)
like: DDA (Dubai Development Authority), DCD (Dubai Civil Defence), Dewa (Dubai Water and
Electricity), TECOM, DCCA (Dubai Department of Civil Aviation), FLS (Fire and Life Safety), etc.

B. Assist and coordinate with all local authorities to identify their requirements and incorporate
them into the Project.
C. Coordinate with the Client in all matters relating to authority approvals and permits to ensure
that the project is compliant with the Client’s strategy.
D. Responsible for providing documents related to the scope to the Client for submission to local
authorities where applicable.

___________________________________________________________________________________________________________________
K24-RFP Security 25-10-2021 Confidential Page 14 of 16
7. PROJECT COMPLETION STAGE DEFINITIONS
Below is the minimal completion schedule milestone that’s should be followed by the contractor

A. Substantial Completion: Substantial Completion is as determined by the Client At this stage:


1. Major works are complete (design, install and configuration, fully operational , connections
to authorities where applicable)
2. Partial occupancy may be allowed before the final “BOC” if the project has a substantial
completion date. To be determined by the local authorities.
B. Install Completion: All works are complete including snag list / punch list items. Only
remaining works outstanding are agreed snag list / punch list items. At this stage:
1. As-built Drawings and Operation & Maintenance (O&M) manuals are issued by contractor
and approved by the Client;
2. All Government permits and certificates are complete and in place where applicable
C. Final Completion: The Defects and Liability Period has expired and after all the snag list /
punch list items and Defective works have been resolved. At this stage:
1. A Final Handing Over and Completion Certificate is issued.
2. End of Defects Liability Period
3. The Defects Liability Period is subject to extension for those specific works which are not
completed in accordance with the Contract.

___________________________________________________________________________________________________________________
K24-RFP Security 25-10-2021 Confidential Page 15 of 16
APPENDIX A: DRAWING PACKAGE
Attached to this RFP Tender document you will find the General, Architectural, MEP and Fire-Fighting,
drawing package.
Note: The lighting drawings are for illustration and calculation purpose only. Final positions and
fixtures to be defined.

Drawing No. Drawing Title Rev


01-ARCHITECTURAL DRAWINGS 72
23 SERIES - SETTING OUT PLAN
BH2510 AR OFF 23-100-00 GROUND FLOOR - SETTING OUT PLAN B
BH2510 AR OFF 23-101-00 FIRST FLOOR - SETTING OUT PLAN B
BH2510 AR OFF 23-102-00 SECOND FLOOR - SETTING OUT PLAN B

END OF DOCUMENT.

___________________________________________________________________________________________________________________
K24-RFP Security 25-10-2021 Confidential Page 16 of 16
2
Drawings
C3-1 C4-1

C3-2 C4-2

8250 BS-15 C3-3 C4-3 BS-16 8250

5640 C3-4 C4-4 5640


C3-5
C4-5
5848 5848

2557 2557
C3-C C4-C
1
30-001-01
31-001-00

2966
2966
1
PRINTER PANTRY DU ROOM STORE - SECURE STORE - SECURE DU ROOM PANTRY
102-106 102-003 102-503 102-107 102-114 102-504 102-008
C3-B 1.16 m² 1.40 m² 2.75 m² 1.59 m² 1.59 m² 2.75 m² 1.40 m² C4-B

DT-01.10 DT-01.10
CIRCULATION 102-107A 102-114A
102-009
COMMERCIAL 47.86 m² HR MANAGER
MANAGER 102-113 CIRCULATION
102-103 DG-02.02 GENERAL 102-010
102-105A 19.80 m²
11.28 m² DG-02.02 MANAGER 23.68 m²
102-103A EDIT ROOM
ELE. ROOM TOILET 102-108 FFL +8.550 TOILET
102-502 102-002 27.92 m²
TOC +8.350 102-007
ELE. ROOM 102-115
MEETING ROOM 10.96 m² 30-100-00 DG-02.01 102-505 7.63 m²
3.67 m² 102-113A 10.96 m² DT-01.04
102-105 3.67 m² 102-033A

10800
11.20 m² EXTERNAL
1080 0
FFL +8.550
DG-02.02 TOC +8.350 5A PROGRAMS
FFL +8.550 102-108A
COMMERCIAL & TOC +8.350 VOICE OVER DT-01.04 102-118
FFL +8.550 64.06 m²
LEGAL STAFF TOC +8.350 STAIR STAIR 102-116 102-034A
102-102 102-701 MEP RISER HR & FINANCIAL FFL +8.550 MEP RISER 102-704 3.61 m²
FFL +8.550
16.78 m² 11.81 m² 102-501 DG-02.02 TOC +8.350 102-506 11.81 m² TOC +8.350
102-109A 100-018B STAFF
FFL +8.550 3.84 m² CW-11 3.84 m²
102-112
TOC +8.350 MEETING ROOM 28.46 m²
102-104 FFL +8.550
TOC +8.350 DEPUTY GM EDIT ROOM
11.37 m² FFL +8.550
102-109 102-117
TOC +8.350
FFL +8.550 LIFT 23.82 m² LIFT 8.14 m²
DG-02.02 DG-02.02 TOC +8.350 102-702 102-703 DT-01.04
102-104A DG-02.01 102-035A
102-101A 5.03 m² 102-111A 5.03 m²
LEGAL MANAGER
C3-A 102-101 C4-A
DT-03.01
10.07 m² MEETING ROOM 102-118A
102-005
LIFT LOBBY
CIRCULATION 102-006
102-009 DT-03.01 LIFT LOBBY 39.57 m² FINANCE
30-100-01
102-009B 102-001
SECRETARY 10.08 m²
47.86 m² 102-110 MANAGER FFL +8.450 30-100-01
FHC FFL +8.450 11.00 m² DT-03.01 TOC +8.350 FHC
16.62 m² FFL +8.550 102-111
3 TOC +8.350 TOC +8.350 102-006A
DT-03.01 22.96 m² 2
VOID 102-110A VOID
DT-01.09
DT-01.09 102-010A
102-009A

DG-02.02 DG-02.02
102-005A 102-005B
CIRCULATION DM-01.04
DM-01.04 102-004 102-004A 2 30-001-00
102-004B FFL +8.550
46.55 m² TOC +8.350
30-001-01 2
7 102-004E 1 1
102-004C CW-11
CW-11 8 102-004D 30-100-01
CW-11
30-100-01 30-100-02

30-100-01

WL-01

ROOF
FRL
+8.575
51
88

88
51
C3-AD C4-AD

ROOF ROOF

WL-01
28
15

C4-D

15
28
C3-D
22
95

95
22
WL-01
C3-AC C4-AC
34
53

53
34
C4-7 C3-7
CAT LADDER
C3-E C4-E
16
58

58
C3-2' C4-2'

16
C3-AB ROOF BELOW C4-AB
53
36

36
53
C3-F C4-F

6 7
1
30-100-00
30-100-00

2 30-100-00 3
C3-AA C4-AA
C3-1' C4-1'

30-001-00

1 2
31-001-00 31-001-00
C3-1 C4-1

C3-2 C4-2

8250 BS-15 C3-3 C4-3 BS-16 8250

5640 C3-4 C4-4 5640


C3-5
C4-5
5848 5848

2557 2557
C3-C C4-C
1
30-001-01
31-001-00

2966
2966
1
PRINTER PANTRY DU ROOM STORE - SECURE STORE - SECURE DU ROOM PANTRY
102-106 102-003 102-503 102-107 102-114 102-504 102-008
C3-B 1.16 m² 1.40 m² 2.75 m² 1.59 m² 1.59 m² 2.75 m² 1.40 m² C4-B

DT-01.10 DT-01.10
CIRCULATION 102-107A 102-114A
102-009
COMMERCIAL 47.86 m² HR MANAGER
MANAGER 102-113 CIRCULATION
102-103 DG-02.02 GENERAL 102-010
102-105A 19.80 m²
11.28 m² DG-02.02 MANAGER 23.68 m²
102-103A EDIT ROOM
ELE. ROOM TOILET 102-108 FFL +8.550 TOILET
102-502 102-002 27.92 m²
TOC +8.350 102-007
ELE. ROOM 102-115
MEETING ROOM 10.96 m² 30-100-00 DG-02.01 102-505 7.63 m²
3.67 m² 102-113A 10.96 m² DT-01.04
102-105 3.67 m² 102-033A

