Sector report 12MP tabling next month hangs in the balance


9 Feb 2021 UNDERWEIGHT
Joshua Ng (Maintained)
ng-chin-yuing@ambankgroup.com
03-2036 2293 Rationale for report: Sector update
Investment Highlights

 The uncertainty surrounding the tabling of the 12th Malaysia Plan (12MP) scheduled for March 2021 (prior to the declaration
of a state of emergency nationwide from 12 Jan to 1 Aug 2021) reinforces our UNDERWEIGHT stance on the local
construction sector over the next 6–12 month.

 It has been close to a month since the suspension of parliament following the declaration of a state of emergency
nationwide. However, it is still unclear if the tabling of the 12MP (2021–2025) would be postponed to another date, or the
government would roll out the 5-year development plan for the nation in the absence of the scrutiny by parliament (in which
case, the legitimacy of the plan could be subject to challenges in future).

 Flashback to the year 2015, its predecessor the 11th Malaysia Plan (11MP) (2016–2020) was tabled by the then Prime
Minister Datuk Seri Najib Razak on 21 May 2015 and debated by the members of parliament for five days from 25 May
2015. Thereafter, replies from ministries were heard for three days before the plan was finally approved by parliament
slightly past midnight on 16 June 2015. It took close to a month to compete the entire process.

 The uncertainty surrounding the 12MP aside, we maintain our view that the government will have very limited room for
fiscal manoeuvre given the elevated national debt, weighed down further by the economic impact of the pandemic
(including reduced tax and petroleum revenues), as well as the massive relief spending to cushion the economic impact
of the pandemic. All these have culminated in Fitch Ratings’ Dec 2020 downgrade of Malaysia’s long-term foreign-currency
issuer default rating to ‘BBB+’ from ‘A-‘, on the heels of S&P Global Ratings’ June 2020 downgrade of Malaysia’s outlook
to negative from stable. We believe the recent termination of the KL–Singapore high-speed rail project should serve as a
wake-up call to the market.

 Operationally, construction players are subject to higher operating cost and lower efficiency (due to restrictions on working
hours and worker density on the site, and the additional expenses incurred in upgrading the dormitory for foreign workers
in compliance with the Worker’ Minimum Standards of Housing and Amenities Act 1990, also known as Act 446) and
higher operating risk (due to the potential stop-work order or enhanced movement control order or EMCO on the dormitory
in the event of Covid-19 infections, shortage of foreign workers as borders remain largely closed and the policy to reduce
the country’s reliance on foreign workers).

 Amidst the uncertainty in the rollout of public infrastructure projects locally, a number of players have ventured or returned
to overseas markets. For instance, Sunway Construction in 2020 bagged two highway projects worth more than RM800mil
in India on a hybrid annuity model, while Econpile secured a US$85.7mil (RM347.6mil) piling and substructure work
subcontract for an “integrated entertainment complex” in Phnom Penh, Cambodia. Meanwhile, Gamuda has been
shortlisted for two tunnelling packages of the A$20bil (RM60bil) Sydney Metro West and the A$2.6bil (RM7.8bil) Sydney
M6 motorway in Australia.

 We may upgrade our UNDERWEIGHT call on the sector to NEUTRAL/OVERWEIGHT if the government decides to forge
ahead with the implementation of key public infrastructure projects, despite the weak fiscal position.
 We do not have any top pick for the sector.
Construction Sector 9 Feb 2021

