You are on page 1of 223

General Guidelines and instructions for:

'Standard Details Manual for Water Supply


and Sanitation Facilities in Somalia'
1 The 'Standard Details Manual Model' can be used to compute the cost of different water supply and sanitation
technologies in various parts of Somalia.

2 The 'Standard Details Manual Model' is based on standard Bill of Quantities. The bills of quantities are based
on the dimensions of the various water supply and sanitation facilities as presented in 'Volume III of III - Book of
drawings for the standard details manual for water supply and sanitation facilities in Somalia'

3 The spreadsheets have been customized whereby the user is required to work out the unit rate of the
constituent components of a facility and insert these in the corresponding Unit Rates column cell of the affected
component. All other cells are password protected. When the unit rates are entered in the corresponding line
items, the total line cost and consequently the total cost of the facility is worked out automatically.

4 Users are only required to enter the unit rates in the cells thus marked as below in the standard bills of
quantities for the various facilities.

5 Incase the dimensions or the assumptions from which the facilities are designed upon vary, the user is required
to contact the UNICEF office to be availed with "UN-PROTECTED" spreadsheets which he can use. This will
allow the user to amend the quantities as appropriate. It should however be noted that any significant alteration
of the dimensions, sizes or layouts of these standard designs may alter to a great extent the assumptions made
during design. This may affect the functionality of the designs and it is advised that if such is the case, specialist
advice should be sought.

6 The line amount is obtained by multiplying the quantity with the corresponding rates.

7 The page sub-total is obtained by summing up the amounts for each of the corresponding pages. The subtotals
for each page are carried to the collection page summary.

8 The total cost of the facility is obtained by summing the collection summary at the end of each bill. This is the
cost for constructing the facility.

9 For a complete project such as the water yard, the separate bills of quantities for the corresponding project
component can be combined together to come up with the project cost. Example: The following components
can be combined to form a complete project for a water yard;

a) Generator house
b) Caretakers room
c) Animal troughs
d) Toilet
e) Water Kiosk
f) Fencing
BOREHOLE

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY (USD) (USD)

BOREHOLE DRILLING AND EQUIPPING (ASSUMED DEPTH


= 250metres)

Mobilization, Setting up, Demobilization and Shifting

A Hydro geological survey Sum 1 -

B Mobilization costs to drilling area, transport of drilling unit, test


pumping equipment, store, personnel, material and other
supplies including drilling permit, set up on site and make all
requisite preparations such as storage and handling of supplies
and equipment during the drilling and well development period Sum 1 -

C Demobilization of drilling and test pumping equipment from site


including for personnel, store and other materials Sum 1 -

Drilling, Installation, Development, and testing of


production borehole

D Installation of surface casing and drilling preparation m 3 -

E 15" dia. from ground level to 100 metres. Rate to include for
drilling mud and additives. (Drilled diameter shall be 12" if 8"
casing is to be installed) m 100 -

F Ditto but beyond 100 metres m 100 -

G Ditto but beyond 200 metres (Provisional. Dependent on


borehole depth) m 50 -

H Supply & Installation of 10" dia, steel plain casing with bottom
plug or equivalent PVC. m 130 -

H.1 Supply & Installation of 8" dia, steel plain casing with bottom
plug or equivalent PVC (Provisional) m 130 -

J Supply and installation of 10" well screen with centralizers or


equivalent PVC m 120 -

J.1 Supply and installation of 8" well screen with centralizers or


equivalent PVC. (Provisional) m 120 -

K Backfill well bore from top of gravel pack seal to surface of the
hole m 120 -

Sub-Total Page 1 to Collection -

Borehole - 2/223
BOREHOLE

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY (USD) (USD)

A Supply and installation of good quality gravel pack (siliceous


origin) from 2 metres below bottom of screen to 2 metres
minimum above top of screen m3 6 -

B Supply and install bentonite seal above gravel pack seal


surface of minimum depth 5 metres m3 0.5 -

C Test pumping including provision of pump and other associated


equipment requisite for carrying out the works satisfactorily Hrs 48 -

D Recovery test including for necessary equipment Hrs 12 -

E Grouting, well head and BH cap m 2 -

F Drilling application, Geological logging and reporting Sum 1 -

G Analysis of water Sum 1 -

H Restore site to original state including backfill of mud pits and


removal of all rubbish created by the works Sum 1 -

I Install Reinforced Concrete Apron (slab) around top of borehole m3 1 -

Borehole Equipping and commissioning

J Supply and installation of 1 submersible pump capable of


discharging (insert flow rate, m3/hr, on basis of borehole yield
and water demand) at a total pumping head of (insert the
computed total pumping head) Sum 1 -

K Supply and installation of (insert generator rating, KVA,


computed on basis of pump power requirement) Generator
(Perkins generator set or equivalent approved meeting the
following minimum specifications:- diesel driven, 3 phase, water
cooled, dual staring with alternator and complete with 10 spare
oil filters, 10 spare fuel filters and 2 spare air filters) Sum 1 -

Supply and installation of a Control Panel (specified to match


L
the pump power requirement) incorporating TP fused isolator,
Starter, Start-Push button, Stop/Reset button, On/Trip indicator
light and a selector switch. The panel should also incorporate
an appropriate control unit with functions of an ammeter, low
level cut out relay, phase control relay and Auto-off hand
selector switch all incorporated in a steel enclosure with
terminals Sum 1 -

Sub-Total Page 2 to Collection -

A 10mm2 4 Core submersible cable M 260 -

Borehole - 3/223
BOREHOLE

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY (USD) (USD)
B 0.75mm2 Londex Electrode Cable (provisional dependent on
type of control unit incorporated in the control panel) M 510 -

C Electrodes (pair) (provisional dependent on type of control unit


incorporated in the control panel) No 1 -

D 2" Pump Guard No 1 -

E 2" GI class 'B' pipes No 40 -

F 2" Heavy duty Crane sockets No 41 -

G 10mm2 3 core U/G cable m 30 -

H 10mm2 4 core U/G cable m 5 -

I Splicing Kit (Heat shrink joint) No 1 -

J 25mm PVC Airline No 41 -

K Installation sundries including Cable Insulating tapes, plastic


cable ties e.t.c Sum 1 -

L 2" x 6" Borehole Cover complete with all mechanical and


electrical sundries No 1 -

M TPN Fuse (specify Amps depending on the current the pump


draws) No 1 -

N 2" Sensus Water meter complete with installation sundries No 1 -

O Transport and Labour during installation Sum 1 -

Sub-Total Page 3 to Collection -

Borehole - 4/223
BOREHOLE

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY (USD) (USD)
250 METRES DEEP BOREHOLE COLLECTION

Total from page 1 -

Total from page 2 -

Total from Page 3 -

TOTAL COST OF DRILLING AND EQUIPPING 250 M DEEP BOREHOLE -

UNIT COST OF DRILLLING AND EQUIPPING 1 METRE OF BOREHOLE -

Borehole - 5/223
SINGLE GENERATOR ROOM

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

SUBSTRUCTURE (Provisional)

Excavation

Excavation including maintaining and supporting sides


and keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 200 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 35 -

Excavate to reduce levels not exceeding 1.50m deep


B average depth 300mm m3 10 -

Excavate for foundation strip commencing at reduced


C levels depth not exceeding 1.50m deep m3 20 -

D Extra-over for excavation in rock m3 6 -

E Remove surplus excavated material from site m3 8 -

F Backfill around foundation m3 15 -

Filing

300 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
G concrete surface bed m3 10 -

Insitu concrete: class 15: mix 1:3:6

50mm blinding layer on hardcore surfaces and under


H foundations m2 35 -

I Treat hardcore surface with approved insecticide m2 30 -

Concrete work

Reinforced Concrete class 25

J Strip foundation m3 3 -
150mm thick floor slab with surface steel trowelled
K smooth m2 23 -

Expansion Joint

Form 20mm wide expansion joint with flexcell joint filler


L and polysulphide joint sealant for the plinth m2 2.5 -

Total page 1 to Substructures Collection -

Single Generator Room - 6/223


SINGLE GENERATOR ROOM

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Concrete Work

A 150mm thick sloping ramp m2 6 -

B 300 mm thick generator plinth m3 1 -

Reinforcement

C 10mm and 8mm diameter high tensile reinforcement bars kg 70 -

Mesh fabric reinforcement ref. No. A142 laid in floor slab


D with minimum 150 mm side allowance m2 23 -

Mesh fabric reinforcement ref. No. A393 laid in generator


E plinth with minimum 150 mm side allowance m2 6 -

Sawn formwork

Formwork to sides of generator plinth girth over 75mm


F but not exceeding 150mm m 7 -

Formwork to edges of floor slab girth over 75mm but not


G exceeding 150mm m 24 -

Walling

400mm Thick rubble stone foundation walling in cement


H and sand mortar (1:3) m2 21 -

One layer 1000gauge polythene sheet damp proof


I membrane under beds: 300mm laps m2 25 -

J 200mm wide Bituminous felt damp-proof course m 22 -

Plinths

K 15mm thick cement sand rendering (1:3) to plinths m2 6 -

Prepare and apply three coats black bituminous paint to


L rendered plinths externally m2 6 -

Total page 2 to Substructures Collection -

SUBSTRUCTURES COLLECTION

Total from page 1 -

Total from page 2 -

SUBSTRUCTURES SUB TOTAL TO SUMMARY -

Single Generator Room - 7/223


SINGLE GENERATOR ROOM

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
SUPERSTRUCTURES

Walling

A 200 Thick load bearing solid concrete block walling m2 49 -

Wall Coping

Precast concrete 600 x 300 x 50 mm Thick twice


weathered and throated coping jointed and pointed in
B cement and sand mortar m 21 -

Concrete Work

Vibrated reinforced concrete class 25 (1:1.5:3) with


20mm maximum aggregate as described in:

C Ring Beam m3 1 -

D Reinforcement

E 8mm Diameter high tensile reinforcement bar kg 55 -

F Ditto but 10mm kg 20 -

Sawn Formwork

G Formwork to sides and soffits of ring beam m2 12 -

Roofing

Roof Structure

Sawn celcured cypress timber as described in:

H 200mm x 25mm Fascia Board m 23 -

I l00x50mmRafters m 20 -

J 100mm x 50mm wall plate m 23 -

K 50 x 50 Purlins m 34 -

Roof Covering

28 Gauge galvanized corrugated iron sheets fixed to


L timber Purlins m2 32 -

26 Gauge flushing 450mm wide bent to shape tucked


M under roofing sheets and parapet wall m 23 -

Single Generator Room - 8/223


SINGLE GENERATOR ROOM

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Total page 3 to Superstructures Collection -

Painting and Decorating

Knot prime stop and apply two undercoats and one gloss
A finishing coat oil paint to fascia board 200- 300 mm wide m 23 -

Doors and Windows

Purpose-made steel casement double door,


manufactured from standard sections, finished with
pressed steel horizontal louvers and complete with all the
B necessary ironmongery overall size 2000 x 2100mm high No 1 -
Purpose-made steel casement double door,
manufactured from standard sections, finished with
pressed steel horizontal louvers and complete with all the
necessary ironmongery overall size 900 x 2100mm high
C (Provisional) No 1 -

Metal grill window with wire mesh overall size


D 2000x1000mm high No 3 -

Metal grill window with wire mesh overall size


E 900x1000mm high (Provisional) No 1 -

Precast concrete window cill size 260 x 50mm Thick


sunk - weathered and throated and bedded and jointed in
F cement sand mortar m 7 -

Prepare and apply two undercoats and one finishing coat


G oil paint to steel door m2 13 -

H Ditto windows m2 14 -

Finishes

Floor Finishes

Cement and sand mortar (1:3) in:

I 30mm thick steel trowelled screed m2 20 -

100 x 25mm Thick skirting to junction with floor and wall


J finish m 24 -

Total page 4 to Superstructures Collection -

Wall Finishes

Single Generator Room - 9/223


SINGLE GENERATOR ROOM

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

12mm lime plaster: steel trowelled finish: on concrete,


block work or stonework: to

A Walls and beams m2 63 -

Prepare and apply three coats plastic emulsion paint to:

B Plastered surfaces m2 63 -

Total page 5 to Superstructures Collection -

SUPERSTRUCTURE COLLECTION

Total from page 3 -

Total from page 4 -

Total from above -

SUPERSTRUCTURE SUB TOTAL TO SUMMARY -

GENERATOR ROOM

SUMMARY

(1) SUBSTRUCTURE -

(2) SUPERSTUCTURE -

TOTAL COST OF GENERATOR ROOM -

Single Generator Room - 10/223


CARETAKERS ROOM

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)

SUBSTRUCTURE (Provisional)

Excavation

Excavation including maintaining and supporting sides


and keeping free from water, mud and fallen materials
by bailing, pumping or otherwise

Prepare site by stripping top 200 mm of soil to remove


all debris including sand (if any) from site and carting
A away spoil m2 34

Excavate to reduce levels not exceeding 1.50m deep


B average depth 300mm m2 34

Excavate for foundation strip commencing at reduced


C levels depth not exceeding 1.50m deep m3 28

D Extra-over for excavation in rock m3 3

E Remove surplus excavated material from site m3 12

F Backfill around foundation m3 26

Filing

300 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
G concrete surface bed m3 5

Insitu concrete: class 15: mix 1:3:6

H 50mm blinding layer under foundations m2 10

I 50mm blinding layer on hardcore surfaces m2 15

J Treat hardcore surface with approved insecticide m2 15

Concrete work

Reinforced Concrete class 25

K Strip foundation m3 2

100mm thick floor slab with surface steel trowelled


L smooth m2 19

Caretakers Room - 11/223


CARETAKERS ROOM

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
Total page 1 to Substructures Collection

Reinforcement

A 10 and 8mm diameter high tensile reinforcement bars kg 55

Mesh fabric reinforcement ref. No. A142 laid in floor


B slab with minimum 150 mm side allowance m2 19

Sawn formwork

Formwork to edges of floor slab girth over 75mm but


C not exceeding 150mm m 17

Walling

300mm Thick rubble stone foundation walling in cement


D and sand mortar (1:3) m2 21

One layer 1000gauge polythene sheet damp proof


E membrane under beds: 300mm laps m2 19

F 200mm wide Bituminous felt damp-proof course m 17

Plinths

G 15mm thick cement sand rendering (1:3) to plinths m2 5

Prepare and apply three coats black bituminous paint


H to rendered plinths externally m2 5

Total page 2 to Substructures Collection

SUBSTRUCTURES COLLECTION

Total from page 1

Total from page 2

SUBSTRUCTURES SUB TOTAL TO SUMMARY

Caretakers Room - 12/223


CARETAKERS ROOM

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)

SUPERSTRUCTURES

Walling

A 200 Thick load bearing solid concrete block walling m2 38

Wall Coping

Precast concrete 600 x 300 x 50 mm Thick twice


weathered and throated coping jointed and pointed in
B cement and sand mortar m 13

Concrete Work

Vibrated reinforced concrete class 25 (1:1.5:3) with


20mm maximum aggregate as described in:

A Ring Beam m3 1

B Columns m3 1

C 100mm Thick suspended seat /bench m2 4

Reinforcement

D 8mm Diameter high tensile reinforcement bar kg 30

E Ditto but 10mm kg 55

F Ditto but 12mm Kg 25

Mesh fabric reinforcement ref. No. A142 laid in floor


G slab with minimum 150 mm side allowance m2 2

Sawn Formwork to:

H Sides and soffits of ring beam m2 12

I Vertical sides of columns m2 5

J Sides and soffits of concrete seat m2 5

Caretakers Room - 13/223


CARETAKERS ROOM

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)

Total page 3 to Superstructures Collection

Roofing

Roof Structure

Sawn celcured cypress timber as described in:

A 200mm x 25mm Fascia Board m 4

B l00x50mmRafters m 14

C 100mm x 50mm wall plate m 8

D 50 x 50 Purlins m 21

Roof Covering

30 Gauge galvanized corrugated iron sheets fixed to


E timber Purlins m2 19

26 Gauge flushing 450mm wide bent to shape tucked


F under roofing sheets and parapet wall m 13

Painting and Decorating


Knot prime stop and apply two undercoats and one
gloss finishing coat oil paint to fascia board 200- 300
G mm wide m 4

Caretakers Room - 14/223


CARETAKERS ROOM

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
Total page 4 to Superstructures Collection

Doors and Windows

45mm thick Match boarded timber single door, overall


A size 900x 2100mm high No 1

Wrot cypress 1st grade

150x50mm frame two labours plugged screwed and


B pellated m 5

C 50x25mm architrave two labours m 5

D 25x15mm quadrant one labour m 5

Supply and fix the following ironmongery to timber with


matching screws

E Stainless steel hinges Pairs 2

F Three lever mortice lock No 1

G Two lever mortice lock (Optional) No 1

H Rubber door stop (Optional) No 1

Caretakers Room - 15/223


CARETAKERS ROOM

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
Total page 5 to Superstructures Collection

WINDOWS

Supply and Fix the following purpose made steel


Lourved windows manufactured from heavy duty
standard sections primed with one coat of red oxide
primer and fixing to masonry or concrete head and
jambs complete with closing mechanism and other
fittings.