10800
11.20 m² EXTERNAL
10800

FFL +8.550
DG-02.02 TOC +8.350 5A PROGRAMS
FFL +8.550 102-108A
COMMERCIAL & TOC +8.350 VOICE OVER DT-01.04 102-118
FFL +8.550 64.06 m²
LEGAL STAFF TOC +8.350 STAIR STAIR 102-116 102-034A
102-102 102-701 MEP RISER HR & FINANCIAL FFL +8.550 MEP RISER 102-704 3.61 m²
FFL +8.550
16.78 m² 11.81 m² 102-501 DG-02.02 TOC +8.350 102-506 11.81 m² TOC +8.350
102-109A 100-018B STAFF
FFL +8.550 3.84 m² CW-11 3.84 m²
102-112
TOC +8.350 MEETING ROOM 28.46 m²
102-104 FFL +8.550
TOC +8.350 DEPUTY GM EDIT ROOM
11.37 m² FFL +8.550
102-109 102-117
TOC +8.350
FFL +8.550 LIFT 23.82 m² LIFT 8.14 m²
DG-02.02 DG-02.02 TOC +8.350 102-702 DG-02.01 102-703 DT-01.04
102-101A 102-104A 102-035A
5.03 m² 102-111A 5.03 m²
LEGAL MANAGER
C3-A 102-101 C4-A
DT-03.01
10.07 m² MEETING ROOM 102-118A
102-005
LIFT LOBBY
CIRCULATION 102-006
102-009 DT-03.01 LIFT LOBBY 39.57 m² FINANCE
30-100-01
102-009B 102-001
SECRETARY 10.08 m²
47.86 m² 102-110 MANAGER FFL +8.450 30-100-01
FHC FFL +8.450 11.00 m² DT-03.01 TOC +8.350 FHC
16.62 m² FFL +8.550 102-111
3 TOC +8.350 TOC +8.350 102-006A
DT-03.01 22.96 m² 2
VOID 102-110A VOID
DT-01.09
DT-01.09 102-010A
102-009A

DG-02.02 DG-02.02
102-005A 102-005B
CIRCULATION DM-01.04
DM-01.04 102-004 102-004A 2 30-001-00
102-004B FFL +8.550
46.55 m² TOC +8.350
30-001-01 2
7 102-004E 1 1
102-004C CW-11
CW-11 8 102-004D 30-100-01
CW-11
30-100-01 30-100-02

30-100-01

WL-01

ROOF
FRL
+8.575
51
88

88
51
C3-AD C4-AD

ROOF ROOF

WL-01
28
15

C4-D

15
28
C3-D
22
95

95
22
WL-01
C3-AC C4-AC
34
53

53
34
C4-7 C3-7
CAT LADDER
C3-E C4-E
16
58

58
C3-2' C4-2'

16
C3-AB ROOF BELOW C4-AB
53
36

36
53
C3-F C4-F

6 7
1
30-100-00
30-100-00

2 30-100-00 3
C3-AA C4-AA
C3-1' C4-1'

30-001-00

1 2
31-001-00 31-001-00
C3-1 C4-1

C3-2 C4-2

8250 BS-15 C3-3 C4-3 BS-16 8250

5640 C3-4 C4-4 5640


C3-5
C4-5
5848 5848

2557 2557
C3-C C4-C
1
30-001-01
31-001-00

2966
2966
1
PRINTER PANTRY DU ROOM STORE - SECURE STORE - SECURE DU ROOM PANTRY
102-106 102-003 102-503 102-107 102-114 102-504 102-008
C3-B 1.16 m² 1.40 m² 2.75 m² 1.59 m² 1.59 m² 2.75 m² 1.40 m² C4-B

DT-01.10 DT-01.10
CIRCULATION 102-107A 102-114A
102-009
COMMERCIAL 47.86 m² HR MANAGER
MANAGER 102-113 CIRCULATION
102-103 DG-02.02 GENERAL 102-010
102-105A 19.80 m²
11.28 m² DG-02.02 MANAGER 23.68 m²
102-103A EDIT ROOM
ELE. ROOM TOILET 102-108 FFL +8.550 TOILET
102-502 102-002 27.92 m²
TOC +8.350 102-007
ELE. ROOM 102-115
MEETING ROOM 10.96 m² 30-100-00 DG-02.01 102-505 7.63 m²
3.67 m² 102-113A 10.96 m² DT-01.04
102-105 3.67 m² 102-033A

10800
11.20 m² EXTERNAL
10800

FFL +8.550
DG-02.02 TOC +8.350 5A PROGRAMS
FFL +8.550 102-108A
COMMERCIAL & TOC +8.350 VOICE OVER DT-01.04 102-118
FFL +8.550 64.06 m²
LEGAL STAFF TOC +8.350 STAIR STAIR 102-116 102-034A
102-102 102-701 MEP RISER HR & FINANCIAL FFL +8.550 MEP RISER 102-704 3.61 m²
FFL +8.550
16.78 m² 11.81 m² 102-501 DG-02.02 TOC +8.350 102-506 11.81 m² TOC +8.350
102-109A 100-018B STAFF
FFL +8.550 3.84 m² CW-11 3.84 m²
102-112
TOC +8.350 MEETING ROOM 28.46 m²
102-104 FFL +8.550
TOC +8.350 DEPUTY GM EDIT ROOM
11.37 m² FFL +8.550
102-109 102-117
TOC +8.350
FFL +8.550 LIFT 23.82 m² LIFT 8.14 m²
DG-02.02 DG-02.02 TOC +8.350 102-702 DG-02.01 102-703 DT-01.04
102-101A 102-104A 102-035A
5.03 m² 102-111A 5.03 m²
LEGAL MANAGER
C3-A 102-101 C4-A
DT-03.01
10.07 m² MEETING ROOM 102-118A
102-005
LIFT LOBBY
CIRCULATION 102-006
102-009 DT-03.01 LIFT LOBBY 39.57 m² FINANCE
30-100-01
102-009B 102-001
SECRETARY 10.08 m²
47.86 m² 102-110 MANAGER FFL +8.450 30-100-01
FHC FFL +8.450 11.00 m² DT-03.01 TOC +8.350 FHC
16.62 m² FFL +8.550 102-111
3 TOC +8.350 TOC +8.350 102-006A
DT-03.01 22.96 m² 2
VOID 102-110A VOID
DT-01.09
DT-01.09 102-010A
102-009A

DG-02.02 DG-02.02
102-005A 102-005B
CIRCULATION DM-01.04
DM-01.04 102-004 102-004A 2 30-001-00
102-004B FFL +8.550
46.55 m² TOC +8.350
30-001-01 2
7 102-004E 1 1
102-004C CW-11
CW-11 8 102-004D 30-100-01
CW-11
30-100-01 30-100-02

30-100-01

WL-01

ROOF
FRL
+8.575
51
88

88
51
C3-AD C4-AD

ROOF ROOF

WL-01
28
1

C4-D
5

15
28
C3-D
22
95

95
22
WL-01
C3-AC C4-AC
34
53

35
34
C4-7 C3-7
CAT LADDER
C3-E C4-E
16
58

58
C3-2' C4-2'

16
C3-AB ROOF BELOW C4-AB
53
36

36
53
C3-F C4-F

6 7
1
30-100-00
30-100-00

2 30-100-00 3
C3-AA C4-AA
C3-1' C4-1'

30-001-00

1 2
31-001-00 31-001-00
C3-1 C4-1

C3-2 C4-2

825 0 BS-15 C3-3 C4-3 BS-16 8250

5640 C3-4 C4-4 5640


C3-5
C4-5
5848 5848

2557 2557
C3-C C4-C
1
30-001-01
31-001-00

2966
2966
1
PRINTER PANTRY DU ROOM STORE - SECURE STORE - SECURE DU ROOM PANTRY
102-106 102-003 102-503 102-107 102-114 102-504 102-008
C3-B 1.16 m² 1.40 m² 2.75 m² 1.59 m² 1.59 m² 2.75 m² 1.40 m² C4-B

DT-01.10 DT-01.10
CIRCULATION 102-107A 102-114A
102-009
COMMERCIAL 47.86 m² HR MANAGER
MANAGER 102-113 CIRCULATION
102-103 DG-02.02 GENERAL 102-010
102-105A 19.80 m²
11.28 m² DG-02.02 MANAGER 23.68 m²
102-103A EDIT ROOM
ELE. ROOM TOILET 102-108 FFL +8.550 TOILET
102-502 102-002 27.92 m²
TOC +8.350 102-007
ELE. ROOM 102-115
MEETING ROOM 10.96 m² 30-100-00 DG-02.01 102-505 7.63 m²
3.67 m² 102-113A 10.96 m² DT-01.04
102-105 3.67 m² 102-033A

