Saudi Aramco Inspection Checklist: HDPE Liner Final Inspection SAIC-A-1017 15-Nov-17 Civil
Saudi Aramco Inspection Checklist: HDPE Liner Final Inspection SAIC-A-1017 15-Nov-17 Civil
00 30-Jun-16
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
HDPE Liner Final Inspection SAIC-A-1017 15-Nov-17 Civil-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A Final Inspection
Visually inspect each seam and each connection of the liner. Suspected
A1 Method Statement
areas, breaks or holes shall be marked and repaired.
All field seams shall be tested either by Air Pressure testing or Spark
A2 Method Statement
testing or Vacuum testing as applicable, to ensure water tight sealing.
Defective / failed seams shall be marked, repaired and retested using any
A3 one method of testing. Testing procedure is elaborately discussed in Method Statement
attached " Construction Quality Assurance Inspection Testing Plan"
REMARKS:
REFERENCE DOCUMENTS:
1- SAES-A-104 -- Wastewater Treatment, Reuse and Disposal, 16 March 2016