A Window overall size 1000x900mm high No 2

5mm thick clear sheet glass bedded in mastic

B In panes of various sizes m2 3

Purpose made mild steel burglar proofing to windows;


10mm square section steel bars smooth welded
together at 75mm centres both ways fixed with lugs
built into walls; one coat shop primer

C Grille overall size 1000x900mm high No 3

Precast concrete window cill size 260 x 50mm Thick


sunk - weathered and throated and bedded and jointed
D in cement sand mortar m 3

Prepare and apply two undercoats and one finishing


E coat oil paint to timber door m2 4

F Ditto windows m2 5

Caretakers Room - 16/223


CARETAKERS ROOM

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
Total page 6 to Superstructures Collection

Finishes

Floor Finishes

Cement and sand mortar (1:3) in:

A 30mm thick steel trowelled screed m2 15

100 x 25mm Thick skirting to junction with floor and wall


B finish m 13

Wall Finishes

Cement and sand mortar (1:3) rendering in:

12 mm Thick mortar rendering with steel float finish to


C masonry and concrete surfaces m2 38

12mm lime plaster: steel trowelled finish: on concrete,


block work or stonework: to

D Walls and beams m2 33

Prepare and apply three coats plastic emulsion paint to:

E Rendered surfaces m2 38

F Plastered surfaces m2 33

Total page 7 to Superstructure Collection

SUPERSTRUCTURE COLLECTION

Total from page 3

Total from page 4

Total from page 5

Total from page 6

Total from above

Caretakers Room - 17/223


CARETAKERS ROOM

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
SUPERSTRUCTURE SUB TOTAL TO SUMMARY

CARETAKERS ROOM

SUMMARY

(1) SUBSTRUCTURE

(2) SUPERSTUCTURE

Caretakers Room - 18/223


CARETAKERS ROOM

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)

TOTAL COST OF CARETAKERS ROOM

Caretakers Room - 19/223


AMOUNT
(USD)

Caretakers Room - 20/223


AMOUNT
(USD)
-

Caretakers Room - 21/223


AMOUNT
(USD)

Caretakers Room - 22/223


AMOUNT
(USD)

Caretakers Room - 23/223


AMOUNT
(USD)
-

Caretakers Room - 24/223


AMOUNT
(USD)
-

Caretakers Room - 25/223


AMOUNT
(USD)
-

Caretakers Room - 26/223


AMOUNT
(USD)
-

Caretakers Room - 27/223


AMOUNT
(USD)

Caretakers Room - 28/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)

20M3 CIRCULAR ELEVATED STORAGE WATER TANK

Excavation
Excavation including maintaining and supporting sides
and keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 27

Excavate trench commencing at reduced levels depth not


B exceeding 1.50m deep m3 18

Foundation excavation commencing at reduced levels


C depth not exceeding 1.50m deep m3 7

D Extra-over for excavation in rock m3 3

E Remove surplus excavated material from site m3 18

F Backfill around foundation m3 6

Filing

300 mm thick approved hardcore filling spread, well


G rammed and compacted in 150mm layers m3 7

Concrete work

Mass Concrete class 15 (1:3:6) with 20mm thick


maximum aggregate size in

H 50mm Thick blinding m3 1.5

Vibrated Reinforced Concrete class 25 (1:1.5:3) with


20mm thick maximum aggregate size in

I Ground beam m3 3.6

J Column base m3 2.0

Sub-Total to Collection

Elevated Water Storage Tanks - 29/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
Vibrated Reinforced Concrete class 25 (1:1.5:3) with
20mm thick maximum aggregate size in

A Tie beam m3 4

B Columns m3 1

Vibrated Reinforced Concrete class 30 (1:1:2) with 20mm


thick maximum aggregate size in

C 150mm thick Walls m2 25

D 150mm thick Base slab m2 11

E 150mm thick Cover slab m2 11

Reinforcement

F Reinforcement bars (all sizes) as shown on drawings kg 1,290

Sawn formwork

Formwork to sides of column bases girth over 225mm but


G not exceeding 300mm m 19

Formwork to sides of base slab girth over 75mm but not


H exceeding 150mm m 12

Formwork to sides of cover slab girth over 75mm but not


I exceeding 150mm m 12

J Formwork to sides and soffites of beams m2 56

K Formwork to sofittes of base slab m2 11

L Formwork to sofittes of cover slab m2 11

M Formwork to sides of columns m2 19

N Formwork to sides of walls m2 50

O 200mm wide PVC water bar m 22

Sub-Total to Collection

Elevated Water Storage Tanks - 30/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
Finishes

Cement and sand mortar (1:3) rendering in:

A 25 mm Thick screed to base slab with waterproof cement m2 9


15mm internal plaster to cover slab with waterproof
B cement m2 9

15mm plaster to internal sides of wall with waterproof


C cement m2 24

D 12mm plaster to external sides of wall m2 26

E 12mm plaster to cover slab m2 11

F 12mm plaster to soffits of base slab m2 9

G 12mm plaster to beams m2 56

H 12mm plaster to columns m2 19

I 25x25mm Bondex sealing compound m 11

Water Supply System

Galvanized Mild Steel pipes class "B" medium thickness


with and including jointing, fittings and fixe as described

J 50mm diameter inlet pipe 800mm long No 1

K 50mm diameter draw off pipe Ditto No 1

L 50mm diameter overflow pipe Ditto No 1

M 75mm diameter scour pipe Ditto No 1

N 20mm diameter brass gate valve with wheel and head No 1

O 20mm diameter stop corks No 1

600x600x6mm heavy gauge steel primed metal manhole


P cover on slab with and including metal framing all around No 1

20mm Diameter bars, ‘U’ shaped to form steps with ends


Q embedded into retaining wall, average length 450mm No 8
Sub-Total to Collection

COLLECTION

Sub-Total from page 1

Elevated Water Storage Tanks - 31/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)

Sub-Total from page 2

Sub-Total from page 3

TOTAL COST OF 20M3 STORAGE TANK

25M3 CIRCULAR ELEVATED STORAGE WATER TANK

Elevated Water Storage Tanks - 32/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
Excavation
Excavation including maintaining and supporting sides
and keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 31

Excavate trench commencing at reduced levels depth not


B exceeding 1.50m deep m3 11

Pit excavation commencing at reduced levels depth not


C exceeding 1.50m deep m3 28

D Extra-over for excavation in rock m3 1

E Remove surplus excavated material from site m3 4

F Backfill around foundation m3 35

Filing

300 mm thick approved hardcore filling spread, well


G rammed and compacted in 150mm layers m3 8

Concrete work

Mass Concrete class 15 (1:3:6) with 20mm thick


maximum aggregate size in

H 50mm Thick blinding m3 2

Vibrated Reinforced Concrete class 25 (1:1.5:3) with


20mm thick maximum aggregate size in

I Ground beam m3 2

J Column base m3 2

Sub-Total to Collection

Vibrated Reinforced Concrete class 25 (1:1.5:3) with


20mm thick maximum aggregate size in

Elevated Water Storage Tanks - 33/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)

A Tie beam m3 7

B Columns m3 1

Vibrated Reinforced Concrete class 30 (1:1:2) with 20mm


thick maximum aggregate size in

C 150mm thick Walls m2 28

D 150mm thick Base slab m2 13

E 150mm thick Cover slab m2 13

Reinforcement

F Reinforcement bars (all sizes) as shown on drawings kg 1,465

Sawn formwork

Formwork to sides of column bases girth over 225mm but


G not exceeding 300mm m 19

Formwork to sides of base slab girth over 75mm but not


H exceeding 150mm m 13

Formwork to sides of cover slab girth over 75mm but not


I exceeding 150mm m 13

J Formwork to sides and sofittes of beams m2 67

K Formwork to sofittes of base slab m2 11

L Formwork to sofittes of cover slab m2 11

M Formwork to sides of columns m2 19

N Formwork to sides of walls m2 62

O 200mm wide PVC water bar m 25

Sub-Total to Collection

Finishes

Elevated Water Storage Tanks - 34/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)

Cement and sand mortar (1:3) rendering in:

A 25 mm Thick screed to base slab with waterproof cement m2 11


15mm internal plaster to cover slab with waterproof
B cement 11

15mm plaster to internal sides of wall with waterproof


C cement m2 30

D 12mm plaster to external sides of wall m2 32

E 12mm plaster to cover slab m2 13

F 12mm plaster to soffits of base slab m2 13

G 12mm plaster to beams m2 87

H 12mm plaster to columns m2 19

I 25x25mm Bondex sealing compound m 12

Water Supply System

Galvanized Mild Steel pipes class "B" medium thickness


with and including jointing, fittings and fixe as described

J 50mm diameter inlet pipe 800mm long No 1

K 50mm diameter draw off pipe Ditto No 1

L 50mm diameter overflow pipe Ditto No 1

M 75mm diameter scour pipe Ditto No 1

N 20mm diameter brass gate valve with wheel and head No 1

O 20mm diameter stop corks No 1

600x600x6mm heavy gauge steel primed metal manhole


P cover on slab with and including metal framing all around No 1

20mm Diameter bars, ‘U’ shaped to form steps with ends


Q embedded into retaining wall, average length 450mm No 8
Sub-Total to Collection

COLLECTION

Sub-Total from page 5

Elevated Water Storage Tanks - 35/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
Sub-Total from page 6

Sub-Total from page 7

TOTAL COST OF 25M3 GROUND STORAGE TANK

50M3 CIRCULAR ELEVATED STORAGE WATER TANK

Excavation

Elevated Water Storage Tanks - 36/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
Excavation including maintaining and supporting sides
and keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 52

Excavate trench commencing at reduced levels depth not


B exceeding 1.50m deep m3 14

Pit excavation commencing at reduced levels depth not


C exceeding 1.50m deep m3 29

D Extra-over for excavation in rock m3 5

E Remove surplus excavated material from site m3 14

F Backfill around foundation m3 29

Filing

300 mm thick approved hardcore filling spread, well


G rammed and compacted in 150mm layers m3 16

Concrete work

Mass Concrete class 15 (1:3:6) with 20mm thick


maximum aggregate size in

H 50mm Thick blinding m3 3

Vibrated Reinforced Concrete class 25 (1:1.5:3) with


20mm thick maximum aggregate size in

I Ground beam m3 3

J Column base m3 3

Sub-Total to Collection

Vibrated Reinforced Concrete class 25 (1:1.5:3) with


20mm thick maximum aggregate size in

Elevated Water Storage Tanks - 37/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
A Tie beam m3 6

B Columns m3 2

Vibrated Reinforced Concrete class 30 (1:1:2) with 20mm


thick maximum aggregate size in

C 200mm thick Walls m2 48

D 200mm thick Base slab m2 22

E 200mm thick Cover slab m2 22

Reinforcement

F Reinforcement bars (all sizes) as shown on drawings kg 2,675

Sawn formwork

G Formwork to sides of column bases m2 8

Formwork to sides of base slab girth over 150mm but not


H exceeding 225mm m 17

Formwork to sides of cover slab girth over 150mm but not


I exceeding 225mm m 17

J Formwork to sides and sofittes of beams m2 86

K Formwork to sofittes of base slab m2 19

L Formwork to sofittes of cover slab m2 19

M Formwork to sides of columns m2 23

N Formwork to sides of walls m2 95

O 200mm wide PVC water bar m 32

Sub-Total to Collection

Finishes

Elevated Water Storage Tanks - 38/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
Cement and sand mortar (1:3) rendering in:

A 25 mm Thick screed to base slab with waterproof cement m2 19


15mm internal plaster to cover slab with waterproof
B cement m2 19

15mm plaster to internal sides of wall with waterproof


C cement m2 46

D 12mm plaster to external sides of wall m2 49

E 12mm plaster to cover slab m2 22

F 12mm plaster to soffits of base slab m2 19

G 12mm plaster to beams m2 75

H 12mm plaster to columns m2 23

I 25x25mm Bondex sealing compound m 16

Water Supply System

Galvanized Mild Steel pipes class "B" medium thickness


with and including jointing, fittings and fixe as described

J 50mm diameter inlet pipe 800mm long No 1

K 50mm diameter draw off pipe Ditto No 1

L 50mm diameter overflow pipe Ditto No 1

M 75mm diameter scour pipe Ditto No 1

N 20mm diameter brass gate valve with wheel and head No 1

O 20mm diameter stop corks No 1

600x600x6mm heavy gauge steel primed metal manhole


P cover on slab with and including metal framing all around No 1

20mm Diameter bars, ‘U’ shaped to form steps with ends


Q embedded into retaining wall, average length 450mm No 10
Sub-Total to Collection

COLLECTION

Sub-Total from page 9

Sub-Total from page 10

Elevated Water Storage Tanks - 39/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)

Sub-Total from page 11

TOTAL COST OF 50M3 GROUND STORAGE TANK

60M3 CIRCULAR ELEVATED STORAGE WATER TANK

Excavation

Elevated Water Storage Tanks - 40/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
Excavation including maintaining and supporting sides
and keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 63

Excavate trench commencing at reduced levels depth not


B exceeding 1.50m deep m3 19

Pit excavation commencing at reduced levels depth not


C exceeding 1.50m deep m3 41

D Extra-over for excavation in rock m3 10

E Remove surplus excavated material from site m3 18

F Backfill around foundation m3 42

Filing

300 mm thick approved hardcore filling spread, well


G rammed and compacted in 150mm layers m3 17

Concrete work

Mass Concrete class 15 (1:3:6) with 20mm thick


maximum aggregate size in

H 50mm Thick blinding m3 3

Vibrated Reinforced Concrete class 25 (1:1.5:3) with


20mm thick maximum aggregate size in

I Ground beam m3 3

J Column base m3 6

Sub-Total to Collection

Vibrated Reinforced Concrete class 25 (1:1.5:3) with


20mm thick maximum aggregate size in

Elevated Water Storage Tanks - 41/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
A Tie beam m3 6

B Columns m3 1

Vibrated Reinforced Concrete class 30 (1:1:2) with 20mm


thick maximum aggregate size in

C 250mm thick Walls m2 56

D 250mm thick Base slab m2 23

E 200mm thick Cover slab m2 23

Reinforcement

F Reinforcement bars (all sizes) as shown on drawings kg 3,890

Sawn formwork

G Formwork to sides of column bases m2 40

Formwork to sides of base slab girth over 150mm but not


H exceeding 225mm m 17

Formwork to sides of cover slab girth over 150mm but not


I exceeding 225mm m 17

J Formwork to sides and sofittes of beams m2 80

K Formwork to sofittes of base slab m2 23

L Formwork to sofittes of cover slab m2 23

M Formwork to sides of columns m2 27

N Formwork to sides of walls m2 112

O 200mm wide PVC water bar m 32

Sub-Total to Collection

Finishes

Elevated Water Storage Tanks - 42/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
Cement and sand mortar (1:3) rendering in:

A 25 mm Thick screed to base slab with waterproof cement m2 19


15mm internal plaster to cover slab with waterproof
B cement m2 19

15mm plaster to internal sides of wall with waterproof


C cement m2 54

D 12mm plaster to external sides of wall m2 58

E 12mm plaster to cover slab m2 23

F 12mm plaster to soffits of base slab m2 23

G 12mm plaster to beams m2 80

H 12mm plaster to columns m2 27

I 25x25mm Bondex sealing compound m 16

Water Supply System

Galvanized Mild Steel pipes class "B" medium thickness


with and including jointing, fittings and fixe as described

J 50mm diameter inlet pipe 800mm long No 1

K 50mm diameter draw off pipe Ditto No 1

L 50mm diameter overflow pipe Ditto No 1

M 75mm diameter scour pipe Ditto No 1

N 20mm diameter brass gate valve with wheel and head No 1

O 20mm diameter stop corks No 1

600x600x6mm heavy gauge steel primed metal manhole


P cover on slab with and including metal framing all around No 1

20mm Diameter bars, ‘U’ shaped to form steps with ends


Q embedded into retaining wall, average length 450mm No 11
Sub-Total to Collection

COLLECTION

Sub-Total from page 13

Sub-Total from page 14

Elevated Water Storage Tanks - 43/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)

Sub-Total from page 15

TOTAL COST OF 60M3 GROUND STORAGE TANK

75M3 CIRCULAR ELEVATED STORAGE WATER TANK

Excavation

Elevated Water Storage Tanks - 44/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
Excavation including maintaining and supporting sides
and keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 72

Excavate trench commencing at reduced levels depth not


B exceeding 1.50m deep m3 18

Pit excavation commencing at reduced levels depth not


C exceeding 1.50m deep m3 48

D Extra-over for excavation in rock m3 10

E Remove surplus excavated material from site m3 18

F Backfill around foundation m3 48

Filing

300 mm thick approved hardcore filling spread, well


G rammed and compacted in 150mm layers m3 22

Concrete work

Mass Concrete class 15 (1:3:6) with 20mm thick


maximum aggregate size in

H 50mm Thick blinding m3 4

Vibrated Reinforced Concrete class 25 (1:1.5:3) with


20mm thick maximum aggregate size in

I Ground beam m3 4

J Column base m3 6

Sub-Total to Collection

Vibrated Reinforced Concrete class 25 (1:1.5:3) with


20mm thick maximum aggregate size in

Elevated Water Storage Tanks - 45/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
A Tie beam m3 7

B Columns m3 1

Vibrated Reinforced Concrete class 30 (1:1:2) with 20mm


thick maximum aggregate size in

C 250mm thick Walls m2 63

D 250mm thick Base slab m2 28

E 250mm thick Cover slab m2 28

Reinforcement

F Reinforcement bars (all sizes) as shown on drawings kg 4,535

Sawn formwork

G Formwork to sides of column bases m2 11

Formwork to sides of base slab girth over 225mm but not


H exceeding 300mm m 19

Formwork to sides of cover slab girth over 225mm but not


I exceeding 300mm m 19

J Formwork to sides and sofittes of beams m2 87

K Formwork to sofittes of base slab m2 28

L Formwork to sofittes of cover slab m2 28

M Formwork to sides of columns m2 27

N Formwork to sides of walls m2 125

O 200mm wide PVC water bar m 36

Sub-Total to Collection

Finishes

Elevated Water Storage Tanks - 46/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
Cement and sand mortar (1:3) rendering in:

A 25 mm Thick screed to base slab with waterproof cement m2 28


15mm internal plaster to cover slab with waterproof
B cement m2 28

15mm plaster to internal sides of wall with waterproof


C cement m2 60

D 12mm plaster to external sides of wall m2 65

E 12mm plaster to cover slab m2 28

F 12mm plaster to soffits of base slab m2 28

G 12mm plaster to beams m2 87

H 12mm plaster to columns m2 27

I 25x25mm Bondex sealing compound m 18

Water Supply System

Galvanized Mild Steel pipes class "B" medium thickness


with and including jointing, fittings and fixe as described

J 50mm diameter inlet pipe 800mm long No 1

K 50mm diameter draw off pipe Ditto No 1

L 50mm diameter overflow pipe Ditto No 1

M 75mm diameter scour pipe Ditto No 1

N 20mm diameter brass gate valve with wheel and head No 1

O 20mm diameter stop corks No 1

600x600x6mm heavy gauge steel primed metal manhole


P cover on slab with and including metal framing all around No 1

20mm Diameter bars, ‘U’ shaped to form steps with ends


Q embedded into retaining wall, average length 450mm No 11
Sub-Total to Collection

COLLECTION

Sub-Total from page 17

Sub-Total from page 18

Elevated Water Storage Tanks - 47/223


ELEVATED WATER STORAGE TANKS (20, 25, 50, 60 AND 75M3)

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)

Sub-Total from page 19

TOTAL COST OF 75M3 GROUND STORAGE TANK

Elevated Water Storage Tanks - 48/223


AMOUNT
(USD)

Elevated Water Storage Tanks - 49/223


AMOUNT
(USD)