10800
11.20 m² EXTERNAL
10800

FFL +8.550
DG-02.02 TOC +8.350 5A PROGRAMS
FFL +8.550 102-108A
COMMERCIAL & TOC +8.350 VOICE OVER DT-01.04 102-118
FFL +8.550 64.06 m²
LEGAL STAFF TOC +8.350 STAIR STAIR 102-116 102-034A
102-102 102-701 MEP RISER HR & FINANCIAL FFL +8.550 MEP RISER 102-704 3.61 m²
FFL +8.550
16.78 m² 11.81 m² 102-501 DG-02.02 TOC +8.350 102-506 11.81 m² TOC +8.350
102-109A 100-018B STAFF
FFL +8.550 3.84 m² CW-11 3.84 m²
102-112
TOC +8.350 MEETING ROOM 28.46 m²
102-104 FFL +8.550
TOC +8.350 DEPUTY GM EDIT ROOM
11.37 m² FFL +8.550
102-109 102-117
TOC +8.350
FFL +8.550 LIFT 23.82 m² LIFT 8.14 m²
DG-02.02 DG-02.02 TOC +8.350 102-702 DG-02.01 102-703 DT-01.04
102-101A 102-104A 102-035A
5.03 m² 102-111A 5.03 m²
LEGAL MANAGER
C3-A 102-101 C4-A
DT-03.01
10.07 m² MEETING ROOM 102-118A
102-005
LIFT LOBBY
CIRCULATION 102-006
102-009 DT-03.01 LIFT LOBBY 39.57 m² FINANCE
30-100-01
102-009B 102-001
SECRETARY 10.08 m²
47.86 m² 102-110 MANAGER FFL +8.450 30-100-01
FHC FFL +8.450 11.00 m² DT-03.01 TOC +8.350 FHC
16.62 m² FFL +8.550 102-111
3 TOC +8.350 TOC +8.350 102-006A
DT-03.01 22.96 m² 2
VOID 102-110A VOID
DT-01.09
DT-01.09 102-010A
102-009A

DG-02.02 DG-02.02
102-005A 102-005B
CIRCULATION DM-01.04
DM-01.04 102-004 102-004A 2 30-001-00
102-004B FFL +8.550
46.55 m² TOC +8.350
30-001-01 2
7 102-004E 1 1
102-004C CW-11
CW-11 8 102-004D 30-100-01
CW-11
30-100-01 30-100-02

30-100-01

WL-01

ROOF
FRL
+8.575
51
88

88
51
C3-AD C4-AD

ROOF ROOF

WL-01
28
15

C4-D

15
28
C3-D
22
95

95
22
WL-01
C3-AC C4-AC
34
53

53
34
C4-7 C3-7
CAT LADDER
C3-E C4-E
16
58

58
C3-2' C4-2'

16
C3-AB ROOF BELOW C4-AB
53
36

36
53
C3-F C4-F

6 7
1
30-100-00
30-100-00

2 30-100-00 3
C3-AA C4-AA
C3-1' C4-1'

30-001-00

1 2
31-001-00 31-001-00
C3-1 C4-1

C3-2 C4-2

8250 BS-15 C3-3 C4-3 BS-16 8250

5640 C3-4 C4-4 5640


C3-5
C4-5
5848 5848

2557 2557
C3-C C4-C
1
30-001-01
31-001-00

2966
296 6
1 POWDER COATED
PANTRY DU ROOM STORE ALUMINIUM LOUVRE, DU ROOM PANTRY
101-002 101-503 101-103 RAL 7022, AS PER 101-504 101-012
1.40 m² 2.75 m² 1.67 m² DRAWINGS, DETAILS 2.75 m² 1.40 m²
C3-B AND SPECS C4-B

DT-01.10
101-103A
HEAD OF HEAD OF
PROGRAM CIRCULATION TECHNOLOGY 4 30-100-00 5
CIRCULATION
101-101 101-003 101-104 101-011
11.46 m² 6.96 m² DG-02.02 15.27 m² 6.96 m²
101-104A
DG-02.02 EDIT ROOM
101-101A ELE. ROOM TOILET ELE. ROOM
TOILET 101-110
101-502 101-505
101-004 101-010 7.63 m²
3.67 m² 30-100-00 3.67 m² DT-01.04
10.96 m² 10.96 m²
101-110A

10800
1 0800

PROGRAM 5A OPERATIONS
WEB 101-113
DEPARTMENT VOICE OVER DT-01.04
DEVELOPMENT & 63.82 m²
101-102 101-111 101-111A

ALL
77.23 m²
MEP RISER MEDIA STORE MEP RISER 3.61 m²
101-501 MANAGERS 101-109 101-506 FFL +4.550

VIDEO W
3.84 m² 101-108 20.13 m² 3.84 m² TOC +4.350
FFL +4.550
TOC +4.350 STAIR 68.61 m² STAIR
101-701 TECHNOLOGY 101-704
DEPT. EDIT ROOM
11.81 m² FFL +4.550 11.81 m²
LIFT 101-105 100-018B LIFT 101-112
CW-11 TOC +4.350
101-702 72.58 m² 101-703 8.14 m²
5.03 m² DT-01.08 5.03 m² DT-01.04
DT-03.01 101-112A
101-102A FFL +4.550 101-109A
TOC +4.350
C3-A OPEN OFFICE DT-03.01 C4-A
101-107 101-113A
39.77 m²
30-100-01 LIFT LOBBY
LIFT LOBBY FFL +4.450 101-008
101-005 TOC +4.250 30-100-01
11.02 m²
3 11.02 m² DT-03.01
DT-03.01 101-108A
FHC 101-105A FHC 2
PANTRY PANTRY
101-001 101-009
11.60 m² CIRCULATION CIRCULATION 11.60 m²
101-006 101-006
DG-02.03 HOLD OPEN DG-02.03
58.93 m² 101-006A HOLD OPEN 101-006B 58.93 m²
DOOR DOOR
ROOF ROOF
CIRCULATION FFL +4.450 DT-01.10
101-006 101-007A
2 30-001-00
TOC +4.250
DT-01.10 DT-03.01 DT-01.10 58.93 m² DT-01.10
30-001-01 2 101-106B 101-106C 101-106A 101-007B
MEETING 1
EXISTING SLAB 101-007 EXISTING SLAB
OPENINGS TO OPENINGS TO
19.88 m² 30-100-01
BE CLOSED BE CLOSED
RAILING FFL +4.450
DIGITAL TOC +4.250
101-106 GL-12
64.55 m²
RAILING
FFL +4.450 GL-12
TOC +4.250
LIGHTING TRUSS BY
CLIENT, 500KG OF
APPROX. WEIGHT
51

VOID
88

88
51
C3-AD C4-AD

VOID
28
15

C4-D

15
VOID

28
C3-D 6
54-001-00
22
95

59
22
WL-01 WL-01
C3-AC C4-AC
34
53

53
34
C4-7 C3-7
CAT LADDER
RC. PLINTH
C3-E WL-01 WL-01 C4-E
16
58

58
C3-2' C4-2'

16
C3-AB
RC PLINTH
AS PER MEP REQUIREMENTS
ROOF RC PLINTH
AS PER MEP REQUIREMENTS C4-AB
WL-01 WL-01
53

FRL
36

+4.575

36
53
C3-F ROOF DRAIN ROOF DRAIN C4-F

6 7
100-001B 1 100-010B
30-100-00 CW-11 CW-11 30-100-00

2 30-100-00 3
C3-AA C4-AA
C3-1' C4-1'

30-001-00

1
31-001-00
2
31-001-00
C3-1 C4-1

C3-2 C4-2

8250 BS-15 C3-3 C4-3 BS-16 8250

5640 C3-4 C4-4 5640


C3-5
C4-5
5848 5848

2557 2557
C3-C C4-C
1
30-001-01
31-001-00

2966
2966
1 POWDER COATED
PANTRY DU ROOM STORE ALUMINIUM LOUVRE, DU ROOM PANTRY
101-002 101-503 101-103 RAL 7022, AS PER 101-504 101-012
1.40 m² 2.75 m² 1.67 m² DRAWINGS, DETAILS 2.75 m² 1.40 m²
C3-B AND SPECS C4-B

DT-01.10
101-103A
HEAD OF HEAD OF
PROGRAM CIRCULATION TECHNOLOGY 4 30-100-00 5
CIRCULATION
101-101 101-003 101-104 101-011
11.46 m² 6.96 m² DG-02.02 15.27 m² 6.96 m²
101-104A
DG-02.02 EDIT ROOM
101-101A ELE. ROOM TOILET ELE. ROOM
TOILET 101-110
101-502 101-505
101-004 101-010 7.63 m²
3.67 m² 30-100-00 3.67 m² DT-01.04
10.96 m² 10.96 m²
101-110A