EXHIBIT 1: VALUATION MATRIX


Recomm. Price FV Upside Mkt Cap FYE EPS (sen) EPS growth (%) P/E (x) P/B* ROE* NDPS* Div Yield*
(RM) (RM) (%) (RMmil) FY20F FY21F FY20F FY21F FY20F FY21F (x) (%) (sen) (%)
Gamuda HOLD 3.45 3.81 10.3 8,541.7 Jul 20.2 22.0 -27.1 8.9 17.1 15.7 1.0 6.5 9.0 2.6
IJM Corp# UNDERWEIGHT 1.52 1.09 -28.3 5,511.1 Mar 4.3 9.5 -59.8 120.9 35.3 16.0 0.6 3.5 6.0 3.9
SunCon UNDERWEIGHT 1.51 1.55 2.6 1,952.3 Dec 5.3 12.9 -47.0 143.4 28.5 11.7 2.6 23.9 7.0 4.6
Econpile UNDERWEIGHT 0.45 0.18 -59.6 595.2 Jun 0.6 2.2 -68.4 266.7 74.2 20.2 1.4 7.0 0.5 1.1
HSL HOLD 0.95 0.90 -4.8 550.7 Dec 6.3 11.3 -33.7 79.4 15.0 8.4 0.6 7.5 1.4 1.5
Kimlun HOLD 0.76 0.79 4.6 242.1 Dec 3.8 9.9 -76.3 160.5 19.9 7.6 0.3 4.8 3.3 4.4
Weighted Average -42.0 72.7 26.1 15.2 1.0
*FY21 #FY20F and FY21F refer to FY21F and FY22F
Source: AmInvestment Bank

EXHIBIT 2: MEGA PROJECTS


Project Value Status
(RM bil) On-going Pending
Penang Transport Master Plan 46.0 √
East Coast Rail Link 44.0 √
MRT2 30.5 √
MRT3 21.0 √
LRT3 16.6 √
Pan Borneo Highway, Sarawak 16.5 √
Pan Borneo Highway, Sabah 12.8 √
Coastal Road, Second Trunk Road and 11 mega bridges in Sarawak 11.0 √
Central Spine Road 10.7 √
Sarawak-Sabah Link Road 5.2 √
Klang Valley Double Track (Phase 2) 4.5 √
Rasau water treatment plant 4.5 √
Johor Bahru-Singapore Rapid Transit System (JB-Singapore RTS) 3.2 √
Source: AmInvestment Bank, various news reports

AmInvestment Bank Bhd 2


Construction Sector 9 Feb 2021

DISCLOSURE AND DISCLAIMER

This report is prepared for information purposes only and it is issued by AmInvestment Bank Berhad (“AmInvestment”)
without regard to your individual financial circumstances and objectives. Nothing in this report shall constitute an offer to
sell, warranty, representation, recommendation, legal, accounting or tax advice, solicitation or expression of views to
influence any one to buy or sell any real estate, securities, stocks, foreign exchange, futures, investment or other products.
AmInvestment recommends that you evaluate a particular investment or strategy based on your individual circumstances
and objectives and/or seek financial, legal or other advice on the appropriateness of the particular investment or strategy.
The information in this report was obtained or derived from sources that AmInvestment believes are reliable and correct at
the time of issue. While all reasonable care has been taken to ensure that the stated facts are accurate and views are fair
and reasonable, AmInvestment has not independently verified the information and does not warrant or represent that they
are accurate, adequate, complete or up-to-date and they should not be relied upon as such. All information included in this
report constitute AmInvestment’s views as of this date and are subject to change without notice. Notwithstanding that,
AmInvestment has no obligation to update its opinion or information in this report. Facts and views presented in this report
may not reflect the views of or information known to other business units of AmInvestment’s affiliates and/or related
corporations (collectively, “AmBank Group”).
This report is prepared for the clients of AmBank Group and it cannot be altered, copied, reproduced, distributed or
republished for any purpose without AmInvestment’s prior written consent. AmInvestment, AmBank Group and its respective
directors, officers, employees and agents (“Relevant Person”) accept no liability whatsoever for any direct, indirect or
consequential losses, loss of profits and/or damages arising from the use or reliance of this report and/or further
communications given in relation to this report. Any such responsibility is hereby expressly disclaimed.
AmInvestment is not acting as your advisor and does not owe you any fiduciary duties in connection with this report. The
Relevant Person may provide services to any company and affiliates of such companies in or related to the securities or
products and/or may trade or otherwise effect transactions for their own account or the accounts of their customers which
may give rise to real or potential conflicts of interest.
This report is not directed to or intended for distribution or publication outside Malaysia. If you are outside Malaysia, you
should have regard to the laws of the jurisdiction in which you are located.
If any provision of this disclosure and disclaimer is held to be invalid in whole or in part, such provision will be deemed not
to form part of this disclosure and disclaimer. The validity and enforceability of the remainder of this disclosure and disclaimer
will not be affected.

AmInvestment Bank Bhd 3

You might also like