Elevated Water Storage Tanks - 50/223


AMOUNT
(USD)

-
-
-
-

-
-

Elevated Water Storage Tanks - 51/223


AMOUNT
(USD)

Elevated Water Storage Tanks - 52/223


AMOUNT
(USD)

Elevated Water Storage Tanks - 53/223


AMOUNT
(USD)

Elevated Water Storage Tanks - 54/223


AMOUNT
(USD)

-
-

Elevated Water Storage Tanks - 55/223


AMOUNT
(USD)
-

Elevated Water Storage Tanks - 56/223


AMOUNT
(USD)

Elevated Water Storage Tanks - 57/223


AMOUNT
(USD)
-

Elevated Water Storage Tanks - 58/223


AMOUNT
(USD)

-
-

Elevated Water Storage Tanks - 59/223


AMOUNT
(USD)

Elevated Water Storage Tanks - 60/223


AMOUNT
(USD)

Elevated Water Storage Tanks - 61/223


AMOUNT
(USD)
-

Elevated Water Storage Tanks - 62/223


AMOUNT
(USD)

-
-

Elevated Water Storage Tanks - 63/223


AMOUNT
(USD)

Elevated Water Storage Tanks - 64/223


AMOUNT
(USD)

Elevated Water Storage Tanks - 65/223


AMOUNT
(USD)
-

Elevated Water Storage Tanks - 66/223


AMOUNT
(USD)

-
-

Elevated Water Storage Tanks - 67/223


AMOUNT
(USD)

Elevated Water Storage Tanks - 68/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

SINGLE PIT LATRINE

SUBSTRUCTURE (Provisional)

Excavation

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise
Prepare site by stripping top 200 mm of soil to remove all
debris including sand (if any) from site and carting away
A spoil m2 14.7 -

Excavate for foundation strip commencing at stripped levels


B depth not exceeding 1.50m deep m3 17.5 -

Pit excavation commencing at stripped levels depth not


C exceeding 1.50m deep m3 3.4 -

D Ditto 1.50 - 3.00 metres deep m3 3.4 -

E Ditto 3.00 - 4.50 metres deep (Optional) m3 3.4 -

F Ditto 4.50 - 6.00 metres deep (Optional) m3 3.4 -

G Extra-over for excavation in rock m3 4.0 -

H Remove surplus excavated material from site m3 15.0 -

I Backfill around foundation m3 1.5 -

Filing

300 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
J concrete surface bed m3 1.2 -

Insitu concrete: class 15: mix 1:3:6

K 50mm blinding layer under foundations m2 7.4 -

L 50mm blinding layer on hardcore surfaces m2 4.2 -

M Treat hardcore surface with approved insecticide m2 4.2 -

Pit latrines - 69/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Total page 1 to Substructures Collection -

Concrete work

Reinforced Concrete class 15

A Strip foundation m3 0.8 -

Reinforced Concrete class 25

B 100mm thick floor slab with surface steel trowelled smooth m2 10.8 -

C Allow for pit/squat hole in 100mm thick floor slab No 1.0 -

Reinforcement

D Reinforcement bars (All sizes) as shown on drawings kg 85.0 -

Mesh fabric reinforcement ref. No. A142 laid in floor slab


E with minimum 150 mm side allowance m2 10.8 -

Sawn formwork

Formwork to edges of floor slab girth over 75mm but not


F exceeding 150mm m 15.0 -

Formwork to edges of strip footing girth over 75mm but not


G exceeding 150mm m 15.0 -

Formwork to edges of strip footing girth over 150mm but not


H exceeding 2250mm m 12.0 -

Walling

400mm Thick rubble stone retaining wall in cement and


I sand mortar (1:3) m2 12.3 -

300mm Thick rubble stone foundation walling in cement


J and sand mortar (1:3) m2 11.0 -

K 150mm thick masonry wall m2 1.0 -

One layer 1000gauge polythene sheet damp proof


L membrane under beds: 300mm laps m2 15.7 -

M 200mm wide Bituminous felt damp-proof course m 14.4 -

Pit latrines - 70/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Total page 2 to Substructures Collection -

Steps

Concrete work

Reinforced Concrete class 25

A Treads, 300 mm wide m 5.0 -

B Risers, 150 mm high m 4.0 -

C Open string m2 0.3 -

D Waist m2 0.2 -

Sawn formwork

E Risers: girth over 75mm but not exceeding 150mm m 4.0 -

F Open string m2 0.3 -

G Waist m2 0.2 -
Cement and sand mortar (1:4) trowelled beds: on concrete:
to

H Treads, 300 mm wide m 5.0 -

I Risers, 150 mm high m 4.0 -

J Open string m2 0.3 -

K Waist m2 0.2 -

Non slip approved ceramic floor tiles size 300x300x8mm


thick as approved by the Engineer: bedded on cement and
sand screeds(measured separately) : jointed and grouted in
matching colour cement mortar

L Treads, 300 mm wide (Optional) m 5.0 -

M Risers, 150 mm high (Optional) m 4.0 -

N Open string (Optional) m2 0.3 -

O Waist (Optional) m2 0.2 -

Reinforcement

P High tensile reinforcement bars in assorted sizes kg 20.0 -

Pit latrines - 71/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Total page 3 to Substructures Collection -

Plinths

A 15mm thick cement sand rendering (1:3) to plinths m2 4.0 -

Prepare and apply three coats black bituminous paint to


B rendered plinths externally m2 4.0 -

100mm thick Concrete Ring lining of pit insides up to


bottom of pit if in loose formation areas or in areas with
C ground water (Optional) m2 30.0 -

Total page 4 to Substructures Collection -

SUBSTRUCTURES COLLECTION

Total from page 1 -

Total from page 2 -

Total from page 3 -

Total from above -

Pit latrines - 72/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

SUBSTRUCTURES SUB TOTAL TO SUMMARY -

SUPERSTRUCTURES

Walling

A 150 Thick load bearing solid concrete block walling m2 30.5 -

200mm deep x 400mm wide vent block No 1.0 -

Wall Coping

Precast concrete 600 x 300 x 50 mm Thick twice weathered


and throated coping jointed and pointed in cement and
B sand mortar m 6.0 -

Concrete Work

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

C Lintels m3 0.1 -

Reinforcement

D 8mm Diameter high tensile reinforcement bar kg 2.0 -

E Ditto but 10mm kg 4.0 -

Sawn Formwork to:

F Sides and soffits of lintels m2 1.0 -

Roofing

Roof Structure

Sawn celcured cypress timber as described in:

G 200mm x 15mm Fascia Board m 10.7 -

H l00x50mmRafters m 5.0 -

I 100mm x 50mm wall plate m 8.0 -

J 50 x 50 Purlins m 8.0 -

Roof Covering

Pit latrines - 73/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

30 Gauge galvanized corrugated iron sheets fixed to timber


K Purlins m2 7.1 -

Total page 5 to Superstructures Collection -

Painting and Decorating

Knot prime stop and apply two undercoats and one gloss
A finishing coat oil paint to fascia board 200- 300 mm wide m 10.7 -

Doors

45mm thick Match boarded timber single door, overall size


B 900x 2100mm high No 1.0 -
-
Wrot cypress 1st grade -
150x50mm frame two labours plugged screwed and -
C pellated m 5.0 -

D 50x25mm architrave two labours m 5.0 -

E 25x15mm quadrant one labour m 5.0 -

Supply and fix the following ironmongery to timber with


matching screws

F Stainless steel hinges Pairs 2.0 -

G Three lever mortice lock No 1.0 -

H Rubber door stop No 1.0 -

Prepare and apply two undercoats and one finishing coat oil
I paint to timber door m2 3.8 -

Pit latrines - 74/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Total page 6 to Superstructures Collection -

Finishes

Floor Finishes
Cement and sand mortar (1:4)trowelled beds: on concrete:
to

A 32mm floors finished to receive ceramic tile flooring m2 7.8 -

Non slip approved ceramic floor tiles size 300x300x8mm


thick as approved by the Engineer: bedded on cement and
sand screeds(measured separately) : jointed and grouted in
matching colour cement mortar

B Floors (Optional) m2 7.8 -


100 x 25mm Thick skirting to junction with floor and wall
C finish m 12.2 -

Wall Finishes

15mm cement and sand (1:4) backing; wood float finish: to


receive wall tiles: to

D Walls internally (Optional) m2 28.3 -

Supply and fix approved Ceramic wall tiles or other equal


and approved fixed with approved quality adhesive in
accordance with manufacturers instructions bedded on
cement sand backing (measured separately): jointed,
pointed and grouted in matching colour cement mortar: to

E 250x300x8mm thick wall tiles (Optional) m2 28.3 -

12mm lime plaster: steel trowelled finish: on concrete, block


work or stonework: to

F Walls externally m2 28.5 -

Prepare and apply three coats plastic emulsion paint to:

G Walls externally m2 28.5 -

H Extra over keying m2 28.5 -

Pit latrines - 75/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Supply and fix hand washing concrete basin size 300mm x
I 450mm No 1.0 -

Total page 7 to Superstructures Collection -

A Pit/squat hole cover No 1.0 -

B 100mm diameter PVC vent pipe with fly screen top m 3.0 -

Elevated storage tank (all Optional)

Excavation

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Pit excavation commencing at ground level depth not


C exceeding 1.50m deep m3 3.0 -

D Extra-over for excavation in rock m3 0.3 -

E Remove surplus excavated material from site m3 1.0 -

F Backfill around foundation m3 2.0 -

Insitu concrete: class 15: mix 1:3:6

G 50mm blinding layer under foundations m2 1.0 -

Concrete work

Reinforced Concrete class 25

H Pad footing m3 0.3 -

I Column m3 0.4 -

J Beam m3 0.1 -

K 100mm thick slab m2 1.0 -

Reinforcement

L Reinforcement bars (all sizes) as shown on drawings kg 50.0 -

Pit latrines - 76/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Mesh fabric reinforcement ref. No. A142 laid in floor slab
M with minimum 150 mm side allowance m2 1.0 -

Total page 8 to Superstructures Collection -

Sawn Formwork to:

A Edges of footing m2 1.0 -

B Vertical sides of columns m2 5.0 -

C Sides and soffits of ring beam m2 3.0 -

D Soffittes of slab m2 1.0 -

E Edges of slab girth over 75mm but not exceeding 150mm m 5.0 -

Water Supply System

Galvanized Mild Steel pipes class "B" medium thickness


with and including jointing, fittings and fixe as described

F 25mm diameter outlet pipe to wash basin m 4.0 -

G 25mm diameter inlet pipe m 5.0 -

H 1600 litre fibre glass storage tank No. 1.0 -

Total page 9 to Superstructures Collection -

SUPERSTRUCTURE COLLECTION

Total from page 5 -

Total from page 6 -

Total from page 7 -

Total from page 8 -

Total from above -

SUPERSTRUCTURE SUB TOTAL TO SUMMARY -

SINGLE PIT LATRINE

SUMMARY

Pit latrines - 77/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
(1) SUBSTRUCTURE -

(2) SUPERSTUCTURE -

TOTAL COST OF SINGLE PIT LATRINE -

TWIN PIT LATRINE

SUBSTRUCTURE (Provisional)

Excavation

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise
Prepare site by stripping top 200 mm of soil to remove all
debris including sand (if any) from site and carting away
A spoil m2 30.4 -

Excavate for foundation strip commencing at stripped levels


B depth not exceeding 1.50m deep m3 37.3 -

Pit excavation commencing at stripped levels depth not


C exceeding 1.50m deep m3 18.0 -

D Ditto 1.50 - 3.00 metres deep m3 6.5 -

E Ditto 3.00 - 4.50 metres deep (Optional) m3 6.5 -

F Ditto 4.50 - 6.00 metres deep (Optional) m3 6.5 -

G Extra-over for excavation in rock m3 5.0 -

H Remove surplus excavated material from site m3 29.0 -

I Backfill around foundation m3 32.8 -

Filing

300 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
J concrete surface bed m3 7.3 -

Insitu concrete: class 15: mix 1:3:6

K 50mm blinding layer under foundations m2 15.8 -

L 50mm blinding layer on hardcore surfaces m2 13.5 -

Pit latrines - 78/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
M Treat hardcore surface with approved insecticide m2 13.5 -

Total page 10 to Substructures Collection -

Concrete work

Reinforced Concrete class 15

A Strip foundation m3 1.4 -

Reinforced Concrete class 25

B 100mm thick floor slab with surface steel trowelled smooth m2 24.5 -

C Allow for pit/squat hole in 100mm thick floor slab No 2.0 -

Reinforcement

D Reinforcement bars (All sizes) as shown on drawings kg 145.0 -

Mesh fabric reinforcement ref. No. A142 laid in floor slab


E with minimum 150 mm side allowance m2 29.0 -

Sawn formwork

Formwork to edges of floor slab girth over 75mm but not


F exceeding 150mm m 22.1 -

Formwork to edges of strip footing girth over 75mm but not


G exceeding 150mm m 22.0 -

Formwork to edges of strip footing girth over 150mm but not


H exceeding 2250mm m 16.0 -

Walling

400mm Thick rubble stone retaining wall in cement and


I sand mortar (1:3) m2 8.7 -

300mm Thick rubble stone foundation walling in cement


J and sand mortar (1:3) m2 17.0 -

K 150mm thick masonry wall m2 2.0 -

One layer 1000gauge polythene sheet damp proof


L membrane under beds: 300mm laps m2 21.1 -

M 200mm wide Bituminous felt damp-proof course m 21.1 -

Pit latrines - 79/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Total page 11 to Substructures Collection -

Steps

Concrete work

Reinforced Concrete class 25

A Treads, 300 mm wide m 5.0 -

B Risers, 150 mm high m 4.0 -

C Open string m2 0.3 -

D Waist m2 0.2 -
-
Sawn formwork -

E Risers: girth over 75mm but not exceeding 150mm m 4.0 -

F Open string m2 0.3 -

G Waist m2 0.2 -
Cement and sand mortar (1:4) trowelled beds: on concrete:
to

H Treads, 300 mm wide m 5.0 -

I Risers, 150 mm high m 4.0 -

J Open string m2 0.3 -

K Waist m2 0.2 -

Non slip approved ceramic floor tiles size 300x300x8mm


thick as approved by the Engineer: bedded on cement and
sand screeds(measured separately) : jointed and grouted in
matching colour cement mortar

L Treads, 300 mm wide (Optional) m 5.0 -

M Risers, 150 mm high (Optional) m 4.0 -

N Open string (Optional) m2 0.3 -

O Waist (Optional) m2 0.2 -

Reinforcement

Pit latrines - 80/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

P High tensile reinforcement bars in assorted sizes kg 20.0 -

Total page 12 to Substructures Collection -

Plinths

A 15mm thick cement sand rendering (1:3) to plinths m2 6.0 -

Prepare and apply three coats black bituminous paint to


B rendered plinths externally m2 6.0 -

100mm thick approved lining of pit insides up to bottom of


pit if in loose formation areas or in areas with ground water
C (optional) m2 39.0 -

Total page 13 to Substructures Collection -

SUBSTRUCTURES COLLECTION

Total from page 10 -

Total from page 11 -

Total from page 12 -

Total from above -

Pit latrines - 81/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

SUBSTRUCTURES SUB TOTAL TO SUMMARY -

SUPERSTRUCTURES

Walling

A 150 Thick load bearing solid concrete block walling m2 49.6 -

200mm deep x 400mm wide vent block No 2.0 -

Wall Coping

Precast concrete 600 x 300 x 50 mm Thick twice weathered


and throated coping jointed and pointed in cement and
B sand mortar m 7.0 -

Concrete Work

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

C Lintels m3 0.1 -

Reinforcement

D 8mm Diameter high tensile reinforcement bar kg 3.0 -

E Ditto but 10mm kg 7.0 -

Sawn Formwork to:

F Sides and soffits of lintels m2 1.2 -

Roofing

Roof Structure

Sawn celcured cypress timber as described in:

G 200mm x 15mm Fascia Board m 13.0 -

H l00x50mmRafters m 11.0 -

I 100mm x 50mm wall plate m 12.0 -

Pit latrines - 82/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

J 50 x 50 Purlins m 13.0 -

Roof Covering

30 Gauge galvanized corrugated iron sheets fixed to timber


K Purlins m2 12.0 -
Total page 14 to Superstructures Collection -

Painting and Decorating

Knot prime stop and apply two undercoats and one gloss
L finishing coat oil paint to fascia board 200- 300 mm wide m 13.0 -

Doors

45mm thick Match boarded timber single door, overall size


A 900x 2100mm high No 2.0 -

Wrot cypress 1st grade


150x50mm frame two labours plugged screwed and
B pellated m 10.0 -

C 50x25mm architrave two labours m 10.0 -

D 25x15mm quadrant one labour m 10.0 -

Supply and fix the following ironmongery to timber with


matching screws

E Stainless steel hinges Pairs 3.0 -

F Three lever mortice lock No 2.0 -

G Rubber door stop No 2.0 -

Prepare and apply two undercoats and one finishing coat oil
H paint to timber door m2 8.0 -

Pit latrines - 83/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Total page 15 to Superstructures Collection -

Finishes

Floor Finishes
Cement and sand mortar (1:4)trowelled beds: on concrete:
to

A 32mm floors finished to receive ceramic tile flooring m2 11.5 -

Non slip approved ceramic floor tiles size 300x300x8mm


thick as approved by the Engineer: bedded on cement and
sand screeds(measured separately) : jointed and grouted in
matching colour cement mortar

B Floors (Optional) m2 13.8 -


100 x 25mm Thick skirting to junction with floor and wall
C finish m 21.0 -

Wall Finishes

15mm cement and sand (1:4) backing; wood float finish: to


receive wall tiles: to

D Walls internally (Optional) m2 48.0 -

Supply and fix approved Ceramic wall tiles or other equal


and approved fixed with approved quality adhesive in
accordance with manufacturers instructions bedded on
cement sand backing (measured separately): jointed,
pointed and grouted in matching colour cement mortar: to

E 250x300x8mm thick wall tiles (Optional) m2 48.0 -

12mm lime plaster: steel trowelled finish: on concrete, block


work or stonework: to

F Walls externally m2 40.0 -

Prepare and apply three coats plastic emulsion paint to:

G Walls externally m2 40.0 -

H Extra over keying m2 6.0 -

Pit latrines - 84/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Supply and fix hand washing concrete basin size 300mm x
I 450mm No 1.0 -