10800
10800

PROGRAM 5A OPERATIONS
WEB 101-113
DEPARTMENT VOICE OVER DT-01.04
DEVELOPMENT & 101-111
63.82 m²
101-102 101-111A

ALL
77.23 m²
MEP RISER MEDIA STORE MEP RISER 3.61 m²
101-501 MANAGERS 101-109 101-506 FFL +4.550

VIDEO W
3.84 m² 101-108 20.13 m² 3.84 m² TOC +4.350
FFL +4.550
TOC +4.350 STAIR 68.61 m² STAIR
101-701 TECHNOLOGY 101-704
DEPT. EDIT ROOM
11.81 m² FFL +4.550 11.81 m²
LIFT 101-105 100-018B LIFT 101-112
CW-11 TOC +4.350
101-702 72.58 m² 101-703 8.14 m²
5.03 m² DT-01.08 5.03 m² DT-01.04
DT-03.01 101-112A
101-102A FFL +4.550 101-109A
TOC +4.350
C3-A OPEN OFFICE DT-03.01 C4-A
101-107 101-113A
39.77 m²
30-100-01 LIFT LOBBY
LIFT LOBBY FFL +4.450 101-008
101-005 TOC +4.250 30-100-01
11.02 m²
3 11.02 m² DT-03.01
DT-03.01 101-108A
FHC 101-105A FHC 2
PANTRY PANTRY
101-001 101-009
11.60 m² CIRCULATION CIRCULATION 11.60 m²
101-006 101-006
DG-02.03 HOLD OPEN DG-02.03
58.93 m² 101-006A HOLD OPEN 101-006B 58.93 m²
DOOR DOOR
ROOF ROOF
CIRCULATION FFL +4.450 DT-01.10
101-006 101-007A
2 30-001-00
TOC +4.250
DT-01.10 DT-03.01 DT-01.10 58.93 m² DT-01.10
30-001-01 2 101-106B 101-106C 101-106A 101-007B
MEETING 1
EXISTING SLAB 101-007 EXISTING SLAB
OPENINGS TO OPENINGS TO
19.88 m² 30-100-01
BE CLOSED BE CLOSED
RAILING FFL +4.450
DIGITAL TOC +4.250
101-106 GL-12
64.55 m²
RAILING
FFL +4.450 GL-12
TOC +4.250
LIGHTING TRUSS BY
CLIENT, 500KG OF
APPROX. WEIGHT
51

VOID
88

88
51
C3-AD C4-AD

VOID
28
15

C4-D

15
VOID

28
C3-D 6
54-001-00
22
95

95
22
WL-01 WL-01
C3-AC C4-AC
34
35

53
34
C4-7 C3-7
CAT LADDER
RC. PLINTH
C3-E WL-01 WL-01 C4-E
16
58

58
C3-2' C4-2'

16
C3-AB
RC PLINTH
AS PER MEP REQUIREMENTS
ROOF RC PLINTH
AS PER MEP REQUIREMENTS C4-AB
WL-01 WL-01
53

FRL
36

+4.575

36
53
C3-F ROOF DRAIN ROOF DRAIN C4-F

6 7
100-001B 1 100-010B
30-100-00 CW-11 CW-11 30-100-00

2 30-100-00 3
C3-AA C4-AA
C3-1' C4-1'

30-001-00

1
31-001-00
2
31-001-00
C3-1 C4-1

C3-2 C4-2

8250 BS-15 C3-3 C4-3 BS-16 8250

5640 C3-4 C4-4 5640


C3-5
C4-5
5848 5848

2557 2557
C3-C C4-C
1
30-001-01
31-001-00

2966
2966
1 POWDER COATED
PANTRY DU ROOM STORE ALUMINIUM LOUVRE, DU ROOM PANTRY
101-002 101-503 101-103 RAL 7022, AS PER 101-504 101-012
1.40 m² 2.75 m² 1.67 m² DRAWINGS, DETAILS 2.75 m² 1.40 m²
C3-B AND SPECS C4-B

DT-01.10
101-103A
HEAD OF HEAD OF
PROGRAM CIRCULATION TECHNOLOGY 4 30-100-00 5
CIRCULATION
101-101 101-003 101-104 101-011
11.46 m² 6.96 m² DG-02.02 15.27 m² 6.96 m²
101-104A
DG-02.02 EDIT ROOM
101-101A ELE. ROOM TOILET ELE. ROOM
TOILET 101-110
101-502 101-505
101-004 101-010 7.63 m²
3.67 m² 30-100-00 3.67 m² DT-01.04
10.96 m² 10.96 m²
101-110A

10800
10800

PROGRAM 5A OPERATIONS
WEB 101-113
DEPARTMENT VOICE OVER DT-01.04
DEVELOPMENT & 63.82 m²
101-102 101-111 101-111A

ALL
77.23 m²
MEP RISER MEDIA STORE MEP RISER 3.61 m²
101-501 MANAGERS 101-109 101-506 FFL +4.550

VIDEO W
3.84 m² 101-108 20.13 m² 3.84 m² TOC +4.350
FFL +4.550
TOC +4.350 STAIR 68.61 m² STAIR
101-701 TECHNOLOGY 101-704
DEPT. EDIT ROOM
11.81 m² FFL +4.550 11.81 m²
LIFT 101-105 100-018B LIFT 101-112
CW-11 TOC +4.350
101-702 72.58 m² 101-703 8.14 m²
5.03 m² DT-01.08 5.03 m² DT-01.04
DT-03.01 101-112A
101-102A FFL +4.550 101-109A
TOC +4.350
C3-A OPEN OFFICE DT-03.01 C4-A
101-107 101-113A
39.77 m²
30-100-01 LIFT LOBBY
LIFT LOBBY FFL +4.450 101-008
101-005 TOC +4.250 30-100-01
11.02 m²
3 11.02 m² DT-03.01
DT-03.01 101-108A
FHC 101-105A FHC 2
PANTRY PANTRY
101-001 101-009
11.60 m² CIRCULATION CIRCULATION 11.60 m²
101-006 101-006
DG-02.03 HOLD OPEN DG-02.03
58.93 m² 101-006A HOLD OPEN 101-006B 58.93 m²
DOOR DOOR
ROOF ROOF
CIRCULATION FFL +4.450 DT-01.10
101-006 101-007A
2 30-001-00
TOC +4.250
DT-01.10 DT-03.01 DT-01.10 58.93 m² DT-01.10
30-001-01 2 101-106B 101-106C 101-106A 101-007B
MEETING 1
EXISTING SLAB 101-007 EXISTING SLAB
OPENINGS TO OPENINGS TO
19.88 m² 30-100-01
BE CLOSED BE CLOSED
RAILING FFL +4.450
DIGITAL TOC +4.250
101-106 GL-12
64.55 m²
RAILING
FFL +4.450 GL-12
TOC +4.250
LIGHTING TRUSS BY
CLIENT, 500KG OF
APPROX. WEIGHT
51

VOID
88

88
51
C3-AD C4-AD

VOID
28
15

C4-D

15
VOID

28
C3-D 6
54-001-00
22
95

95
22
WL-01 WL-01
C3-AC C4-AC
34
53

53
34
C4-7 C3-7
CAT LADDER
RC. PLINTH
C3-E WL-01 WL-01 C4-E
16
58

58
C3-2' C4-2'

16
C3-AB
RC PLINTH
AS PER MEP REQUIREMENTS
ROOF RC PLINTH
AS PER MEP REQUIREMENTS C4-AB
WL-01 WL-01
53

FRL
36

+4.575

36
53
C3-F ROOF DRAIN ROOF DRAIN C4-F

6 7
100-001B 1 100-010B
30-100-00 CW-11 CW-11 30-100-00

2 30-100-00 3
C3-AA C4-AA
C3-1' C4-1'

30-001-00

1
31-001-00
2
31-001-00
C3-1 C4-1

C3-2 C4-2

8250 BS-15 C3-3 C4-3 BS-16 8250

5640 C3-4 C4-4 5640


C3-5
C4-5
5848 5848

2557 2557
C3-C C4-C
1
30-001-01
31-001-00

2966
2966
1 POWDER COATED
PANTRY DU ROOM STORE ALUMINIUM LOUVRE, DU ROOM PANTRY
101-002 101-503 101-103 RAL 7022, AS PER 101-504 101-012
1.40 m² 2.75 m² 1.67 m² DRAWINGS, DETAILS 2.75 m² 1.40 m²
C3-B AND SPECS C4-B

DT-01.10
101-103A
HEAD OF HEAD OF
PROGRAM CIRCULATION TECHNOLOGY 4 30-100-00 5
CIRCULATION
101-101 101-003 101-104 101-011
11.46 m² 6.96 m² DG-02.02 15.27 m² 6.96 m²
101-104A
DG-02.02 EDIT ROOM
101-101A ELE. ROOM TOILET ELE. ROOM
TOILET 101-110
101-502 101-505
101-004 101-010 7.63 m²
3.67 m² 30-100-00 3.67 m² DT-01.04
10.96 m² 10.96 m²
101-110A

10800
10800

PROGRAM 5A OPERATIONS
WEB 101-113
DEPARTMENT VOICE OVER DT-01.04
DEVELOPMENT & 101-111
63.82 m²
101-102 101-111A

ALL
77.23 m²
MEP RISER MEDIA STORE MEP RISER 3.61 m²
101-501 MANAGERS 101-109 101-506 FFL +4.550

VIDEO W
3.84 m² 101-108 20.13 m² 3.84 m² TOC +4.350
FFL +4.550
TOC +4.350 STAIR 68.61 m² STAIR
101-701 TECHNOLOGY 101-704
DEPT. EDIT ROOM
11.81 m² FFL +4.550 11.81 m²
LIFT 101-105 100-018B LIFT 101-112
CW-11 TOC +4.350
101-702 72.58 m² 101-703 8.14 m²
5.03 m² DT-01.08 5.03 m² DT-01.04
DT-03.01 101-112A
101-102A FFL +4.550 101-109A
TOC +4.350
C3-A OPEN OFFICE DT-03.01 C4-A
101-107 101-113A
39.77 m²
30-100-01 LIFT LOBBY
LIFT LOBBY FFL +4.450 101-008
101-005 TOC +4.250 30-100-01
11.02 m²
3 11.02 m² DT-03.01
DT-03.01 101-108A
FHC 101-105A FHC 2
PANTRY PANTRY
101-001 101-009
11.60 m² CIRCULATION CIRCULATION 11.60 m²
101-006 101-006
DG-02.03 HOLD OPEN DG-02.03
58.93 m² 101-006A HOLD OPEN 101-006B 58.93 m²
DOOR DOOR
ROOF ROOF
CIRCULATION FFL +4.450 DT-01.10
101-006 101-007A
2 30-001-00
TOC +4.250
DT-01.10 DT-03.01 DT-01.10 58.93 m² DT-01.10
30-001-01 2 101-106B 101-106C 101-106A 101-007B
MEETING 1
EXISTING SLAB 101-007 EXISTING SLAB
OPENINGS TO OPENINGS TO
19.88 m² 30-100-01
BE CLOSED BE CLOSED
RAILING FFL +4.450
DIGITAL TOC +4.250
101-106 GL-12
64.55 m²
RAILING
FFL +4.450 GL-12
TOC +4.250
LIGHTING TRUSS BY
CLIENT, 500KG OF
APPROX. WEIGHT
51

VOID
88

88
51
C3-AD C4-AD

VOID
28
15

C4-D

15
VOID

28
C3-D 6
54-001-00
22
95

95
22
WL-01 WL-01
C3-AC C4-AC
34
53

35
34
C4-7 C3-7
CAT LADDER
RC. PLINTH
C3-E WL-01 WL-01 C4-E
16
58

58
C3-2' C4-2'

16
C3-AB
RC PLINTH
AS PER MEP REQUIREMENTS
ROOF RC PLINTH
AS PER MEP REQUIREMENTS C4-AB
WL-01 WL-01
53

FRL
36

+4.575

36
53
C3-F ROOF DRAIN ROOF DRAIN C4-F

6 7
100-001B 1 100-010B
30-100-00 CW-11 CW-11 30-100-00

2 30-100-00 3
C3-AA C4-AA
C3-1' C4-1'

30-001-00

1
31-001-00
2
31-001-00
C3-1 C4-1

C3-2 C4-2

8250 BS-15 C3-3 C4-3 BS-16 8250

5640 C3-4 C4-4 5640


C3-5
C4-5
5848 5848

2557 2557
C3-C C4-C
1
30-001-01
3 4 31-001-00 6 7
40-002-00 40-002-00 40-002-00 40-002-00

2966
FLL

2966
FLL FLL FLL
+0.450 +0.550 1 +0.550
DU ROOM DU ROOM +0.450
PANTRY PANTRY
100-017 100-505 100-507 100-023
1.20 m² 2.75 m² 2.75 m² 1.20 m²
C3-B UP UP UP C4-B
DM-02.01 DM-02.01 UP DM-02.01 DM-02.01 DM-02.01
100-105B 100-015A 100-025A 100-027A 100-021A
TRELLIS ABOVE

FFL
DT-01.06 +0.650
100-506B EDIT ROOM
FFL FFL +0.750 100-116
TX +0.550 TOC +0.350
4 30-100-00 5 6.45 m² DT-01.04
100-105
CIRCULATION CIRCULATION 100-116A
22.58 m² 100-027
100-025 FFL +0.450
25.89 m² SMOKING/ LOUNGE TERRACE 25.89 m²
FFL +0.550 TOC +0.350
TOC +0.350 ELE. ROOM TOILET FFL +0.550 5 NOC-MCR TOILET ELE. ROOM
100-504 100-016 TOC +0.350 100-111
FFL +0.550 DG-02.03
100-022 100-508 EDIT ROOM
40-002-00 30-100-00 TOC +0.350 100-111A
100-115

CRAC
DT-01.01 3.67 m² 10.96 m² 29.35 m² 10.96 m² 3.67 m²

CIRCULATION
100-105A 6.38 m²
DT-01.04

10800
10.40 m²
100-015
10800

100-115A
5A

CIRCULATION
FLL
+0.150
CREATIVE DEPT.
SERVER ROOM 100-117

100-021
9.96 m²
STAIR 100-506 UP STAIR 39.30 m²
PCR-1 100-701 MEP RISER MEP RISER 100-704
100-104 69.82 m² EDIT ROOM
11.81 m² 100-503 100-509 11.81 m² FFL +0.550
49.08 m² 100-018B 100-114
3.84 m² FFL +0.750 DG-02.03 3.84 m² TOC +0.350
TOC +0.350 CW-11 IG-01.02 100-110A
6.54 m²
100-018A DT-01.04
100-114A
DT-01.07 DT-01.07

CRAC
100-701B 100-704B
LIFT LIFT
100-702 FFL +0.550 100-703 TRANSLATION-2
TOC +0.350 TRANSLATION-1 100-113
5.03 m² 5.03 m²
FFL +0.550 100-112 2.61 m²
TOC +0.350 DG-02.03 2.77 m² DG-01.01
100-104A DG-01.01 100-113A
C3-A LOUNGE FFL +0.550 100-112A
C4-A
DT-01.05 FFL +0.550 TOC +0.350 DT-01.05
DT-03.01 CIRCULATION TOC +0.350
100-018 DW CIRCULATION
100-104B 100-701A 100-704A
100-024 LIFT LOBBY 39.71 m² 100-028 FFL +0.550
PCR-2 DT-03.01 +0.350
30-100-01
4.42 m² FFL +0.550 100-014 LIFT LOBBY 100-028A 6.23 m² TOC
FFL +0.450 100-110 30-100-01
TOC +0.350 10.98 m² 100-019
TOC +0.350 FFL +0.450 40.32 m²

CRAC
3 VESTIBULE FHC DT-01.06
FFL TOC +0.350 10.98 m² FHC
+0.650 VESTIBULE 2
UP ELE. ROOM
100-013 100-506A
FFL 100-020 UP 2
3.75 m² +0.550 FFL +0.750
2 FFL +0.450 40-002-00
100-502 TOC +0.350
TOC +0.350 DT-03.01
3.75 m² ELE. ROOM
6.70 m² 100-126C 100-510
40-002-00
DM-01.01 6.70 m² DM-01.01
100-103A
100-109A

FFL +0.450 DT-03.01


CORRIDOR CIRCULATION TOC +0.250 100-126B CORRIDOR
1 100-026 2 30-001-00
100-103 DT-02.03 100-109
40-004-00 4.48 m² 33.29 m² 100-126A 4.48 m²
DT-02.03
30-001-01 2 100-106A
HEAD OF NEWS
100-107 1
19.54 m²
METAL FENCING LOUNGE 30-100-01
WITH ACCESS 100-012 FFL +0.450
GATE TOC +0.250
67.20 m²