J Pit/squat hole cover No 2.0 -

K 100mm diameter PVC vent pipe with fly screen top m 5.0 -

Total page 16 to Superstructures Collection -

Elevated storage tank (All Optional)

Excavation

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Pit excavation commencing at ground level depth not


A exceeding 1.50m deep m3 3.0 -

B Extra-over for excavation in rock m3 0.3 -

C Remove surplus excavated material from site m3 1.0 -

D Backfill around foundation m3 2.0 -

Insitu concrete: class 15: mix 1:3:6

E 50mm blinding layer under foundations m2 1.0 -

Concrete work

Reinforced Concrete class 25

F Pad footing m3 0.3 -

G Column m3 0.4 -

H Beam m3 0.1 -

I 100mm thick slab m2 1.0 -

Reinforcement

J Reinforcement bars (all sizes) as shown on drawings kg 50.0 -

Pit latrines - 85/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Mesh fabric reinforcement ref. No. A142 laid in floor slab
K with minimum 150 mm side allowance m2 1.0 -

Total page 17 to Superstructures Collection -

Sawn Formwork to:

A Edges of footing m2 1.0 -

B Vertical sides of columns m2 5.0 -

C Sides and soffits of ring beam m2 3.0 -

D Soffittes of slab m2 1.0 -

E Edges of slab girth over 75mm but not exceeding 150mm m 5.0 -

Water Supply System

Galvanized Mild Steel pipes class "B" medium thickness


with and including jointing, fittings and fixe as described

F 25mm diameter outlet pipe to wash basin m 4.0 -

G 25mm diameter inlet pipe m 5.0 -

H 1600 litre fibre glass storage tank No. 1.0 -

Total page 18 to Superstructures Collection -

SUPERSTRUCTURE COLLECTION

Total from page 14 -

Total from page 15 -

Total from page 16 -

Total from page 17 -

Total from above -

Pit latrines - 86/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

SUPERSTRUCTURE SUB TOTAL TO SUMMARY -

TWIN PIT LATRINE

SUMMARY

(1) SUBSTRUCTURE -

(2) SUPERSTUCTURE -

Pit latrines - 87/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

TOTAL COST OF TWIN PIT LATRINE -

TRIPLE PIT LATRINE

SUBSTRUCTURE (Provisional)

Excavation

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise
Prepare site by stripping top 200 mm of soil to remove all
debris including sand (if any) from site and carting away
A spoil m2 34.7 -

Excavate for foundation strip commencing at stripped levels


B depth not exceeding 1.50m deep m3 20.0 -

Pit excavation commencing at stripped levels depth not


C exceeding 1.50m deep m3 18.6 -

D Ditto 1.50 - 3.00 metres deep m3 10.4 -

E Ditto 3.00 - 4.50 metres deep (Optional) m3 10.4 -

F Ditto 4.50 - 6.00 metres deep (Optional) m3 10.4 -

G Extra-over for excavation in rock m3 8.0 -

H Remove surplus excavated material from site m3 55.0 -

I Backfill around foundation m3 18.0 -

Filing

300 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
J concrete surface bed m3 7.4 -

Insitu concrete: class 15: mix 1:3:6

K 50mm blinding layer under foundations m2 23.4 -

Pit latrines - 88/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

L 50mm blinding layer on hardcore surfaces m2 24.6 -

M Treat hardcore surface with approved insecticide m2 24.6 -

Total page 20 to Substructures Collection -

Concrete work

Reinforced Concrete class 15

A Strip foundation m3 2.3 -

Reinforced Concrete class 25

B 100mm thick floor slab with surface steel trowelled smooth m2 33.6 -

C Allow for pit/squat hole in 100mm thick floor slab No 3.0 -

Reinforcement

D Reinforcement bars (All sizes) as shown on drawings kg 215.0 -

Mesh fabric reinforcement ref. No. A142 laid in floor slab


E with minimum 150 mm side allowance m2 39.2 -

Sawn formwork

Formwork to edges of floor slab girth over 75mm but not


F exceeding 150mm m 25.5 -

Formwork to edges of strip footing girth over 75mm but not


G exceeding 150mm m 26.0 -

Formwork to edges of strip footing girth over 150mm but not


H exceeding 2250mm m 19.0 -

Walling

400mm Thick rubble stone retaining wall in cement and


I sand mortar (1:3) m2 21.6 -

300mm Thick rubble stone foundation walling in cement


J and sand mortar (1:3) m2 24.0 -

K 150mm thick masonry wall m2 2.0 -

Pit latrines - 89/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

One layer 1000gauge polythene sheet damp proof


L membrane under beds: 300mm laps m2 33.6 -

M 200mm wide Bituminous felt damp-proof course m 34.1 -

Total page 21 to Substructures Collection -

Steps

Concrete work

Reinforced Concrete class 25

A Treads, 300 mm wide m 5.0 -

B Risers, 150 mm high m 4.0 -

C Open string m2 0.3 -

D Waist m2 0.2 -

Sawn formwork

E Risers: girth over 75mm but not exceeding 150mm m 4.0 -

F Open string m2 0.3 -

G Waist m2 0.2 -
Cement and sand mortar (1:4) trowelled beds: on concrete:
to

H Treads, 300 mm wide m 5.0 -

I Risers, 150 mm high m 4.0 -

J Open string m2 0.3 -

K Waist m2 0.2 -

Non slip approved ceramic floor tiles size 300x300x8mm


thick as approved by the Engineer: bedded on cement and
sand screeds(measured separately) : jointed and grouted in
matching colour cement mortar

L Treads, 300 mm wide (Optional) m 5.0 -

M Risers, 150 mm high (Optional) m 4.0 -

Pit latrines - 90/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
N Open string (Optional) m2 0.3 -

O Waist (Optional) m2 0.2 -

Reinforcement

P High tensile reinforcement bars in assorted sizes kg 20.0

Total page 22 to Substructures Collection -

Plinths

A 15mm thick cement sand rendering (1:3) to plinths m2 7.0 -

Prepare and apply three coats black bituminous paint to


B rendered plinths externally m2 7.0 -

100mm thick approved lining of pit insides up to bottom of


pit if in loose formation areas or in areas with ground water
C (Optional) m2 55.0 -

Total page 22 to Substructures Collection -

SUBSTRUCTURES COLLECTION

Total from page 20 -

Total from page 21 -

Total from page 22 -

Total from above -

Pit latrines - 91/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

SUBSTRUCTURES SUB TOTAL TO SUMMARY -

SUPERSTRUCTURES

Walling

A 150 Thick load bearing solid concrete block walling m2 62.3 -

200mm deep x 400mm wide vent block No 3.0 -

Wall Coping

Precast concrete 600 x 300 x 50 mm Thick twice weathered


and throated coping jointed and pointed in cement and
B sand mortar m 9.0 -

Concrete Work

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

C Lintels m3 0.1 -

Reinforcement

D 8mm Diameter high tensile reinforcement bar kg 4.0 -

E Ditto but 10mm kg 11.0 -

Sawn Formwork to:

F Sides and soffits of lintels m2 0.6 -

Roofing

Roof Structure

Sawn celcured cypress timber as described in:

Pit latrines - 92/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
G 200mm x 15mm Fascia Board m 23.6 -

H l00x50mmRafters m 17.0 -

I 100mm x 50mm wall plate m 10.8 -

J 50 x 50 Purlins m 18.0 -

Roof Covering

30 Gauge galvanized corrugated iron sheets fixed to timber


K Purlins m2 16.8 -
Total page 24 to Superstructures Collection -

Painting and Decorating

Knot prime stop and apply two undercoats and one gloss
A finishing coat oil paint to fascia board 200- 300 mm wide m 23.6 -

Doors

45mm thick Match boarded timber single door, overall size


B 900x 2100mm high No 3.0 -

Wrot cypress 1st grade


150x50mm frame two labours plugged screwed and
C pellated m 15.0 -

D 50x25mm architrave two labours m 15.0 -

E 25x15mm quadrant one labour m 15.0 -

Supply and fix the following ironmongery to timber with


matching screws

F Stainless steel hinges Pairs 4.0 -

G Three lever mortice lock No 3.0 -

H Rubber door stop No 3.0 -

Prepare and apply two undercoats and one finishing coat oil
I paint to timber door m2 11.3 -

Pit latrines - 93/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Total page 25 to Superstructures Collection -

Finishes

Floor Finishes
Cement and sand mortar (1:4)trowelled beds: on concrete:
to

A 32mm floors finished to receive ceramic tile flooring m2 16.7 -


-
Non slip approved ceramic floor tiles size 300x300x8mm
thick as approved by the Engineer: bedded on cement and
sand screeds(measured separately) : jointed and grouted in
matching colour cement mortar -

B Floors (Optional) m2 16.7 -


100 x 25mm Thick skirting to junction with floor and wall
C finish m 29.6 -

Wall Finishes

15mm cement and sand (1:4) backing; wood float finish: to


receive wall tiles: to

D Walls internally (Optional) m2 68.0 -

Supply and fix approved Ceramic wall tiles or other equal


and approved fixed with approved quality adhesive in
accordance with manufacturers instructions bedded on
cement sand backing (measured separately): jointed,
pointed and grouted in matching colour cement mortar: to

E 250x300x8mm thick wall tiles (Optional) m2 68.0 -

12mm lime plaster: steel trowelled finish: on concrete, block


work or stonework: to

F Walls externally m2 50.0 -

Prepare and apply three coats plastic emulsion paint to:

Pit latrines - 94/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

G Walls externally m2 50.0 -

H Extra over keying m2 9.0 -


-
Supply and fix hand washing concrete basin size 300mm x
I 450mm No 1.0 -

Total page 26 to Superstructures Collection -

A Pit/squat hole cover No 3.0 -

B 100mm diameter PVC vent pipe with fly screen top m 8.0 -

Elevated storage tank (All Optional)

Excavation

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Pit excavation commencing at ground level depth not


C exceeding 1.50m deep m3 3.0 -

D Extra-over for excavation in rock m3 0.3 -

E Remove surplus excavated material from site m3 1.0 -

F Backfill around foundation m3 2.0 -

Insitu concrete: class 15: mix 1:3:6

G 50mm blinding layer under foundations m2 1.0 -

Concrete work

Reinforced Concrete class 25

H Pad footing m3 0.3 -

I Column m3 0.4 -

J Beam m3 0.1 -

Pit latrines - 95/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
K 100mm thick slab m2 1.0 -

Reinforcement

L Reinforcement bars (all sizes) as shown on drawings kg 50.0 -

Mesh fabric reinforcement ref. No. A142 laid in floor slab


M with minimum 150 mm side allowance m2 1.0 -

Total page 27 to Superstructures Collection -

Sawn Formwork to:

A Edges of footing m2 1.0 -

B Vertical sides of columns m2 5.0 -

C Sides and soffits of ring beam m2 3.0 -

D Soffittes of slab m2 1.0 -

E Edges of slab girth over 75mm but not exceeding 150mm m 5.0 -

Water Supply System

Galvanized Mild Steel pipes class "B" medium thickness


with and including jointing, fittings and fixe as described

F 25mm diameter outlet pipe to wash basin m 4.0 -

G 25mm diameter inlet pipe m 5.0 -

H 1600 litre fibre glass storage tank No. 1.0 -

Total page 28 to Superstructures Collection -

SUPERSTRUCTURE COLLECTION

Total from page 24 -

Total from page 25 -

Total from page 26 -

Total from page 27 -

Pit latrines - 96/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Total from above -

SUPERSTRUCTURE SUB TOTAL TO SUMMARY -

TRIPLE PIT LATRINE

SUMMARY

(1) SUBSTRUCTURE -

(2) SUPERSTUCTURE -

Pit latrines - 97/223


PIT LATRINES

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

TOTAL COST OF TRIPLE PIT LATRINE -

Pit latrines - 98/223


4.25M3 HANDWASHING TANK

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Excavation (Provisional)

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 15 -

Excavate for foundation strip from stripped level depth not


B exceeding 1.50m deep m3 14 -

C Extra-over for excavation in soft rock m3 1 -

D Extra-over for excavation in hard rock m3 1 -

E Remove surplus excavated material from site m3 4 -

F Backfill around foundation m3 10 -

Filing

300 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
G concrete surface bed (measured separately) m3 2 -

150 mm thick approved hardcore filling spread, well


rammed and compacted to receive concrete surface bed
H (measured separately) m3 0.4 -

I Treat hardcore surface with approved insecticide m2 7 -

Concrete work

Mass Concrete class 15 (1:3:6) with 20mm thick maximum


aggregate size in

J 50mm blinding layer under foundations m2 6 -

K 50mm blinding layer on hardcore surfaces m2 7 -

Sub-Total to Collection -

Handwashing tank - 99/223


4.25M3 HANDWASHING TANK

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Walling

400mm Thick rubble stone foundation walling in cement


A and sand mortar (1:3) m2 11 -

Vibrated Reinforced Concrete class 25 (1:1.5:3) with


20mm thick maximum aggregate size in

B Strip foundation m3 1 -

C 100mm Thick floor slab m2 9 -

D 100mm Thick cover slab m2 7 -

E Beam m3 0.2 -

Reinforcement

Mesh fabric reinforcement ref. No. A142 laid in floor slab


F with minimum 150 mm side allowance m2 10 -

G Reinforcement bars (all sizes) as shown on drawings kg 60 -

Sawn formwork

Formwork to edges of strip footing girth over 150mm but


H not exceeding 225mm m 15 -

Formwork to edges of floor slab over 75mm girth but not


I exceeding 150mm m 16 -

Formwork to edges of cover slab over 75mm girth but not


J exceeding 150mm m 9 -

K Formwork to sides and soffits of beam m2 2 -

L Formwork to soffits of cover slab m2 5 -

Plinths

M 15mm thick cement sand rendering (1:3) to plinths m2 1 -

Prepare and apply three coats black bituminous paint to


N rendered plinths externally m2 1 -

Handwashing tank - 100/223


4.25M3 HANDWASHING TANK

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Sub-Total to Collection -

Walling

200mm Thick block wall with hoop iron at every course in


A cement and sand mortar (1:3) m2 9 -

100mm thick masonry partition wall in cement and sand


B mortar (1:3) m2 3 -

Allow for 400mm x 200mm equalizer opening in 100mm


C masonry wall No 1 -

Finishes

Cement and sand mortar (1:3) in:

20 mm Thick plaster mixed with Sika or equivalent water


D proofing admixture internally m2 14 -

20 mm Thick plaster mixed with Sika or equivalent water


E proofing admixture in the waste drain channel m2 4 -

25 mm Thick screed to waste water drain channel slab


F with waterproof cement m2 2 -

G 25 mm Thick screed to base slab with waterproof cement m2 5 -

H 30 mm Thick screed to cover slab m2 6 -

13 mm Thick mortar rendering with steel float finish to


I masonry wall m2 10 -

Prepare and apply three coats plastic emulsion paint to:

J Rendered surfaces m2 10 -

Handwashing tank - 101/223


4.25M3 HANDWASHING TANK

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Sub-Total to Collection -

Water Supply System

Galvanized Mild Steel pipes class "B" medium thickness


with and including jointing, fittings and fixe as described

A 20mm diameter overflow 800mm long No 1 -

B 12mm diameter outlet pipe with stop cock No 8 -

32mm diameter down pipe with gate valve with wheel and
C head No 1 -

600x600x6mm heavy gauge steel primed metal manhole


D cover on slab with and including metal framing all around No 1 -

E 50mm diameter PVC overflow pipe 800mm long No 1 -

F Lay and joint 300mm wide drain channel to soak away pit m 6 -

Sub-Total to Collection -

COLLECTION

Sub-Total from page 1 -

Sub-Total from page 2 -

Sub-Total from page 3 -

Sub-Total from above -

Handwashing tank - 102/223


4.25M3 HANDWASHING TANK

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
TOTAL COST OF 4.25M3 HANDWASHING TANK -

Handwashing tank - 103/223


PROTECTED SHALLOW WELL WATER SYSTEM WITH SOAK AWAY PIT

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

HAND DUG WELL

SUBSTRUCTURE (Provisional)

Note: The quantities given are for a 1500mm shallow


well, 9 metres deep. Quantities to be verified if these
dimensions are varied

Excavation

A Excavate pit 0.00 – 1.50 metres deep m3 9 -

B Ditto 1.50 - 3.00 metres deep m3 9 -

C Ditto 3.00 - 4.50 metres deep m3 9 -

D Ditto 4.50 - 6.00 metres deep m3 9 -

E Ditto 6.00 - 7.50 metres deep m3 9 -

F Ditto 7.50 - 9.00 metres deep m3 9 -

G Ditto 9.00 - 10.50 metres deep (provisional) m3 9 -

H Ditto 10.50 - 12.00 metres deep (provisional) m3 9 -

I Remove surplus excavated materials from site m3 39 -

Return, fill in and ram selected excavated materials


J around walls m3 15 -

K Extra-over for excavating in rock m3 19 -

Filing

Approved hardcore filling spread well rammed and


L compacted m3 5 -

Concrete Work

Mass Concrete class 15 (1:3:6)

M 50mm thick Concrete /Quarry dust blinding m2 7 -

N 25mm gravel pack placed in the bottom of the well m3 2 -

25mm gravel mixed with 5-12mm gravel and coarse


O sand mixture m3 4 -

Sub-Total to Collection -

Well Without Hand Pump - 104/223


PROTECTED SHALLOW WELL WATER SYSTEM WITH SOAK AWAY PIT

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

A 5-12mm graded and mixed gravel or coarse sand fill m3 23 -

Normal backfill with selected granular material up to


B 300mm above water table m3 2 -

Highly compacted impermeable clay or equivalent


C approved material fill m3 1 -

Reinforced Concrete class 25 (1:1.5:3) with 20mm thick


maximum aggregate size

100mm thick perforated reinforced concrete rings


D reinforced as shown on the drawings No 10 -

100mm thick solid reinforced concrete rings reinforced


E as shown on the drawings No 2 -

F Ring Beam, Foot rest and Platform for placing Jerican m3 1 -

G Drain channel m3 1 -

H 100mm Thick sloping cover slab m2 10 -

I 150mm Thick cover slab m2 4 -


675 x 675 x 50mm Thick precast concrete manhole
cover with and including 12mm 'U' shaped mild steel
J lifting eye No 1 -

Sawn Formwork

K Formwork to side and top of ring beam m2 6 -

L Formwork to side and top of drain channel m2 20 -

M Formwork to soffit of cover slab m2 1 -

Reinforcement

N BRC A393 Mesh m2 21 -


38 x 38 x 6mm Thick angle Ring edging to manhole
O cover m 3 -

Walling

400 mm Thick rubble walling jointed in cement and sand


P mortar (1:3) m2 25 -

Sub-Total to Collection -

Finishes

Well Without Hand Pump - 105/223


PROTECTED SHALLOW WELL WATER SYSTEM WITH SOAK AWAY PIT

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

20mm cement and sand (1:3) plaster to internal side of


A walls m2 21 -

12mm Diameter mild steel bars, ‘U’ shaped to form


steps with ends embedded into retaining wall, average
B length 600mm No 30 -

250mm wide grating for the drainage channel made of


Y10 reinforcement bars welded together at 125mm c/c
C to form a mesh m 35 -

SOAK AWAY PIT

Excavation

D Excavate pit 0.00 – 1.50 metres deep m3 5 -

E Ditto 1.50 - 3.00 metres deep m3 1 -

F Remove surplus excavated materials from site m3 5 -

Return, fill in and ram selected excavated materials


G around walls m3 1 -

H Extra-over for excavating in rock m3 2 -

Concrete Work

Mass Concrete class 15 (1:3:6)

I 50mm Thick m2 2 -

Reinforced Concrete class 25 (1:1.5:3)

J 100mm Thick cover slab m2 4 -

Sawn Formwork

K 100mm wide formwork to edges of cover slab m 4 -

Reinforcement

L BRC A142 m2 4 -

Sub-Total to Collection -

Well Without Hand Pump - 106/223


PROTECTED SHALLOW WELL WATER SYSTEM WITH SOAK AWAY PIT

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Walling

400 mm Thick rubble walling in cement and sand mortar


A (1:3) m2 3 -

B Rubble stones m3 3 -

C 6mm thick Grating plate No. 1 -

Sub-Total to Collection -

COLLECTION

Sub-Total from page 1 -

Sub-Total from page 2 -

Sub-Total from page 3 -

Sub-Total from above -

TOTAL COST OF SHALLOW WELL WATER SYSTEM


WITHOUT HAND PUMP -

Well Without Hand Pump - 107/223


PROTECTED SHALLOW WELL WATER SYSTEM WITH HAND PUMP AND SOAK AWAY PIT

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

HAND DUG WELL

SUBSTRUCTURE (Provisional)

Note: The quantities given are for a 1500mm shallow


well, 9 metres deep. Quantities to be verified if these
dimensions are varied

Excavation

A Excavate pit 0.00 – 1.50 metres deep m3 9 -

B Ditto 1.50 - 3.00 metres deep m3 9 -

C Ditto 3.00 - 4.50 metres deep m3 9 -

D Ditto 4.50 - 6.00 metres deep m3 9 -

E Ditto 6.00 - 7.50 metres deep m3 9 -

F Ditto 7.50 - 9.00 metres deep m3 9 -

G Ditto 9.00 - 10.50 metres deep (provisional) m3 9 -

H Ditto 10.50 - 12.00 metres deep (provisional) m3 9 -

I Remove surplus excavated materials from site m3 39 -

Return, fill in and ram selected excavated materials


J around walls m3 15 -

K Extra-over for excavating in rock m3 19 -

Filing

Approved hardcore filling spread well rammed and


L compacted m3 5 -

Concrete Work

Mass Concrete class 15 (1:3:6)

M 50mm thick Concrete /Quarry dust blinding m2 7 -

N 25mm gravel pack placed in the bottom of the well m3 2 -

25mm gravel mixed with 5-12mm gravel and coarse


O sand mixture m3 4 -

Sub-Total to Collection -

Well With Hand Pump - 108/223


PROTECTED SHALLOW WELL WATER SYSTEM WITH HAND PUMP AND SOAK AWAY PIT

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

A 5-12mm graded and mixed gravel or coarse sand fill m3 23 -

Normal backfill with selected granular material up to


B 300mm above water table m3 2 -

Highly compacted impermeable clay or equivalent


C approved material fill m3 1 -

Reinforced Concrete class 25 (1:1.5:3) with 20mm thick


maximum aggregate size

100mm thick perforated reinforced concrete rings


D reinforced as shown on the drawings No 10 -

100mm thick solid reinforced concrete rings reinforced


E as shown on the drawings No 2 -

F Ring Beam, Foot rest and Platform for placing Jerican m3 1 -

G Drain channel m3 1 -

H 100mm Thick sloping cover slab m2 10 -

I 150mm Thick cover slab m2 4 -


675 x 675 x 50mm Thick precast concrete manhole
cover with and including 12mm 'U' shaped mild steel
J lifting eye No 1 -

Sawn Formwork

K Formwork to side and top of ring beam m2 6 -

L Formwork to side and top of drain channel m2 20 -

M Formwork to soffit of cover slab m2 1 -

Reinforcement

N BRC A393 Mesh m2 21 -


38 x 38 x 6mm Thick angle Ring edging to manhole
O cover m 3 -

Walling

400 mm Thick rubble walling jointed in cement and sand


P mortar (1:3) m2 25 -

Sub-Total to Collection -

Finishes

Well With Hand Pump - 109/223


PROTECTED SHALLOW WELL WATER SYSTEM WITH HAND PUMP AND SOAK AWAY PIT

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

20mm cement and sand (1:3) plaster to internal side of


A walls m2 21 -

12mm Diameter mild steel bars, ‘U’ shaped to form


steps with ends embedded into retaining wall, average
B length 600mm No 30 -

Supply, fix and maintain AFRIDEF hand pump complete


with 50mm Diameter PVC drop pipe to bottom of well
C with and including foot valve with filter No 1 -

250mm wide grating for the drainage channel made of


Y10 reinforcement bars welded together at 125mm c/c
D to form a mesh m 35 -

SOAK AWAY PIT

Excavation

E Excavate pit 0.00 – 1.50 metres deep m3 5 -

F Ditto 1.50 - 3.00 metres deep m3 1 -

G Remove surplus excavated materials from site m3 5 -

Return, fill in and ram selected excavated materials


H around walls m3 1 -

I Extra-over for excavating in rock m3 2 -

Concrete Work

Mass Concrete class 15 (1:3:6)

J 50mm Thick m2 2 -

Reinforced Concrete class 25 (1:1.5:3)

K 100mm Thick cover slab m2 4 -

Sawn Formwork

L 100mm wide formwork to edges of cover slab m 4 -

Reinforcement

M BRC A142 m2 4 -

Sub-Total to Collection -

Well With Hand Pump - 110/223


PROTECTED SHALLOW WELL WATER SYSTEM WITH HAND PUMP AND SOAK AWAY PIT

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Walling

400 mm Thick rubble walling in cement and sand mortar


A (1:3) m2 3 -

B Rubble stones m3 3 -

C 6mm thick Grating plate No. 1 -

D Allow for training of Hand Pump Operator Sum 1 -

Sub-Total to Collection -

COLLECTION

Sub-Total from page 1 -

Sub-Total from page 2 -

Sub-Total from page 3 -

Sub-Total from above -

TOTAL COST OF SHALLOW WELL WATER SYSTEM -


WITH HAND PUMP

Well With Hand Pump - 111/223


TWIN GENERATOR ROOM

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

SUBSTRUCTURE (Provisional)

Excavation

Excavation including maintaining and supporting sides


and keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 200 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 55 -

Excavate to reduce levels not exceeding 1.50m deep


B average depth 300mm m3 15 -

Excavate for foundation strip commencing at reduced


C levels depth not exceeding 1.50m deep m3 25 -

D Extra-over for excavation in rock m3 8 -

E Remove surplus excavated material from site m3 11 -

F Backfill around foundation m3 19 -

Filing

300 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
G concrete surface bed m3 15 -

Insitu concrete: class 15: mix 1:3:6

50mm blinding layer on hardcore surfaces and under


H foundations m2 55 -

I Treat hardcore surface with approved insecticide m2 45 -

Concrete work

Reinforced Concrete class 25

J Strip foundation m3 4.0 -


150mm thick floor slab with surface steel trowelled
K smooth m2 35 -

Expansion Joint

Form 20mm wide expansion joint with flexcell joint filler


L and polysulphide joint sealant for the plinth m2 5.0 -

Total page 1 to Substructures Collection -

Twin Generator Room - 112/223


TWIN GENERATOR ROOM

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Concrete Work

A 150mm thick sloping ramp m2 6 -

B 300 mm thick generator plinth m3 2 -

Reinforcement

C 10mm and 8mm diameter high tensile reinforcement bars kg 90 -

Mesh fabric reinforcement ref. No. A142 laid in floor slab


D with minimum 150 mm side allowance m2 34 -

Mesh fabric reinforcement ref. No. A393 laid in generator


E plinth with minimum 150 mm side allowance m2 12 -

Sawn formwork

Formwork to sides of generator plinth girth over 75mm


F but not exceeding 150mm m 10 -

Formwork to edges of floor slab girth over 75mm but not


G exceeding 150mm m 35 -

Walling

400mm Thick rubble stone foundation walling in cement


H and sand mortar (1:3) m2 22 -

One layer 1000gauge polythene sheet damp proof


I membrane under beds: 300mm laps m2 32 -

J 200mm wide Bituminous felt damp-proof course m 29 -

Plinths

K 15mm thick cement sand rendering (1:3) to plinths m2 12 -

Prepare and apply three coats black bituminous paint to


L rendered plinths externally m2 12 -

Total page 2 to Substructures Collection -

SUBSTRUCTURES COLLECTION

Total from page 1 -

Total from page 2 -

SUBSTRUCTURES SUB TOTAL TO SUMMARY -

Twin Generator Room - 113/223


TWIN GENERATOR ROOM

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
SUPERSTRUCTURES

Walling

A 200 Thick load bearing solid concrete block walling m2 65 -

Wall Coping

Precast concrete 600 x 300 x 50 mm Thick twice


weathered and throated coping jointed and pointed in
B cement and sand mortar m 19 -

Concrete Work

Vibrated reinforced concrete class 25 (1:1.5:3) with


20mm maximum aggregate as described in:

C Ring Beam m3 1.5 -

D Reinforcement

E 8mm Diameter high tensile reinforcement bar kg 70 -

F Ditto but 10mm kg 30 -

Sawn Formwork

G Formwork to sides and soffits of ring beam m2 18 -

Roofing

Roof Structure

Sawn celcured cypress timber as described in:

H 200mm x 25mm Fascia Board m 29 -

I l00x50mmRafters m 29 -

J 100mm x 50mm wall plate m 34 -

K 50 x 50 Purlins m 50 -

Roof Covering

28 Gauge galvanized corrugated iron sheets fixed to


L timber Purlins m2 50 -

26 Gauge flushing 450mm wide bent to shape tucked


M under roofing sheets and parapet wall m 30 -

Twin Generator Room - 114/223


TWIN GENERATOR ROOM

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Total page 3 to Superstructures Collection -

Painting and Decorating

Knot prime stop and apply two undercoats and one gloss
A finishing coat oil paint to fascia board 200- 300 mm wide m 29 -

Doors and Windows

Purpose-made steel casement double door,


manufactured from standard sections, finished with
pressed steel horizontal louvers and complete with all the
B necessary ironmongery overall size 2000 x 2100mm high No 1 -
Purpose-made steel casement double door,
manufactured from standard sections, finished with
pressed steel horizontal louvers and complete with all the
necessary ironmongery overall size 900 x 2100mm high
C (Provisional) No 1 -

Metal grill window with wire mesh overall size


D 2000x1000mm high No 3 -

Metal grill window with wire mesh overall size


E 900x1000mm high (Provisional) 1 -

Precast concrete window cill size 260 x 50mm Thick


sunk - weathered and throated and bedded and jointed in
F cement sand mortar m 6 -

Prepare and apply two undercoats and one finishing coat


G oil paint to steel door m2 13 -

H Ditto windows m2 14 -

Floor Finishes

Cement and sand mortar (1:3) in:

I 30mm thick steel trowelled screed m2 32 -

100 x 25mm Thick skirting to junction with floor and wall


J finish m 30 -

Total page 4 to Superstructures Collection -

Wall Finishes

Twin Generator Room - 115/223


TWIN GENERATOR ROOM

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Cement and sand mortar (1:3) rendering in:

12mm lime plaster: steel trowelled finish: on concrete,


block work or stonework: to

A Walls and beams m2 84 -

Prepare and apply three coats plastic emulsion paint to:

B Plastered surfaces m2 84 -

Total page 5 to Superstructures Collection -

SUPERSTRUCTURE COLLECTION

Total from page 3 -

Total from page 4 -

Total from above -

SUPERSTRUCTURE SUB TOTAL TO SUMMARY -

GENERATOR ROOM

SUMMARY

(1) SUBSTRUCTURE -

(2) SUPERSTUCTURE -

TOTAL COST OF GENERATOR ROOM -

Twin Generator Room - 116/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

20M3 RECTANGULAR GROUND STORAGE WATER


TANK

Excavation
Excavation including maintaining and supporting sides
and keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 24.0 -
Excavate for foundation strip commencing at reduced
levels depth exceeding 0.4 m but not exceeding 1.50m
B deep m3 10.8 -

C Extra-over for excavating in rock m3 3.0 -

D Remove surplus excavated material from site m3 4.0 -

E Backfill around foundation m3 6.8 -

Filing

300 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
F concrete surface bed (measured separately) m3 4.0 -

G Treat hardcore surface with approved insecticide m2 13.0 -

Concrete work

Mass Concrete class 15 (1:3:6) with 20mm thick


maximum aggregate size in

H 50mm thick blinding to surfaces of hardcore m2 13.0 -

Walling

600mm Thick rubble stone foundation walling in cement


I and sand mortar (1:3) m3 11.8 -

Sub-Total to Collection -

Ground Water Storage Tanks - 117/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Vibrated Reinforced Concrete class 25 (1:1.5:3) with
20mm thick maximum aggregate size in

A 200mm Thick floor slab m2 21.0 -

Reinforcement

B Reinforcement bars (all sizes) as shown on drawings kg 375.0 -

Sawn formwork

Formwork to edges of slab over 150mm girth but not


C exceeding 225mm m 18.0 -

Walling

400mm Thick rubble walling in cement and sand mortar


D (1:3) m2 30.0 -

Concrete Work

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

E Ring beam m3 1.0 -

Reinforcement

F 8mm Diameter high tensile reinforcement bar kg 20.0 -

G Ditto but 12mm kg 50.0 -

Sawn Formwork

H Formwork to sides and soffits of beam m2 13.8 -

Finishes

Cement and sand mortar (1:3) plaster in:

20 mm Thick plaster mixed with Sika or equivalent water


I proofing admixture m2 25.0 -

J 15mm thick rendering to plinths m2 11.0 -

Sub-Total to Collection -

Ground Water Storage Tanks - 118/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Finishes

Cement and sand mortar (1:3) plaster in:

A 15mm thick rendering to external surfaces of wall m2 27.0 -

Prepare and apply three coats of bituminous black paint


B to rendered plinths externally m2 11.0 -

100mm diameter galvanized pipe cast insitu with base


C slab to support roof timber m 2.0 -

Roof Structure

Sawn celcured cypress timber as described in:

D 200mm x 25mm Fascia Board m 18.8 -

E 100mm x 50mm wall plate m 15.6 -

F 50 x 50 Purlins m 33.0 -

STRUCTURAL TIMBER

Supply and fix seasoned timber including timber joint


connection accessories; galvanized steel cleats and
gusset plates, bolts including boring holes and fixing
tight; and all other accessories necessary

G 50x150mm kingpost m 1.0 -

H 50x75mm ties and struts m 7.0 -

I 50x100mm rafter m 11.0 -

J 50x150mm tie beam m 10.0 -

Roof Covering

30 Gauge galvanized corrugated iron sheets fixed to


K timber Purlins m2 22.0 -

L 0.5mm thick sheet plate No 8.0 -

Ground Water Storage Tanks - 119/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Sub-Total to Collection -

Painting and Decorating

Knot prime stop and apply two undercoats and one gloss
A finishing coat oil paint to fascia board 200- 300 mm wide m 19.0 -

Water Supply System

Galvanized Mild Steel pipes class "B" medium thickness


with and including jointing, fittings and fixe as described

B 75mm diameter drain pipe 800mm long No 1.0 -

C 50mm diameter draw off pipe Ditto No 1.0 -

D 50mm diameter brass gate valve with wheel and head No 2.0 -

E 20mm diameter stop corks No 2.0 -

600x600x6mm heavy gauge steel primed metal manhole


F cover on slab with and including metal framing all around No 1.0 -

20mm Diameter bars, ‘U’ shaped to form steps with ends


G embedded into retaining wall, average length 450mm No 10.0 -

H 50mm diameter PVC overflow pipe 800mm long No 2.0 -

I 200mm wide PVC water bar m 14.0 -

Sub-Total to Collection -

COLLECTION

Sub-Total from page 1 -

Sub-Total from page 2 -

Sub-Total from page 3 -

Sub-Total from above -

TOTAL COST OF 20M3 GROUND STORAGE TANK -

Ground Water Storage Tanks - 120/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

25M3 RECTANGULAR GROUND STORAGE WATER


TANK

Excavation
Excavation including maintaining and supporting sides
and keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 29.2 -
Excavate for foundation strip commencing at reduced
levels depth exceeding 0.4 m but not exceeding 1.50m
B deep m3 6.3 -

C Extra-over for excavating in rock m3 4.0 -

D Remove surplus excavated material from site m3 5.0 -

E Backfill around foundation m3 1.3 -

Filing

300 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
F concrete surface bed (measured separately) m3 5.0 -

G Treat hardcore surface with approved insecticide m2 16.0 -

Concrete work

Mass Concrete class 15 (1:3:6) with 20mm thick


maximum aggregate size in

H 50mm thick blinding to surfaces of hardcore m2 16.0 -

Walling

600mm Thick rubble stone foundation walling in cement


I and sand mortar (1:3) m3 11.5 -

Sub-Total to Collection -

Ground Water Storage Tanks - 121/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Vibrated Reinforced Concrete class 25 (1:1.5:3) with


20mm thick maximum aggregate size in

A 200mm Thick floor slab m2 25.0 -

Reinforcement

B Reinforcement bars (all sizes) as shown on drawings kg 430.0 -

Sawn formwork

Formwork to edges of slab over 150mm girth but not


C exceeding 225mm m 20.0 -

Walling

400mm Thick rubble walling in cement and sand mortar


D (1:3) m2 31.7 -

Concrete Work

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

E Ring beam m3 1.5 -

Reinforcement

F 8mm Diameter high tensile reinforcement bar kg 20.0 -

G Ditto but 12mm kg 50.0 -

Sawn Formwork

H Formwork to sides and soffits of beam m2 14.1 -

Finishes

Cement and sand mortar (1:3) plaster in:

20 mm Thick plaster mixed with Sika or equivalent water


I proofing admixture m2 28.8 -

J 15mm thick rendering to plinths m2 12.0 -

Ground Water Storage Tanks - 122/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Sub-Total to Collection -

Finishes

Cement and sand mortar (1:3) plaster in:

A 15mm thick rendering to external surfaces of wall m2 34.6 -

Prepare and apply three coats of bituminous black paint


B to rendered plinths externally m2 12.0 -

100mm diameter galvanized pipe cast insitu with base


C slab to support roof timber m 2.0 -

Roof Structure

Sawn celcured cypress timber as described in:

D 200mm x 25mm Fascia Board m 20.8 -

E 100mm x 50mm wall plate m 17.6 -

F 50 x 50 Purlins m 34.0 -

STRUCTURAL TIMBER

Supply and fix seasoned timber including timber joint


connection accessories; galvanized steel cleats and
gusset plates, bolts including boring holes and fixing
tight; and all other accessories necessary

G 50x150mm kingpost m 1.0 -

H 50x75mm ties and struts m 8.0 -

I 50x100mm rafter m 12.0 -

J 50x150mm tie beam m 11.0 -

Roof Covering

30 Gauge galvanized corrugated iron sheets fixed to


K timber Purlins m2 26.0 -

L 0.5mm thick sheet plate No 8.0 -

Ground Water Storage Tanks - 123/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Sub-Total to Collection -

Painting and Decorating

Knot prime stop and apply two undercoats and one gloss
A finishing coat oil paint to fascia board 200- 300 mm wide m 20.8 -

Water Supply System

Galvanized Mild Steel pipes class "B" medium thickness


with and including jointing, fittings and fixe as described

B 75mm diameter drain pipe 800mm long No 1.0 -

C 50mm diameter draw off pipe Ditto No 1.0 -

D 50mm diameter brass gate valve with wheel and head No 2.0 -

E 20mm diameter stop corks No 2.0 -

600x600x6mm heavy gauge steel primed metal manhole


F cover on slab with and including metal framing all around No 1.0 -

20mm Diameter bars, ‘U’ shaped to form steps with ends


G embedded into retaining wall, average length 450mm No 10.0 -

H 50mm diameter PVC overflow pipe 800mm long No 2.0 -

I 200mm wide PVC water bar m 15.0 -

Sub-Total to Collection -

COLLECTION

Sub-Total from page 5 -

Sub-Total from page 6 -

Sub-Total from page 7 -

Sub-Total from above -

Ground Water Storage Tanks - 124/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

TOTAL COST OF 25M3 GROUND STORAGE TANK -

50M3 RECTANGULAR GROUND STORAGE WATER


TANK

Excavation
Excavation including maintaining and supporting sides
and keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 44.0 -
Excavate for foundation strip commencing at reduced
levels depth exceeding 0.4 m but not exceeding 1.50m
B deep m3 17.7 -

C Extra-over for excavating in rock m3 5.0 -

D Remove surplus excavated material from site m3 6.0 -

E Backfill around foundation m3 11.7 -

Filing

300 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
F concrete surface bed (measured separately) m3 7.0 -

G Treat hardcore surface with approved insecticide m2 24.0 -

Concrete work

Mass Concrete class 15 (1:3:6) with 20mm thick


maximum aggregate size in

H 50mm thick blinding to surfaces of hardcore m2 24.0 -

Walling

600mm Thick rubble stone foundation walling in cement


I and sand mortar (1:3) m3 12.5 -

Ground Water Storage Tanks - 125/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Sub-Total to Collection -

Vibrated Reinforced Concrete class 25 (1:1.5:3) with


20mm thick maximum aggregate size in

A 200mm Thick floor slab m2 33.6 -

Reinforcement

B Reinforcement bars (all sizes) as shown on drawings kg 630.0 -

Sawn formwork

Formwork to edges of slab over 150mm girth but not


C exceeding 225mm m 23.2 -

Walling

400mm Thick rubble walling in cement and sand mortar


D (1:3) m2 47.8 -

Concrete Work

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

E Ring beam m3 1.7 -

Reinforcement

F 8mm Diameter high tensile reinforcement bar kg 30.0 -

G Ditto but 12mm kg 85.0 -

Sawn Formwork

H Formwork to sides and soffits of beam m2 16.6 -

Finishes

Cement and sand mortar (1:3) plaster in:

20 mm Thick plaster mixed with Sika or equivalent water


I proofing admixture m2 44.2 -

J 15mm thick rendering to plinths m2 14.0 -

Ground Water Storage Tanks - 126/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Sub-Total to Collection -

Finishes

Cement and sand mortar (1:3) plaster in:

A 15mm thick rendering to external surfaces of wall m2 51.5 -

Prepare and apply three coats of bituminous black paint


B to rendered plinths externally m2 14.0 -

100mm diameter galvanized pipe cast insitu with base


C slab to support roof timber m 3.0 -

Roof Structure

Sawn celcured cypress timber as described in:

D 200mm x 25mm Fascia Board m 21.0 -

E 100mm x 50mm wall plate m 19.0 -

F 50 x 50 Purlins m 55.0 -

STRUCTURAL TIMBER

Supply and fix seasoned timber including timber joint


connection accessories; galvanized steel cleats and
gusset plates, bolts including boring holes and fixing
tight; and all other accessories necessary

G 50x150mm kingpost m 1.0 -

H 50x75mm ties and struts m 18.0 -

I 50x100mm rafter m 27.0 -

J 50x150mm tie beam m 52.0 -

Roof Covering

30 Gauge galvanized corrugated iron sheets fixed to


K timber Purlins m2 36.0 -

L 0.5mm thick sheet plate No 8.0 -

Ground Water Storage Tanks - 127/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Sub-Total to Collection -

Painting and Decorating

Knot prime stop and apply two undercoats and one gloss
A finishing coat oil paint to fascia board 200- 300 mm wide m 24.0 -

Water Supply System

Galvanized Mild Steel pipes class "B" medium thickness


with and including jointing, fittings and fixe as described

B 75mm diameter drain pipe 800mm long No 1.0 -

C 50mm diameter draw off pipe Ditto No 1.0 -

D 50mm diameter brass gate valve with wheel and head No 2.0 -

E 20mm diameter stop corks No 2.0 -

600x600x6mm heavy gauge steel primed metal manhole


F cover on slab with and including metal framing all around No 1.0 -

20mm Diameter bars, ‘U’ shaped to form steps with ends


G embedded into retaining wall, average length 450mm No 10.0 -

H 50mm diameter PVC overflow pipe 800mm long No 2.0 -

I 200mm wide PVC water bar m 19.0 -

Sub-Total to Collection -

COLLECTION

Sub-Total from page 9 -

Sub-Total from page 10 -

Sub-Total from page 11 -

Sub-Total from above -

Ground Water Storage Tanks - 128/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

TOTAL COST OF 50M3 GROUND STORAGE TANK -

60M3 RECTANGULAR GROUND STORAGE WATER


TANK

Excavation
Excavation including maintaining and supporting sides
and keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 44.2 -
Excavate for foundation strip commencing at reduced
levels depth exceeding 0.4 m but not exceeding 1.50m
B deep m3 19.2 -

C Extra-over for excavating in rock m3 6.0 -

D Remove surplus excavated material from site m3 7.0 -

E Backfill around foundation m3 12.2 -

Filing

300 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
F concrete surface bed (measured separately) m3 8.3 -

G Treat hardcore surface with approved insecticide m2 27.6 -

Concrete work

Mass Concrete class 15 (1:3:6) with 20mm thick


maximum aggregate size in

H 50mm thick blinding to surfaces of hardcore m2 27.6 -

Walling

600mm Thick rubble stone foundation walling in cement


I and sand mortar (1:3) m3 11.5 -

Ground Water Storage Tanks - 129/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Sub-Total to Collection -

Vibrated Reinforced Concrete class 25 (1:1.5:3) with


20mm thick maximum aggregate size in

A 200mm Thick floor slab m2 31.9 -

Reinforcement

B Reinforcement bars (all sizes) as shown on drawings kg 680.0 -

Sawn formwork

Formwork to edges of slab over 150mm girth but not


C exceeding 225mm m 24.2 -

Walling

400mm Thick rubble walling in cement and sand mortar


D (1:3) m2 52.0 -

Concrete Work

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

E Ring beam m3 1.8 -

Reinforcement

F 8mm Diameter high tensile reinforcement bar kg 40.0 -

G Ditto but 12mm kg 100.0 -

Sawn Formwork

H Formwork to sides and soffits of beam m2 18.1 -

Finishes

Cement and sand mortar (1:3) plaster in:

20 mm Thick plaster mixed with Sika or equivalent water


I proofing admixture m2 48.3 -

J 15mm thick rendering to plinths m2 15.0 -

Ground Water Storage Tanks - 130/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Sub-Total to Collection -

Finishes

Cement and sand mortar (1:3) plaster in:

A 15mm thick rendering to external surfaces of wall m2 55.7 -

Prepare and apply three coats of bituminous black paint


B to rendered plinths externally m2 15.0 -

100mm diameter galvanized pipe cast insitu with base


C slab to support roof timber m 3.0 -

Roof Structure

Sawn celcured cypress timber as described in:

D 200mm x 25mm Fascia Board m 25.8 -

E 100mm x 50mm wall plate m 22.6 -

F 50 x 50 Purlins m 57.0 -

STRUCTURAL TIMBER

Supply and fix seasoned timber including timber joint


connection accessories; galvanized steel cleats and
gusset plates, bolts including boring holes and fixing
tight; and all other accessories necessary

G 50x150mm kingpost m 1.0 -

H 50x75mm ties and struts m 19.0 -

I 50x100mm rafter m 30.0 -

J 50x150mm tie beam m 58.0 -

Roof Covering

30 Gauge galvanized corrugated iron sheets fixed to


K timber Purlins m2 42.0 -

L 0.5mm thick sheet plate No 8.0 -

Ground Water Storage Tanks - 131/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Sub-Total to Collection -

Painting and Decorating

Knot prime stop and apply two undercoats and one gloss
A finishing coat oil paint to fascia board 200- 300 mm wide m 23.0 -

Water Supply System

Galvanized Mild Steel pipes class "B" medium thickness


with and including jointing, fittings and fixe as described

B 75mm diameter drain pipe 800mm long No 1.0 -

C 50mm diameter draw off pipe Ditto No 1.0 -

D 50mm diameter brass gate valve with wheel and head No 2.0 -

E 20mm diameter stop corks No 2.0 -

600x600x6mm heavy gauge steel primed metal manhole


F cover on slab with and including metal framing all around No 1.0 -

20mm Diameter bars, ‘U’ shaped to form steps with ends


G embedded into retaining wall, average length 450mm No 12.0 -

H 50mm diameter PVC overflow pipe 800mm long No 2.0 -

I 200mm wide PVC water bar m 20.0 -

Sub-Total to Collection -

COLLECTION

Sub-Total from page 13 -

Sub-Total from page 14 -

Sub-Total from page 15 -

Sub-Total from above -

Ground Water Storage Tanks - 132/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

TOTAL COST OF 60M3 GROUND STORAGE TANK -

5M3 RECTANGULAR GROUND STORAGE WATER


TANK

Excavation
Excavation including maintaining and supporting sides
and keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 13.0 -
Excavate for foundation strip commencing at reduced
levels depth exceeding 0.4 m but not exceeding 1.50m
B deep m3 3.7 -

C Extra-over for excavating in rock m3 2.0 -

D Remove surplus excavated material from site m3 4.0 -

E Backfill around foundation m3 0.3 -

Filing

300 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
F concrete surface bed (measured separately) m3 1.7 -

G Treat hardcore surface with approved insecticide m2 5.6 -

Concrete work

Mass Concrete class 15 (1:3:6) with 20mm thick


maximum aggregate size in

H 50mm thick blinding to surfaces of hardcore m2 5.6 -

I 50mm blinding layer under foundations m2 6.2 -

Walling

300mm Thick rubble stone foundation walling in cement


J and sand mortar (1:3) m2 8.8 -

Ground Water Storage Tanks - 133/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Sub-Total to Collection -

Vibrated Reinforced Concrete class 25 (1:1.5:3) with


20mm thick maximum aggregate size in

A 150mm Thick floor slab m2 8.8 -

B Strip foundation m3 1.2 -

Reinforcement

C Reinforcement bars (all sizes) as shown on drawings kg 205.0 -

Sawn formwork

Formwork to edges of slab over 75mm girth but not


D exceeding 150mm m 12.0 -

Formwork to edges of footing over 150mm girth but not


E exceeding 225mm m 25.6 -

Walling

200mm Thick masonry walling in cement and sand mortar


F (1:3) m2 16.8 -

Concrete Work

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

G Ring beam m3 0.4 -

Reinforcement

H 8mm Diameter high tensile reinforcement bar kg 25.0 -

I Ditto but 10mm kg 70.0 -

Sawn Formwork

J Formwork to sides and soffits of beam m2 8.3 -

Ground Water Storage Tanks - 134/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Sub-Total to Collection -

Finishes

Cement and sand mortar (1:3) plaster in:

20 mm Thick plaster mixed with Sika or equivalent water


A proofing admixture m2 16.8 -

B 15mm thick rendering to plinths m2 11.0 -

C 15mm thick rendering to external surfaces of wall m2 16.8 -

Prepare and apply three coats of bituminous black paint


D to rendered plinths externally m2 11.0 -

Roof Structure

Sawn celcured cypress timber as described in:

E 200mm x 25mm Fascia Board m 12.9 -

F 100mm x 50mm wall plate m 10.8 -

G 50 x 50 Purlins m 11.0 -

STRUCTURAL TIMBER

Supply and fix seasoned timber including timber joint


connection accessories; galvanized steel cleats and
gusset plates, bolts including boring holes and fixing
tight; and all other accessories necessary

H 50x100mm rafter m 7.0 -

Roof Covering

30 Gauge galvanized corrugated iron sheets fixed to


I timber Purlins m2 10.7 -

J 0.5mm thick sheet plate No 6.0 -

Painting and Decorating

Knot prime stop and apply two undercoats and one gloss
K finishing coat oil paint to fascia board 200- 300 mm wide m 12.9 -

Ground Water Storage Tanks - 135/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Sub-Total to Collection -

Water Supply System

Galvanized Mild Steel pipes class "B" medium thickness


with and including jointing, fittings and fixe as described

A 75mm diameter washout 800mm long No 1.0 -

B 50mm diameter outlet pipe Ditto No 1.0 -

C 50mm diameter brass gate valve with wheel and head No 2.0 -

D 20mm diameter stop corks No 2.0 -

600x600x6mm heavy gauge steel primed metal manhole


E cover on slab with and including metal framing all around No 1.0 -

20mm Diameter bars, ‘U’ shaped to form steps with ends


F embedded into retaining wall, average length 450mm No 3.0 -

G 50mm diameter PVC overflow pipe 800mm long No 1.0 -

H 200mm wide PVC water bar m 10.0 -

I 200x 200mm vent placed centrally No 2.0 -

Sub-Total to Collection -

COLLECTION

Sub-Total from page 17 -

Sub-Total from page 18 -

Sub-Total from page 19 -

Sub-Total from above -

Ground Water Storage Tanks - 136/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

TOTAL COST OF 5M3 GROUND STORAGE TANK -

10M3 RECTANGULAR GROUND STORAGE WATER


TANK

Excavation
Excavation including maintaining and supporting sides
and keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 11.9 -
Excavate for foundation strip commencing at reduced
levels depth exceeding 0.4 m but not exceeding 1.50m
B deep m3 4.1 -

C Extra-over for excavating in rock m3 2.0 -

D Remove surplus excavated material from site m3 5.0 -

E Backfill around foundation m3 0.9 -

Filing

300 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
F concrete surface bed (measured separately) m3 2.1 -

G Treat hardcore surface with approved insecticide m2 7.0 -

Concrete work

Mass Concrete class 15 (1:3:6) with 20mm thick


maximum aggregate size in

H 50mm thick blinding to surfaces of hardcore m2 7.0 -

I 50mm blinding layer under foundations m2 6.8 -

Walling

300mm Thick rubble stone foundation walling in cement


J and sand mortar (1:3) m2 8.8 -

Ground Water Storage Tanks - 137/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Sub-Total to Collection -

Vibrated Reinforced Concrete class 25 (1:1.5:3) with


20mm thick maximum aggregate size in

A 150mm Thick floor slab m2 5.6 -

B Strip foundation m3 1.2 -

Reinforcement

C Reinforcement bars (all sizes) as shown on drawings kg 270.0 -

Sawn formwork

Formwork to edges of slab over 75mm girth but not


D exceeding 150mm m 13.0 -

Formwork to edges of footing over 150mm girth but not


E exceeding 225mm m 20.8 -

Walling

200mm Thick masonry walling in cement and sand mortar


F (1:3) m2 14.7 -

Concrete Work

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

G Ring beam m3 0.4 -

Reinforcement

H 8mm Diameter high tensile reinforcement bar kg 32.0 -

I Ditto but 10mm kg 85.0 -

Sawn Formwork

J Formwork to sides and soffits of beam m2 8.3 -

Ground Water Storage Tanks - 138/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Sub-Total to Collection -

Finishes

Cement and sand mortar (1:3) plaster in:

20 mm Thick plaster mixed with Sika or equivalent water


A proofing admixture m2 14.7 -

B 15mm thick rendering to plinths m2 4.0 -

C 15mm thick rendering to external surfaces of wall m2 14.7 -

Prepare and apply three coats of bituminous black paint


D to rendered plinths externally m2 4.0 -

Roof Structure

Sawn celcured cypress timber as described in:

E 200mm x 25mm Fascia Board m 14.0 -

F 100mm x 50mm wall plate m 11.0 -

G 50 x 50 Purlins m 14.0 -

STRUCTURAL TIMBER

Supply and fix seasoned timber including timber joint


connection accessories; galvanized steel cleats and
gusset plates, bolts including boring holes and fixing
tight; and all other accessories necessary

H 50x100mm rafter m 11.0 -

Roof Covering

30 Gauge galvanized corrugated iron sheets fixed to


I timber Purlins m2 12.0 -

J 0.5mm thick sheet plate No 6.0 -

Painting and Decorating

Knot prime stop and apply two undercoats and one gloss
K finishing coat oil paint to fascia board 200- 300 mm wide m 14.0 -