FFL +0.450
TOC +0.250

C4-AD

NEWS ROOM
100-106
141.12 m²

8
51

8
51
88

2 FFL +0.450
C3-AD TOC +0.250
40-004-00
DB's + BATTERIES

METAL SLAB ABOVE


EL

FENCING
CO TRIC
EC
NT AL FO

STUDIO SETS - STUDIO SETS -


RA TR R

BS15 BS16

15
28
CT EN PU

CIRCULATION

28
15

100-102 100-108
OR C RP

251.86 m² 100-011 251.86 m²


TO HES OSE

10.87 m² C4-D
VE ON
RIF S

C3-D FFL +0.450


FFL +0.450 TOC +0.200
Y E ITE

TOC +0.250

95
22

22
XIS AR

95
TIN E F

GENERATOR -
G IT

3 DG-03.03
OPEN TO SKY 100-106B
40-004-00
C3-AC DT-01.10 C4-AC
100-302A STORE

53
34

34
53

100-302
4.95 m²
C4-7 C3-7
Q RISER
C3-E RECEPTION 100-511 C4-E
PRAYER (F) PRAYER (M) 100-006 HC TOILET(F) HC TOILET(M) 0.86 m²
100-003 100-004 7.07 m² 100-007 100-008
16

58
58

16
5.43 m² 6.44 m² 4.20 m² 4.19 m²
C3-2' C4-2' FFL +0.450 FFL +0.450
METAL FENCING TOC +0.350 TOC +0.350
UPS DT-01.01 DT-01.01 DT-01.01 DT-01.01
100-003A 100-004A 100-007A 100-008A
RISER LOBBY
100-501 100-005 DT-01.02
C3-AB 46.04 m² 100-010A C4-AB
0.91 m² DT-03.05 DT-03.05
100-105C 100-105D
DT-01.01 DT-01.01 FFL +0.450 DT-01.02 MAKE-UP (M/F)

36
53

TOC +0.350

53
100-001A 100-002A 100-301A
36

100-010
C3-F DT-01.02 16.83 m² C4-F
GREEN ROOM 100-009A
100-001 IG-01.01
24.10 m² MEETING ROOM 100-005A
SECURITY ROOM CHANGE ROOM

15
29

100-002 100-301 100-009


1890

1890

29
15

80 6.79 m² 6.79 m² 7.00 m²


FLL 100-005B

240
UL-01
310 390

310 390

UL-01 +0.450 CW-11 BIB TAPS


6 2750 2750 2750 UL-01 2750 2750 2750
310

310

UL-01 UL-01 UL-01 UL-01


LANDSCAPE - UL-01 UL-01 7 LANDSCAPE -
PLANTERBOX UL-01
1 PLANTERBOX
30-100-00 100-001B 250 100-010B 30-100-00
CW-11 UP 250 250 250 UP CW-11
2 30-100-00 3
C3-AA C4-AA
C3-1' C4-1'

1 FLL
1 +0.150

40-003-00 30-001-00 1
40-002-00
2
1 31-001-00
31-001-00
C3-1 C4-1

C3-2 C4-2

8250 BS-15 C3-3 C4-3 BS-16 8250

5640 C3-4 C4-4 5640


C3-5
C4-5
5848 5848

2557 2557
C3-C C4-C
1
30-001-01
3 4 31-001-00 6 7
40-002-00 40-002-00 40-002-00 40-002-00

2966
FLL

2966
FLL FLL FLL
+0.450 +0.550 1 +0.550
DU ROOM DU ROOM +0.450
PANTRY PANTRY
100-017 100-505 100-507 100-023
C3-B 1.20 m² 2.75 m² 2.75 m² 1.20 m²
UP UP UP C4-B
DM-02.01 DM-02.01 UP DM-02.01 DM-02.01 DM-02.01
100-105B 100-015A 100-025A 100-027A 100-021A
TRELLIS ABOVE

FFL
DT-01.06 +0.650
100-506B EDIT ROOM
FFL FFL +0.750 100-116
TX +0.550 TOC +0.350
4 30-100-00 5 6.45 m² DT-01.04
100-105
CIRCULATION CIRCULATION 100-116A
22.58 m² 100-027
100-025 FFL +0.450
25.89 m² SMOKING/ LOUNGE TERRACE 25.89 m²
FFL +0.550 TOC +0.350
TOC +0.350 ELE. ROOM TOILET FFL +0.550 5 NOC-MCR TOILET ELE. ROOM
100-504 100-016 TOC +0.350 100-111
FFL +0.550 DG-02.03
100-022 100-508 EDIT ROOM
40-002-00 30-100-00 TOC +0.350 100-111A
100-115

CRAC
DT-01.01 3.67 m² 10.96 m² 29.35 m² 10.96 m² 3.67 m²

CIRCULATION
100-105A 6.38 m²
DT-01.04

10800
10.40 m²
100-015
10800

100-115A
5A FLL

CIRCULATION
+0.150
CREATIVE DEPT.
SERVER ROOM 100-117

100-021
9.96 m²
STAIR 100-506 UP STAIR 39.30 m²
PCR-1 100-701 MEP RISER MEP RISER 100-704
100-104 69.82 m² EDIT ROOM
11.81 m² 100-503 100-509 11.81 m² FFL +0.550
49.08 m² 100-018B 100-114
3.84 m² FFL +0.750 DG-02.03 3.84 m² TOC +0.350
TOC +0.350 CW-11 IG-01.02 100-110A
6.54 m²
100-018A DT-01.04
100-114A
DT-01.07 DT-01.07

CRAC
100-701B 100-704B
LIFT LIFT
100-702 FFL +0.550 100-703 TRANSLATION-2
TOC +0.350 TRANSLATION-1 100-113
5.03 m² 5.03 m²
FFL +0.550 100-112 2.61 m²
TOC +0.350 DG-02.03 2.77 m² DG-01.01
100-104A DG-01.01 100-113A
C3-A LOUNGE FFL +0.550 100-112A
C4-A
DT-01.05 FFL +0.550 TOC +0.350 DT-01.05
DT-03.01 CIRCULATION TOC +0.350
100-018 DW CIRCULATION
100-104B 100-701A 100-704A
100-024 LIFT LOBBY 39.71 m² 100-028 FFL +0.550
PCR-2 DT-03.01 +0.350
30-100-01
4.42 m² FFL +0.550 100-014 LIFT LOBBY 100-028A 6.23 m² TOC
FFL +0.450 100-110 30-100-01
TOC +0.350 10.98 m² 100-019
TOC +0.350 FFL +0.450 40.32 m²

CRAC
3 VESTIBULE FHC DT-01.06
FFL TOC +0.350 10.98 m² FHC
+0.650 VESTIBULE 2
UP ELE. ROOM
100-013 100-506A
FFL 100-020 UP 2
3.75 m² +0.550 FFL +0.750
2 FFL +0.450 40-002-00
100-502 TOC +0.350
TOC +0.350 DT-03.01
3.75 m² ELE. ROOM
6.70 m² 100-126C 100-510
40-002-00
DM-01.01 6.70 m² DM-01.01
100-103A
100-109A

FFL +0.450 DT-03.01


CORRIDOR CIRCULATION TOC +0.250 100-126B CORRIDOR
1 100-026 2 30-001-00
100-103 DT-02.03 100-109
40-004-00 4.48 m² 33.29 m² 100-126A 4.48 m²
DT-02.03
30-001-01 2 100-106A
HEAD OF NEWS
100-107 1
19.54 m²
METAL FENCING LOUNGE 30-100-01
WITH ACCESS 100-012 FFL +0.450
GATE TOC +0.250
67.20 m²

FFL +0.450
TOC +0.250

C4-AD

NEWS ROOM
100-106
141.12 m²

88
51

51
88

2 FFL +0.450
C3-AD TOC +0.250
40-004-00
DB's + BATTERIES

METAL SLAB ABOVE


EL

FENCING
CO TRIC
EC
NT AL FO

STUDIO SETS - STUDIO SETS -


RA TR R

BS15 BS16

15
28
CT EN PU

CIRCULATION

28
15

100-102 100-108
OR C RP

251.86 m² 100-011 251.86 m²


TO HES OSE

10.87 m² C4-D
VE ON
RIF S

FFL +0.450
C3-D FFL +0.450 TOC +0.200
Y E ITE

TOC +0.250

95
22

22
XIS AR

95
TIN E F

GENERATOR -
G IT

3 DG-03.03
OPEN TO SKY 100-106B
40-004-00
C3-AC DT-01.10 C4-AC
100-302A STORE

53
34

34
53

100-302
4.95 m²
C4-7 C3-7
Q RISER
C3-E RECEPTION 100-511 C4-E
PRAYER (F) PRAYER (M) 100-006 HC TOILET(F) HC TOILET(M) 0.86 m²
100-003 100-004 7.07 m² 100-007 100-008
16