Ground Water Storage Tanks - 139/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Sub-Total to Collection -

Water Supply System

Galvanized Mild Steel pipes class "B" medium thickness


with and including jointing, fittings and fixe as described

A 75mm diameter washout 800mm long No 1.0 -

B 50mm diameter outlet pipe Ditto No 1.0 -

C 50mm diameter brass gate valve with wheel and head No 2.0 -

D 20mm diameter stop corks No 2.0 -

600x600x6mm heavy gauge steel primed metal manhole


E cover on slab with and including metal framing all around No 1.0 -

20mm Diameter bars, ‘U’ shaped to form steps with ends


F embedded into retaining wall, average length 450mm No 5.0 -

G 50mm diameter PVC overflow pipe 800mm long No 1.0 -

H 200mm wide PVC water bar m 11.0 -

I 200x 200mm vent place centrally No 2.0 -

Sub-Total to Collection -

COLLECTION

Sub-Total from page 21 -

Sub-Total from page 22 -

Sub-Total from page 23 -

Sub-Total from above -

Ground Water Storage Tanks - 140/223


GROUND WATER STORAGE TANKS (5,10, 20, 25, 50 AND 60M3)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

TOTAL COST OF 10M3 GROUND STORAGE TANK -

Ground Water Storage Tanks - 141/223


UNDERGROUND WATER STORAGE RESERVOIR / BERKAD

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)

450M3 UNDERGROUND WATER STORAGE


RESERVOIR (BERKAD)

Excavation (Provisional)

Excavation including maintaining and supporting sides


and keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 164

Pit excavation commencing at reduced levels depth


B exceeding 0.4 m but not exceeding 1.50m deep m3 174

C Ditto 1.50 - 3.00 metres deep m3 161

D Ditto 3.00 - 4.50 metres deep m3 35

Excavate for foundation strip depth exceeding 3.00 m but


E not exceeding 4.50m deep m3 61

F Ditto 4.50 - 6.00 metres deep m3 19

G Extra-over for excavating in rock m3 45

H Remove surplus excavated material from site m3 317

I Backfill around foundation m3 133

Filing

300 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
J concrete surface bed (measured separately) m3 22

K Treat hardcore surface with approved insecticide m2 73

Sub-Total to Collection

Berkad - 142/223
UNDERGROUND WATER STORAGE RESERVOIR / BERKAD

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)

Concrete work

Mass Concrete class 15 (1:3:6) with 20mm thick


maximum aggregate size in

A 50mm blinding layer under foundations m2 30

B 50mm blinding layer on hardcore surfaces m2 73

Walling

400mm Thick rubble stone foundation walling in cement


C and sand mortar (1:3) m2 46

Vibrated Reinforced Concrete class 25 (1:1.5:3) with


20mm thick maximum aggregate size in

D Strip foundation m3 6

E 150mm Thick floor slab m2 81

F Ring beam m3 7

Reinforcement

Mesh fabric reinforcement ref. No. A142 laid in floor slab


G with minimum 150 mm side allowance m2 114

H Reinforcement bars (all sizes) as shown on drawings kg 1,565

Sawn formwork

Formwork to edges of strip footing girth over 225mm but


I not exceeding 300mm m 76

Formwork to edges of slab over 75mm girth but not


J exceeding 150mm m 40

K Formwork to sides and soffits of beam m2 76

Berkad - 143/223
UNDERGROUND WATER STORAGE RESERVOIR / BERKAD

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
Sub-Total to Collection

Walling

400mm Thick rubble walling in cement and sand mortar


A (1:3) m2 110

Finishes

Cement and sand mortar (1:3) plaster in:

20 mm Thick plaster mixed with Sika or equivalent water


B proofing admixture m2 131

C 25 mm Thick screed to base slab with waterproof cement m2 73

D 200mm wide PVC water bar m 38

Roof Structure

Sawn celcured cypress timber as described in:

E 200mm x 25mm Ridge Board m 13

F 100mm x 50mm wall plate m 38

G 75 x 50 Purlins m 107

STRUCTURAL TIMBER

Supply and fix seasoned timber including timber joint


connection accessories; galvanized steel cleats and
gusset plates, bolts including boring holes and fixing
tight; and all other accessories necessary

H 50x100mm kingpost m 4

I 50x75mm ties and struts m 40

J 50x150mm rafter m 44

K 50x150mm tie beam m 43

Berkad - 144/223
UNDERGROUND WATER STORAGE RESERVOIR / BERKAD

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
Sub-Total to Collection

Roof Covering

30 Gauge galvanized corrugated iron sheets fixed to


A timber Purlins m2 98

B Ridge plate m 13

Staircase

C Compacted hardcore filling under stairs m3 4

D 50mm murram blinding to surfaces of hardcore m2 5

300mm wide masonry riser in cement and sand mortar


E (1:3) m 15

300mm wide masonry tread in cement and sand mortar


F (1:3) m 15

G Masonry open string in cement and sand mortar (1:3) m2 1

H Masonry waist in cement and sand mortar (1:3) m2 5

20-50mm gravel packed with lean sand cement mortar


I and not vibrated at all m2 10

J 400mm wide precast concrete inlet channel m 6

K 400 x 300mm stainless steel mesh to retain rubbish No. 1

L 400mm wide precast concrete overflow channel m 5

100mm PVC inlet pipes cast into 400mm thick rubble


M stone wall No 4

Abstraction pad

Excavation (Provisional)

Excavation including maintaining and supporting sides


and keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
N spoil m2 7

Berkad - 145/223
UNDERGROUND WATER STORAGE RESERVOIR / BERKAD

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)
Sub-Total to Collection

Pit excavation commencing at reduced levels depth


A exceeding 0.4 m but not exceeding 1.50m deep m3 10

B Ditto 1.50 - 3.00 metres deep m3 10

C Remove surplus excavated material from site m3 10

D Backfill around foundation m3 10

Walling

400mm Thick rubble walling in cement and sand mortar


E (1:3) m2 20

Concrete Work

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

F Ring beam m3 0.6

G 100mm thick cover slab m2 4

Reinforcement

H 8mm Diameter high tensile reinforcement bar kg 20

I Ditto but 12mm kg 35

Sawn Formwork

J Formwork to sides and soffits of beam m2 11

K Formwork to sides of cover slab girth 75-150mm m 11

L Formwork to soffits of cover slab m2 7

Finishes

Cement and sand mortar (1:3) plaster in:

M 20 mm Thick internal plaster m2 17

600x600x6mm heavy gauge steel primed metal manhole


N cover on slab with and including metal framing all around No 1

Berkad - 146/223
UNDERGROUND WATER STORAGE RESERVOIR / BERKAD

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)

Sub-Total to Collection

Soak pit

Excavation (Provisional)

Excavation including maintaining and supporting sides


and keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 8

Pit excavation commencing at reduced levels depth not


B exceeding 1.50m deep m3 10

C Ditto 1.50 - 3.00 metres deep m3 1

D Remove surplus excavated material from site m3 7

E Backfill around foundation m3 4

Concrete work

Mass Concrete class 15 (1:3:6) with 20mm thick


maximum aggregate size in

F 100mm blinding layer under walling m2 8

Walling

400mm Thick rubble walling in cement and sand mortar


G (1:3) m2 8

H Rubble stone fill m3 4

Concrete Work

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

I 100mm thick cover slab m2 5

Berkad - 147/223
UNDERGROUND WATER STORAGE RESERVOIR / BERKAD

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)

Sub-Total to Collection

Reinforcement

Mesh fabric reinforcement ref. No. A142 laid in slab with


A minimum 150 mm side allowance m2 5

Sawn formwork

Formwork to edges of slab over 75mm girth but not


B exceeding 150mm m 9

C Formwork to soffits of cover slab m2 5

D 6mm thick grating plate No. 1

Silt trap

Excavation (Provisional)

Excavation including maintaining and supporting sides


and keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
E spoil m2 7

Pit excavation commencing at reduced levels depth


F exceeding 0.4 m but not exceeding 1.50m deep m3 10

G Ditto 1.50 - 3.00 metres deep m3 4

H Remove surplus excavated material from site m3 10

I Backfill around foundation m3 2

Concrete work

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

J 150mm thick cover slab m2 5

Berkad - 148/223
UNDERGROUND WATER STORAGE RESERVOIR / BERKAD

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)

Sub-Total to Collection

Reinforcement

Mesh fabric reinforcement ref. No. A142 laid in floor slab


A with minimum 150 mm side allowance m2 4

Sawn formwork

Formwork to edges of slab over 75mm girth but not


B exceeding 150mm m 6

Walling

300mm Thick rubble walling in cement and sand mortar


C (1:3) m2 19

Finishes

Cement and sand mortar (1:3) plaster in:

D 20 mm Thick internal plaster m2 19

Sub-Total to Collection

COLLECTION

Sub-Total from page 1

Sub-Total from page 2

Sub-Total from page 3

Sub-Total from page 4

Sub-Total from page 5

Sub-Total from page 6

Sub-Total from page 7

Sub-Total from above

Berkad - 149/223
UNDERGROUND WATER STORAGE RESERVOIR / BERKAD

RATE
ITEM DESCRIPTION UNIT QUANTITY (USD)

TOTAL COST OF UNDERGROUND STORAGE TANK/


BERKAD

Berkad - 150/223
AMOUNT
(USD)

Berkad - 151/223
AMOUNT
(USD)

Berkad - 152/223
AMOUNT
(USD)
-

Berkad - 153/223
AMOUNT
(USD)
-

Berkad - 154/223
AMOUNT
(USD)
-

Berkad - 155/223
AMOUNT
(USD)

Berkad - 156/223
AMOUNT
(USD)

Berkad - 157/223
AMOUNT
(USD)

Berkad - 158/223
AMOUNT
(USD)

Berkad - 159/223
ANIMAL TROUGHS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

WATER TROUGH FOR CATTLE/DONKEYS

Excavation (Provisional)

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 56.1 -

Excavate for foundation strip commencing at stripped


B levels depth not exceeding 1.50m deep m3 5.6 -

C Extra-over for excavating in rock m3 1.0 -

D Remove surplus excavated material from site m3 9.0 -

E Backfill around foundation m3 3.4 -

Filing

200 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
F concrete surface bed m2 53.9 -

G Treat hardcore surface with approved insecticide m2 53.9 -

Concrete work

Mass Concrete class 15 (1:3:6) with 20mm thick maximum


aggregate size in

H 50mm blinding layer under foundations m2 9.3 -

I 50mm blinding layer on hardcore surfaces m2 53.9 -

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

J Strip foundation m3 1.9 -

75mm thick concrete benching laid to falls and with surface


K steel trowelled rough (Optional) m2 47.0 -

L 100 mm thick floor slab m2 6.9 -

Animal Troughs - 160/223


ANIMAL TROUGHS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Sub-Total to Collection -

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

A 150mm thick walls m2 14.0 -

Reinforcement

Mesh fabric reinforcement ref. No. A142 laid in floor slab


B with minimum 150 mm side allowance m2 66.6 -

C Reinforcement bars (All sizes) as shown on drawings kg 210.0 -

Sawn formwork

D Formwork to sides of foundation strip girth 150-225mm m 31.0 -

E Formwork to edges of floor slab girth not exceeding 75mm m 52.1 -

F Formwork to sides of walls m2 39.4 -

Walling

G 150 Thick solid concrete block walling m2 4.4 -

Finishes

Cement and sand mortar (1:3) in:

25 mm Thick paving to floor with water proof cement


H (Optional) m2 6.0 -

15mm thick plaster to internal side of wall with water proof


I cement m2 17.3 -

J 12mm thick plaster to external side of wall (Optional) m2 6.0 -

25 mm Thick screed with approved hardener to floor steel


K trowelled rough (Optional) m2 55.0 -

Animal Troughs - 161/223


ANIMAL TROUGHS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Sub-Total to Collection -

Water Supply System

Galvanized mild steel pipes class "B" medium thickness


with and including jointing fittings and fixed as described

25mm diameter inlet pipe chased through masonry wall


A 300 mm long with and including stop cork No 4.0 -

B 25mm diameter inlet pipe No 2.0 -

32mm diameter PVC draw off pipe 300mm long with and
C including gate valve No 1.0 -

Sub-Total to Collection -

COLLECTION

Sub-Total from page 1 -

Sub-Total from page 2 -

Sub-Total from above -

Animal Troughs - 162/223


ANIMAL TROUGHS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

TOTAL COST OF CATTLE/DONKEYS

WATER TROUGH FOR CAMELS

Excavation (Provisional)

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 58.6 -

Excavate for foundation strip commencing at stripped


B levels depth not exceeding 1.50m deep m3 5.9 -

C Extra-over for excavating in rock m3 1.0 -

D Remove surplus excavated material from site m3 17.0 -

E Backfill around foundation m3 11.1 -

Filing

200 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
F concrete surface bed m2 54.1 -

G Treat hardcore surface with approved insecticide m2 54.1 -

Concrete work

Mass Concrete class 15 (1:3:6) with 20mm thick maximum


aggregate size in

H 50mm blinding layer under foundations m2 9.8 -

I 50mm blinding layer on hardcore surfaces m2 54.1 -

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

J Strip foundation m3 2.0 -

75mm thick concrete benching laid to falls and with surface


K steel trowelled rough (optional) m2 48.6 -

L 100 mm thick floor slab m2 6.9 -

Animal Troughs - 163/223


ANIMAL TROUGHS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Sub-Total to Collection -

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

A 200mm thick walls m2 26.1 -

B 150mm thick wall m2 0.7 -

Reinforcement

Mesh fabric reinforcement ref. No. A142 laid in floor slab


C with minimum 150 mm side allowance m2 68.4 -

D Reinforcement bars (All sizes) as shown on drawings kg 280.0 -

Sawn formwork

E Formwork to sides of foundation strip girth 150-225mm m 31.0 -

F Formwork to edges of floor slab girth not exceeding 75mm m 32.3 -

G Formwork to sides of walls m2 47.4 -

Finishes

Cement and sand mortar (1:3) in:

25 mm Thick paving to floor with water proof cement


H (Optional) m2 6.7 -

15mm thick plaster to internal side of wall with water proof


I cement m2 10.0 -

J 12mm thick plaster to external side of wall m2 17.1 -

25 mm Thick screed with approved hardener to floor steel


K trowelled rough (Optional) m2 6.7 -

Sub-Total to Collection -

COLLECTION

Sub-Total from page 4 -

Sub-Total from above -

Animal Troughs - 164/223


ANIMAL TROUGHS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

TOTAL COST OF CAMEL TROUGH -

WATER TROUGH FOR SHEEP/GOATS

Excavation (Provisional)

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 56.0 -

Excavate for foundation strip commencing at stripped


B levels depth not exceeding 1.50m deep m3 5.6 -

C Extra-over for excavating in rock m3 1.0 -

D Remove surplus excavated material from site m3 9.0 -

E Backfill around foundation m3 3.4 -

Filing

200 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
F concrete surface bed m2 38.0 -

G Treat hardcore surface with approved insecticide m2 38.0 -

Concrete work

Mass Concrete class 15 (1:3:6) with 20mm thick maximum


aggregate size in

H 50mm blinding layer under foundations m2 9.3 -

I 50mm blinding layer on hardcore surfaces m2 56.1 -

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

J Strip foundation m3 1.9 -

75mm thick concrete benching laid to falls and with surface


K steel trowelled rough (Optional) m2 47.0 -

Animal Troughs - 165/223


ANIMAL TROUGHS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
L 100 mm thick floor slab m2 6.9 -

Sub-Total to Collection -

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

A 150mm thick walls m2 9.3 -

Reinforcement

Mesh fabric reinforcement ref. No. A142 laid in floor slab


B with minimum 150 mm side allowance m2 67.0 -

C Reinforcement bars (All sizes) as shown on drawings kg 210.0 -

Sawn formwork

D Formwork to sides of foundation strip girth 150-225mm m 31.0 -

E Formwork to edges of floor slab girth not exceeding 75mm m 31.0 -

F Formwork to sides of walls m2 39.4 -

Walling

G 150 Thick solid concrete block walling m2 3.0 -

Finishes

Cement and sand mortar (1:3) in:

25 mm Thick paving to floor with water proof cement


H (Optional) m2 6.9 -

15mm thick plaster to internal side of wall with water proof


I cement m2 5.1 -

J 12mm thick plaster to external side of wall (Optional) m2 4.7 -

25 mm Thick screed with approved hardener to floor steel


K trowelled rough (Optional) m2 6.9 -

Animal Troughs - 166/223


ANIMAL TROUGHS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Sub-Total to Collection -

Water Supply System

Galvanized mild steel pipes class "B" medium thickness


with and including jointing fittings and fixed as described

25mm diameter inlet pipe chased through masonry wall


A 300 mm long with and including stop cork No 4.0 -

B 25mm diameter inlet pipe No 2.0 -

32mm diameter PVC draw off pipe 300mm long with and
C including gate valve No 1.0 -

Sub-Total to Collection -

COLLECTION

Sub-Total from page 6 -

Sub-Total from page 7 -

Sub-Total from above -

Animal Troughs - 167/223


ANIMAL TROUGHS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

TOTAL COST OF SHEEP/GOATS TROUGH -

Animal Troughs - 168/223


WATER KIOSK

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

SUBSTRUCTURE (Provisional)

Excavation

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 200 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 18.9 -

Excavate for foundation strip commencing at stripped


B levels depth not exceeding 1.50m deep m3 9.7 -

C Extra-over for excavation in rock m3 3.0 -

D Remove surplus excavated material from site m3 9.0 -

E Backfill around foundation m3 0.7 -

Filing

300 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
F concrete surface bed m3 3.6 -

Insitu concrete: class 15: mix 1:3:6

G 50mm blinding layer under foundations m2 12.4 -

H 50mm blinding layer on hardcore surfaces m2 12.2 -

I Treat hardcore surface with approved insecticide m2 12.2 -

Concrete work

Reinforced Concrete class 25

J Strip foundation m3 2.3 -

K 100mm thick floor slab with surface steel trowelled smooth m2 7.5 -

L 100mm thick sloping ramp m2 4.2 -

M 200 mm thick plinth m2 1.2 -

Total page 1 to Substructures Collection -

Water Kiosk - 169/223


WATER KIOSK

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Reinforcement

A Reinforcement bars (all sizes) as shown on the drawings kg 50.0 -

Mesh fabric reinforcement ref. No. A142 laid in floor slab


B with minimum 150 mm side allowance m2 21.4 -

Sawn formwork

Formwork to sides of foundation strip girth over 75mm but


C not exceeding 150mm m 19.6 -

Formwork to sides of plinth girth over 150mm but not


D exceeding 225mm m 3.8 -

Formwork to edges of floor slab girth over 75mm but not


E exceeding 150mm m 14.8 -

Walling

150mm Thick masonry foundation walling in cement and


F sand mortar (1:3) m2 4.2 -

400mm Thick masonry foundation walling in cement and


F sand mortar (1:3) m2 7.3 -
-
One layer 1000gauge polythene sheet damp proof
G membrane under beds: 300mm laps m2 20.1 -