58
5

16
6.44 m² 4.20 m² 4.19 m²
8

5.43 m² C3-2' C4-2' FFL +0.450 FFL +0.450


METAL FENCING TOC +0.350 TOC +0.350
UPS DT-01.01 DT-01.01 DT-01.01 DT-01.01
100-003A 100-004A 100-007A 100-008A
RISER LOBBY
100-501 100-005 DT-01.02
C3-AB 46.04 m² 100-010A C4-AB
0.91 m² DT-03.05 DT-03.05
100-105C 100-105D
DT-01.01 DT-01.01 FFL +0.450 DT-01.02 MAKE-UP (M/F)

36
53

TOC +0.350

53
100-001A 100-002A 100-301A
36

100-010
C3-F DT-01.02 16.83 m² C4-F
GREEN ROOM 100-009A
100-001 IG-01.01
24.10 m² MEETING ROOM 100-005A
SECURITY ROOM CHANGE ROOM

15
29

100-002 100-301 100-009


1890

1890

29
15

80 6.79 m² 6.79 m² 7.00 m²


FLL 100-005B

240
UL-01
310 390

310 390

UL-01 +0.450 CW-11 BIB TAPS


6 2750 2750 2750 UL-01 2750 2750 2750
310

310

UL-01 UL-01 UL-01 UL-01


LANDSCAPE - UL-01 UL-01 7 LANDSCAPE -
PLANTERBOX UL-01
1 PLANTERBOX
30-100-00 100-001B 250 100-010B 30-100-00
CW-11 UP 250 250 250 UP CW-11
2 30-100-00 3
C3-AA C4-AA
C3-1' C4-1'

1 FLL
1 +0.150

40-003-00 30-001-00 1
40-002-00
2
1 31-001-00
31-001-00
C3-1 C4-1

C3-2 C4-2

8250 BS-15 C3-3 C4-3 BS-16 8250

5640 C3-4 C4-4 5640


C3-5
C4-5
5848 5848

2557 2557
C3-C C4-C
1
30-001-01
3 4 31-001-00 6 7
40-002-00 40-002-00 40-002-00 40-002-00

2966
FLL

2 966
FLL FLL FLL
+0.450 +0.550 1 +0.550
DU ROOM DU ROOM +0.450
PANTRY PANTRY
100-017 100-505 100-507 100-023
1.20 m² 2.75 m² 2.75 m² 1.20 m²
C3-B UP UP UP C4-B
DM-02.01 DM-02.01 UP DM-02.01 DM-02.01 DM-02.01
100-105B 100-015A 100-025A 100-027A 100-021A
TRELLIS ABOVE

FFL
DT-01.06 +0.650
100-506B EDIT ROOM
FFL FFL +0.750 100-116
TX +0.550 TOC +0.350
4 30-100-00 5 6.45 m² DT-01.04
100-105
CIRCULATION CIRCULATION 100-116A
22.58 m² 100-027
100-025 FFL +0.450
25.89 m² SMOKING/ LOUNGE TERRACE 25.89 m²
FFL +0.550 TOC +0.350
TOC +0.350 ELE. ROOM TOILET FFL +0.550 FRONT 5 NOC-MCR TOILET ELE. ROOM
100-504 100-016 TOC +0.350 100-111
FFL +0.550 DG-02.03
100-022 100-508 EDIT ROOM
FRONT 40-002-00 30-100-00 TOC +0.350 100-111A
100-115

CRAC
DT-01.01 3.67 m² 10.96 m² 29.35 m² 10.96 m² 3.67 m²

CIRCULATION
100-105A 6.38 m²
DT-01.04

10800
10.40 m²
100-015
10800

100-115A
5A

CIRCULATION
FLL
REAR +0.150
CREATIVE DEPT.
REARSERVER ROOM 100-117

100-021
9.96 m²
STAIR 100-506 UP STAIR 39.30 m²
PCR-1 100-701 MEP RISER MEP RISER 100-704
100-104 69.82 m² EDIT ROOM
11.81 m² 100-503 100-509 11.81 m² FFL +0.550
49.08 m² 100-018B 100-114
3.84 m² FFL +0.750 DG-02.03 3.84 m² TOC +0.350
TOC +0.350 FRONT CW-11 IG-01.02 100-110A
6.54 m²
100-018A DT-01.04
100-114A
DT-01.07 FRONT DT-01.07

CRAC
100-701B 100-704B
LIFT LIFT
100-702 FFL +0.550 100-703 TRANSLATION-2
TOC +0.350 TRANSLATION-1 100-113
5.03 m² 5.03 m²
REAR 100-112 2.61 m²
FFL +0.550
TOC +0.350 DG-02.03 REAR 2.77 m² DG-01.01
100-104A DG-01.01 100-113A
C3-A LOUNGE FFL +0.550 100-112A
C4-A
DT-01.05 FFL +0.550 100-018 TOC +0.350 DT-01.05
DT-03.01 CIRCULATION TOC +0.350 DW CIRCULATION
100-104B 100-701A 100-704A
100-024 LIFT LOBBY 39.71 m² 100-028 FFL +0.550
FRONT PCR-2 DT-03.01 +0.350
30-100-01
4.42 m² FFL +0.550 100-014 LIFT LOBBY 100-028A 6.23 m² TOC
FFL +0.450 100-110 30-100-01
TOC +0.350 10.98 m² 100-019
TOC +0.350 FFL +0.450 40.32 m²

CRAC
3 VESTIBULE FHC DT-01.06
FFL TOC +0.350 10.98 m² FHC
+0.650 VESTIBULE 2
UP ELE. ROOM
100-013 100-506A
FFL 100-020 UP 2
3.75 m² +0.550 FFL +0.750
2 FFL +0.450 40-002-00
100-502 TOC +0.350
TOC +0.350 DT-03.01
3.75 m² ELE. ROOM
6.70 m² 100-126C 100-510
40-002-00
DM-01.01 6.70 m² DM-01.01
100-103A
100-109A

FFL +0.450 DT-03.01


CORRIDOR CIRCULATION TOC +0.250 100-126B CORRIDOR
1 100-026 2 30-001-00
100-103 DT-02.03 100-109
40-004-00 4.48 m² 33.29 m² 100-126A 4.48 m²
DT-02.03
30-001-01 2 No Floorbox 100-106A
HEAD OF NEWS No Floorbox
Laydown free floating cables 100-107 Laydown free floating cables 1
19.54 m²
METAL FENCING LOUNGE 30-100-01
WITH ACCESS 100-012 FFL +0.450
GATE TOC +0.250
67.20 m²

FFL +0.450
TOC +0.250

C4-AD

NEWS ROOM
100-106
141.12 m²

88
51

51
88

2 FFL +0.450
C3-AD TOC +0.250
40-004-00
DB's + BATTERIES

METAL SLAB ABOVE


EL

FENCING
CO TRIC
EC
NT AL FO

STUDIO SETS - STUDIO SETS -


RA TR R

BS15 BS16

15
28
CT EN PU

CIRCULATION

28
15

100-102 100-108
OR C RP

251.86 m² 100-011 251.86 m²


TO HES OSE

10.87 m² C4-D
VE ON
RIF S

C3-D FFL +0.450


FFL +0.450 TOC +0.200
Y E ITE

TOC +0.250

95
22

22
XIS AR

95
TIN E F

GENERATOR -
G IT

3 DG-03.03
OPEN TO SKY 100-106B
40-004-00
C3-AC DT-01.10 C4-AC
100-302A STORE

53
34

34
53

100-302
4.95 m²
C4-7 C3-7
Q RISER
C3-E RECEPTION 100-511 C4-E
PRAYER (F) PRAYER (M) 100-006 HC TOILET(F) HC TOILET(M) 0.86 m²
100-003 100-004 7.07 m² 100-007 100-008
16

58
58

16
5.43 m² 6.44 m² 4.20 m² 4.19 m²
C3-2' C4-2' FFL +0.450 FFL +0.450
METAL FENCING TOC +0.350 TOC +0.350
UPS DT-01.01 DT-01.01 DT-01.01 DT-01.01
100-003A 100-004A 100-007A 100-008A
RISER LOBBY
100-501 100-005 DT-01.02
C3-AB 46.04 m² 100-010A C4-AB
0.91 m² DT-03.05 DT-03.05
100-105C 100-105D
DT-01.01 DT-01.01 FFL +0.450 DT-01.02 MAKE-UP (M/F)

36
53

TOC +0.350

53
100-001A 100-002A 100-301A
36

100-010
C3-F DT-01.02 16.83 m² C4-F
GREEN ROOM 100-009A
100-001 IG-01.01
24.10 m² MEETING ROOM 100-005A
SECURITY ROOM CHANGE ROOM

15
29

100-002 100-301 100-009


1890

1890

29
15

80 6.79 m² 6.79 m² 7.00 m²


FLL 100-005B

240
UL-01
310 390

310 390

UL-01 +0.450 CW-11 BIB TAPS


6 2750 2750 2750 UL-01 2750 2750 2750
310

310

UL-01 UL-01 UL-01 UL-01


LANDSCAPE - UL-01 UL-01 7 LANDSCAPE -
PLANTERBOX UL-01
1 PLANTERBOX
30-100-00 100-001B 250 100-010B 30-100-00
CW-11 UP 250 250 250 UP CW-11
2 30-100-00 3
C3-AA C4-AA
C3-1' C4-1'

1 FLL
1 +0.150

40-003-00 30-001-00 1
40-002-00
2
1 31-001-00
31-001-00
C3-1 C4-1

C3-2 C4-2

8250 BS-15 C3-3 C4-3 BS-16 8250

5640 C3-4 C4-4 5640


C3-5
C4-5
5848 5848

2557 2557
C3-C C4-C
1
30-001-01
3 4 31-001-00 6 7
40-002-00 40-002-00 40-002-00 40-002-00

2966
FLL

2966
FLL FLL FLL
+0.450 +0.550 1 +0.550
DU ROOM DU ROOM +0.450
PANTRY PANTRY
100-017 100-505 100-507 100-023
1.20 m² 2.75 m² 2.75 m² 1.20 m²
C3-B UP UP UP C4-B
DM-02.01 DM-02.01 UP DM-02.01 DM-02.01 DM-02.01
100-105B 100-015A 100-025A 100-027A 100-021A
TRELLIS ABOVE

FFL
DT-01.06 +0.650
100-506B EDIT ROOM
FFL FFL +0.750 100-116
TX +0.550 TOC +0.350
4 30-100-00 5 6.45 m² DT-01.04
100-105
CIRCULATION CIRCULATION 100-116A
22.58 m² 100-027
100-025 FFL +0.450
25.89 m² SMOKING/ LOUNGE TERRACE 25.89 m²
FFL +0.550 TOC +0.350
TOC +0.350 ELE. ROOM TOILET FFL +0.550 5 NOC-MCR TOILET ELE. ROOM
100-504 100-016 TOC +0.350 100-111
FFL +0.550 DG-02.03
100-022 100-508 EDIT ROOM
40-002-00 TOC +0.350 100-111A
30-100-00 100-115

CRAC
DT-01.01 3.67 m² 10.96 m² 29.35 m² 10.96 m² 3.67 m²

CIRCULATION
100-105A 6.38 m²
DT-01.04

10800
10.40 m²
100-015
10800
100-115A
5A

CIRCULATION
FLL
+0.150
CREATIVE DEPT.
SERVER ROOM 100-117

100-021
9.96 m²
STAIR 100-506 UP STAIR 39.30 m²
PCR-1 100-701 MEP RISER MEP RISER 100-704
100-104 69.82 m² EDIT ROOM
11.81 m² 100-503 100-509 11.81 m² FFL +0.550
49.08 m² 100-018B 100-114
3.84 m² FFL +0.750 DG-02.03 3.84 m² TOC +0.350
TOC +0.350 CW-11 IG-01.02 100-110A
6.54 m²
100-018A DT-01.04
100-114A
DT-01.07 DT-01.07

CRAC
100-701B 100-704B
LIFT LIFT
100-702 FFL +0.550 100-703 TRANSLATION-2
TOC +0.350 TRANSLATION-1 100-113
5.03 m² 5.03 m²
FFL +0.550 100-112 2.61 m²
TOC +0.350 DG-02.03 2.77 m² DG-01.01
100-104A DG-01.01 100-113A
C3-A LOUNGE FFL +0.550 100-112A
C4-A
DT-01.05 FFL +0.550 100-018 TOC +0.350 DT-01.05
DT-03.01 CIRCULATION TOC +0.350 DW CIRCULATION
100-104B 100-701A 100-704A
100-024 LIFT LOBBY 39.71 m² 100-028 FFL +0.550
PCR-2 DT-03.01 +0.350
30-100-01
4.42 m² FFL +0.550 100-014 LIFT LOBBY 100-028A 6.23 m² TOC
FFL +0.450 100-110 30-100-01
TOC +0.350 10.98 m² 100-019
TOC +0.350 FFL +0.450 40.32 m²

CRAC
3 VESTIBULE FHC DT-01.06
FFL TOC +0.350 10.98 m² FHC
+0.650 VESTIBULE 2
UP ELE. ROOM
100-013 100-506A
FFL 100-020 UP 2
3.75 m² +0.550 FFL +0.750
2 FFL +0.450 40-002-00
100-502 TOC +0.350
TOC +0.350 DT-03.01
3.75 m² ELE. ROOM
6.70 m² 100-126C 100-510
40-002-00
DM-01.01 6.70 m² DM-01.01
100-103A
100-109A

FFL +0.450 DT-03.01


CORRIDOR CIRCULATION TOC +0.250 100-126B CORRIDOR
1 100-026 2 30-001-00
100-103 DT-02.03 100-109
40-004-00 4.48 m² 33.29 m² 100-126A 4.48 m²
DT-02.03
30-001-01 2 100-106A
HEAD OF NEWS
100-107 1
19.54 m²
METAL FENCING LOUNGE 30-100-01
WITH ACCESS 100-012 FFL +0.450
GATE TOC +0.250
67.20 m²

FFL +0.450
TOC +0.250

C4-AD

NEWS ROOM
100-106
141.12 m²

88
51

51
88

2 FFL +0.450
C3-AD TOC +0.250
40-004-00
DB's + BATTERIES

METAL SLAB ABOVE


EL

FENCING
CO TRIC
EC
NT AL FO

STUDIO SETS - STUDIO SETS -


RA TR R

BS15 BS16

15
28
CT EN PU

CIRCULATION

28
1

100-102 100-108
5
OR C RP

251.86 m² 100-011 251.86 m²


TO HES OSE

10.87 m² C4-D
VE ON
RIF S

C3-D FFL +0.450


FFL +0.450 TOC +0.200
Y E ITE

TOC +0.250

95
22

22
XIS AR

9 5
TIN E F

GENERATOR -
G IT

3 DG-03.03
OPEN TO SKY 100-106B
40-004-00
C3-AC DT-01.10 C4-AC
100-302A STORE

53
34

34
53

100-302
4.95 m²
C4-7 C3-7
Q RISER
C3-E RECEPTION 100-511 C4-E
PRAYER (F) PRAYER (M) 100-006 HC TOILET(F) HC TOILET(M) 0.86 m²
100-003 100-004 7.07 m² 100-007 100-008
16

58
5

16
6.44 m² 4.20 m² 4.19 m²
8

5.43 m² C3-2' C4-2' FFL +0.450 FFL +0.450


METAL FENCING TOC +0.350 TOC +0.350
UPS DT-01.01 DT-01.01 DT-01.01 DT-01.01
100-003A 100-004A 100-007A 100-008A
RISER LOBBY
100-501 100-005 DT-01.02
C3-AB 46.04 m² 100-010A C4-AB
0.91 m² DT-03.05 DT-03.05
100-105C 100-105D
DT-01.01 DT-01.01 FFL +0.450 DT-01.02 MAKE-UP (M/F)

36
53

TOC +0.350

53
100-001A 100-002A 100-301A
36

100-010
C3-F DT-01.02 16.83 m² C4-F
GREEN ROOM 100-009A
100-001 IG-01.01
24.10 m² MEETING ROOM 100-005A
SECURITY ROOM CHANGE ROOM

15
29

100-002 100-301 100-009


1890

1890

29
15

80 6.79 m² 6.79 m² 7.00 m²


FLL 100-005B

240
UL-01
310 390

310 390

UL-01 +0.450 CW-11 BIB TAPS


6 2750 2750 2750 UL-01 2750 2750 2750
310

310

UL-01 UL-01 UL-01 UL-01


LANDSCAPE - UL-01 UL-01 7 LANDSCAPE -
PLANTERBOX UL-01
1 PLANTERBOX
30-100-00 100-001B 250 100-010B 30-100-00
CW-11 UP 250 250 250 UP CW-11
2 30-100-00 3
C3-AA C4-AA
C3-1' C4-1'

1 FLL
1 +0.150

40-003-00 30-001-00 1
40-002-00
2
1 31-001-00
31-001-00
3
Vendor List