H 200mm wide Bituminous felt damp-proof course m 12.2 -

Supply and fix 600x600x50mm thick medium duty precast


I concrete paving slabs in cement sand mortar m2 1.6 -

Plinths

J 15mm thick cement sand rendering (1:3) to plinths m2 2.0 -

Prepare and apply three coats black bituminous paint to


K rendered plinths externally m2 2.0 -

Total page 2 to Substructures Collection -

Total from page 1 -

Total from page 2 -

SUBSTRUCTURES SUB TOTAL TO SUMMARY -

Water Kiosk - 170/223


WATER KIOSK

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

SUPERSTRUCTURES

Walling

A 150 Thick load bearing solid concrete block walling m2 26.9 -

B 200mm x 200mm ventilation block No 2.0 -

Concrete Work

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

C Lintel m3 0.4 -

D Reinforcement

E 8mm Diameter high tensile reinforcement bar kg 13.0 -

F Ditto but 10mm kg 15.0 -

Sawn Formwork

G Formwork to sides and soffits of ring beam m2 1.8 -

Roofing

Roof Structure

Sawn celcured cypress timber as described in:

H 200mm x 25mm Fascia Board m 15.0 -

I l00x50mmRafters m 11.7 -

J 100mm x 50mm wall plate m 7.8 -

K 50 x 50 Purlins m 15.6 -

Roof Covering

30 Gauge galvanized corrugated iron sheets fixed to


L timber Purlins m2 15.2 -

Painting and Decorating

Knot prime stop and apply two undercoats and one gloss
M finishing coat oil paint to fascia board 200- 300 mm wide m 15.0 -

Water Kiosk - 171/223


WATER KIOSK

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Total page 3 to Superstructures Collection -

Doors and Windows

Purpose-made steel casement single door made of 15mm


thick steel plate welded to the frame, 38x38x3mm thick
steel angles for door main frame, 20x20x1.5mm RHS
welded to steel plate by 200mm long fillet welds at 200mm,
hedges and 8mm diameter steel bars embedded in the
wall with mortar and welded onto the door frame for
anchoring the door complete with all the necessary
A ironmongery overall size 1000 x 2100mm high No 1.0 -

Purpose-made steel casement window made of 15mm


thick steel plate welded to the frame, 38x38x3mm thick
steel angles for window main frame, 20x20x1.5mm RHS
welded to steel plate by 200mm long fillet welds at 200mm,
hedges and 8mm diameter steel bars embedded in the
wall with mortar and welded onto the window frame for
anchoring the window complete with all the necessary
B ironmongery overall size 950 x 1100mm high No 1.0 -
-
Precast concrete window cill size 260 x 50mm Thick sunk -
weathered and throated and bedded and jointed in cement
C sand mortar m 1.0 -

Prepare and apply two undercoats and one finishing coat


D oil paint to steel door m2 4.0 -

E Ditto windows m2 2.0 -

Total page 4 to Superstructures Collection -

Water Kiosk - 172/223


WATER KIOSK

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Finishes

Floor Finishes

Cement and sand mortar (1:3) in:

A 30mm thick steel trowelled screed m2 14.9 -

100 x 25mm Thick skirting to junction with floor and wall


B finish m 11.0 -

Wall Finishes

Cement and sand mortar (1:3) rendering in:

13 mm Thick mortar rendering with steel float finish to


C masonry wall m2 30.0 -

12mm lime plaster: steel trowelled finish: on concrete,


block work or stonework: to

D Walls and beams m2 30.0 -

Prepare and apply three coats plastic emulsion paint to:

E Rendered surfaces m2 30.0 -

F Plastered surfaces m2 30.0 -

1200mm long x 500mm wide timber built in table with 2No.


G Lockable drawers on 50x50mm timber support No 1.0 -

Total page 5 to Superstructures Collection -

Water Kiosk - 173/223


WATER KIOSK

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Soak pit

Excavation (Provisional)

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 3.0 -

Pit excavation commencing at reduced levels depth not


B exceeding 1.50m deep m3 1.5 -

C Ditto 1.50 - 3.00 metres deep m3 0.2 -

D Remove surplus excavated material from site m3 2.0 -

E Backfill around foundation m3 0.4 -

F Rubble stone fill m3 2.0 -

Concrete Work

Vibrated reinforced concrete class 15 (1:3:6) with 20mm


maximum aggregate as described in:

G 300mm thick cover slab m3 1.0 -

Reinforcement

Mesh fabric reinforcement ref. No. A142 laid in slab with


H minimum 150 mm side allowance m2 3.0 -

Sawn formwork

Formwork to edges of slab over 225mm girth but not


I exceeding 300mm m 6.4 -

J Formwork to soffits of cover slab m2 3.0 -

Total page 6 to Superstructures Collection -

Water Kiosk - 174/223


WATER KIOSK

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Catch pit

Excavation (Provisional)

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 0.4 -

Pit excavation commencing at reduced levels depth not


B exceeding 1.50m deep m3 0.3 -

C Remove surplus excavated material from site m3 1.0 -

D Backfill around foundation m3 0.7 -

Concrete Work

Vibrated reinforced concrete class 15 (1:3:6) with 20mm


maximum aggregate as described in:

E 100mm thick base slab m3 0.1 -

F 50mm thick walls m2 2.2 -

Reinforcement

G High tensile reinforcement bars in assorted sizes kg 15.0 -

Sawn formwork

Formwork to edges of slab over 75mm girth but not


H exceeding 150mm m 2.4 -

I Formwork to sides of walls m2 4.3 -

Mild steel cover comprising of Y16 bars welded to


J 25x25x6mm steel angles at 50mm centres No 1.0 -

Water Kiosk - 175/223


WATER KIOSK

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Total page 7 to Superstructure Collection -

SUPERSTRUCTURE COLLECTION

Total from page 3 -

Total from page 4 -

Total from page 5 -

Total from page 6 -

Total from page 7 -

SUPERSTRUCTURE SUB TOTAL TO SUMMARY -

WATER KIOSK

SUMMARY

(1) SUBSTRUCTURE -

(2) SUPERSTUCTURE -

Water Kiosk - 176/223


WATER KIOSK

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
TOTAL COST OF WATER KIOSK -

Water Kiosk - 177/223


COMMUNAL WATER POINT

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Yard

Excavation (Provisional)

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 200 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 33.1 -
-
Excavate to reduce levels not exceeding 1.50m deep
B average depth 300mm m2 33.1 -
-
Filing -
-
300 mm thick approved hardcore filling spread, well
rammed and compacted in 150mm layers to receive
C concrete surface bed m3 9.9 -
-
Insitu concrete: class 15: mix 1:3:6 -
-
D 50mm blinding layer on hardcore surfaces m2 33.1 -
-
E Treat hardcore surface with approved insecticide m2 33.1 -
-
Concrete work -
-
Reinforced Concrete class 25 -
-
F 75mm thick floor slab with surface steel trowelled smooth m2 26.0 -
-
G 200mm thick floor slab with surface steel trowelled smooth m2 7.2 -
-
H 200mm walls m2 1.4 -
-
I 200x50mm thicknessing under 200mm slab m 4.0 -
-
Reinforcement -
-
J Reinforcent bars (all sizes) as shown on drawings kg 20.0 -
-
Mesh fabric reinforcement ref. No. A142 laid in floor slab
K with minimum 150 mm side allowance m2 36.5 -

Total page 1 Yard Collection -

Communal water point - 178/223


COMMUNAL WATER POINT

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Sawn formwork

A Formwork to edges of floor slab girth not exceeding 75mm m 26.0 -


-
B Formwork to sides of walls m2 3.2 -
-
C 100 x 100mm open drain channel m 14.7 -
-
Finishes -
-
Floor Finishes -
-
Cement and sand mortar (1:3) in: -
-
D 30mm thick steel trowelled screed m2 33.1 -
-
Fence -
-
1,800mm high chainlink complete with 60.3mm diameter x
4mm thick cranked CHS posts at 1,800mm centres
E morticed in mass concrete sorround m 18.0 -
-
1,800mm high x 2,100mm wide mild steel double gate
inluding all the necessary ironmongery and 3 coats of paint
F (Optional) No 1.0 -
-
Gate valve chamber -
-
Excavation -
-
Excavation including maintaining and supporting sides and
keeping free from water, mud and fallen materials by
bailing, pumping or otherwise -
-
Pit excavation commencing at reduced levels depth not
G exceeding 1.50m deep m3 1.0 -
-
H Remove surplus excavated material from site m3 0.5 -
-
I Backfill around foundation m 3
0.5 -

Total page 2 to Yard Collection -

Communal water point - 179/223


COMMUNAL WATER POINT

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Concrete work

Mass Concrete class 20 with 20mm thick maximum


aggregate size in

A 50mm Thick m2 1.0 -


-
Walling -
-
B 150 Thick load bearing solid concrete block walling m2 2.0 -
-
Finishes -
-
Cement and sand mortar (1:3) rendering in: -
-
C 15mm internal plaster to walls m2 1.2 -
-
D 400 x 400mm precast concrete cover No 1.0 -
-
Water Supply System -
-
Galvanized Mild Steel pipes class "B" medium thickness
with and including jointing, fittings and fixe as described -
-
E 38mm diameter inlet pipe m 9.0 -
-
F 38mm diameter brass gate valve with wheel and head No 2.0 -

Total page 3 to Yard Collection -

YARD COLLECTION

Total from page 1 -

Total from page 2 -

Total from above -

YARD SUB TOTAL TO SUMMARY -

Communal water point - 180/223


COMMUNAL WATER POINT

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Attendant's room (All Provisional)

SUBSTRUCTURE (Provisional)

Excavation

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 200 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 4.0 -
-
Excavate to reduce levels not exceeding 1.50m deep
B average depth 300mm m2 4.0 -
-
Excavate for foundation strip commencing at reduced
C levels depth not exceeding 1.50m deep m3 7.2 -
-
D Extra-over for excavation in rock m3 1.0 -
-
E Remove surplus excavated material from site m3 5.0 -
-
F Backfill around foundation m3 8.0 -
-
Filing -
-
300 mm thick approved hardcore filling spread, well
rammed and compacted in 150mm layers to receive
G concrete surface bed m3 1.0 -
-
Insitu concrete: class 15: mix 1:3:6 -
-
H 50mm blinding layer under foundations m2 4.8 -
-
I 50mm blinding layer on hardcore surfaces m2 3.1 -
-
J Treat hardcore surface with approved insecticide m2 3.1 -
-
Concrete work -
-
Reinforced Concrete class 25 -
-
K Strip foundation m3 1.0 -
-
L 100mm thick floor slab with surface steel trowelled smooth m2 4.0 -

Total page 4 to Substructures Collection -

Communal water point - 181/223


COMMUNAL WATER POINT

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Reinforcement

A Reinforcement bars (all sizes) as shown on drawings kg 30.0 -


-
Mesh fabric reinforcement ref. No. A142 laid in floor slab
B with minimum 150 mm side allowance m2 5.3 -
-
Sawn formwork -
-
Formwork to edges of floor slab girth over 75mm but not
C exceeding 150mm m 8.0 -
-
Formwork to edges of strip foundation girth over 150mm
D but not exceeding 225mm m 14.0 -
-
Walling -
-
300mm Thick rubble stone foundation walling in cement
E and sand mortar (1:3) m2 9.0 -
-
One layer 1000gauge polythene sheet damp proof
F membrane under beds: 300mm laps m2 5.9 -
-
G 200mm wide Bituminous felt damp-proof course m 8.0 -
-
Plinths -
-
H 15mm thick cement sand rendering (1:3) to plinths m2 2.0 -
-
Prepare and apply three coats black bituminous paint to
I rendered plinths externally m2 2.0 -

Total page 5 to Substructures Collection -

SUBSTRUCTURES COLLECTION

Total from page 4 -

Total from above -

SUBSTRUCTURES SUB TOTAL TO ATTENDANTS


ROOM COLLECTION -

Communal water point - 182/223


COMMUNAL WATER POINT

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

SUPERSTRUCTURES

Walling

A 200 Thick load bearing solid concrete block walling m2 13.0 -


-
Concrete Work -
-
Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm
maximum aggregate as described in: -
-
B 100mm Thick suspended seat /bench m2 2.0 -
-
Reinforcement -
-
C Reinforcement bars (all sizes) as shown on drawings kg 40.0 -
-
Mesh fabric reinforcement ref. No. A142 laid in floor slab
E with minimum 150 mm side allowance m2 5.3 -
-
Sawn Formwork to: -
-
F Sides and soffits of concrete seat m2 2.0 -
-
Roofing -
-
Roof Structure -
-
Sawn celcured cypress timber as described in: -
-
G 200mm x 25mm Fascia Board m 11.0 -
-
H l00x50mmRafters m 6.0 -
-
I 100mm x 50mm wall plate m 7.4 -
-
J 50 x 50 Purlins m 7.0 -
-
Roof Covering -
-
30 Gauge galvanized corrugated iron sheets fixed to
K timber Purlins m2 7.6 -
-
Painting and Decorating -
-
Knot prime stop and apply two undercoats and one gloss
L finishing coat oil paint to fascia board 200- 300 mm wide m 11.0 -

Communal water point - 183/223


COMMUNAL WATER POINT

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Total page 6 to Superstructures Collection -

Doors and Windows

45mm thick solid flush single door, overall size 900x


A 2100mm high No 1.0 -
-
Wrot cypress 1st grade -
150x50mm frame two labours plugged screwed and -
B pellated m 5.0 -
-
C 50x25mm architrave two labours m 5.0 -
-
D 25x15mm quadrant one labour m 5.0 -
-
Supply and fix the following ironmongery to timber with
matching screws -
-
E Stainless steel hinges Pairs 2.0 -
-
F Three lever mortice lock No 1.0 -
-
G Two lever mortice lock No 1.0 -
-
H Rubber door stop No 1.0 -

Communal water point - 184/223


COMMUNAL WATER POINT

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Total page 7 to Superstructures Collection -

WINDOWS

Supply and Fix the following purpose made steel Lourved


windows manufactured from heavy duty standard sections
primed with one coat of red oxide primer and fixing to
masonry or concrete head and jambs complete with
closing mechanism and other fittings.
A Window overall size 1100x900mm high No 1.0 -
-
B Window overall size 1100x500mm high No 1.0 -
-
5mm thick clear sheet glass bedded in mastic -
-
C In panes of various sizes m2 2.0 -
-
Purpose made mild steel burglar proofing to windows;
10mm square section steel bars smooth welded together
at 75mm centres both ways fixed with lugs built into walls;
one coat shop primer -
-
D Grille overall size 1000x900mm high No 2.0 -
-
Precast concrete window cill size 260 x 50mm Thick sunk -
weathered and throated and bedded and jointed in cement
E sand mortar m 1.0 -
-
Prepare and apply two undercoats and one finishing coat
F oil paint to timber door m2 4.0 -
-
G Ditto windows m2 3.0 -

Total page 8 to Superstructures Collection -

Communal water point - 185/223


COMMUNAL WATER POINT

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Finishes

Floor Finishes

Cement and sand mortar (1:3) in:

A 30mm thick steel trowelled screed m2 3.0 -


-
100 x 25mm Thick skirting to junction with floor and wall
B finish m 7.0 -
-
Wall Finishes -
-
Cement and sand mortar (1:3) rendering in: -
-
12 mm Thick mortar rendering with steel float finish to
C masonry and concrete surfaces m2 16.0 -
-
12mm lime plaster: steel trowelled finish: on concrete,
blockwork or stonework: to -
-
D Walls m2 13.0 -
-
E Concrete seat m2 1.0 -
-
Prepare and apply three coats plastic emulsion paint to: -
-
F Rendered surfaces m2 16.0 -
-
G Plastered surfaces m2 13.0 -
-
H Water meter box complete with water meter No. 1.0 -

Communal water point - 186/223


COMMUNAL WATER POINT

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Total page 9 to Superstructure Collection -

SUPERSTRUCTURE COLLECTION

Total from page 6 -

Total from page 7 -

Total from page 8 -

Total from page 9 -

SUPERSTRUCTURES SUB TOTAL TO ATTENDANTS


ROOM COLLECTION -

ATTENDANTS ROOM COLLECTION

(1) SUBSTRUCTURE -

(2) SUPERSTUCTURE -

ATTENDANTS ROOM SUB TOTAL TO SUMMARY -

COMMUNAL WATER POINT

SUMMARY

(1) YARD -

(2) ATTENDANTS ROOM -

TOTAL COST OF COMMUNAL WATER POINT -

Communal water point - 187/223


ELEVATED STEEL STORAGE TANKS

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY (USD) (USD)

100M3 ELEVATED STEEL STORAGE TANKS

Excavation

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 31 -

Pit excavation commencing at reduced levels depth not


B exceeding 1.50m deep m3 80 -

C Extra-over for excavation in soft rock m3 4 -

D Extra-over for excavation in hard rock m3 4 -

E Remove surplus excavated material from site m3 29 -

F Backfill around foundation m3 51 -

Concrete work

Mass Concrete class 15 (1:3:6) with 20mm thick maximum


aggregate size in

G 50mm Thick blinding m2 16 -

Vibrated Reinforced Concrete class 25 (1:1.5:3) with


20mm thick maximum aggregate size in

H Column base m3 19 -

Reinforcement

I Reinforcement bars (all sizes) as shown on drawings kg 1,160 -

Sawn formwork

J Formwork to sides of column bases m2 38 -

Sub-Total to Collection -

Elevated Steel Tank - 188/223


ELEVATED STEEL STORAGE TANKS

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY (USD) (USD)

Tank

Supply and Install complete with Tower a Pressed steel


tank size 6.1m long x 6.1m wide x 3.66mm high including
10m high tower made up of 75mm x 75mm x 6mm RSA,
150mm x 150mm x 6mm thick SHS columns, 100mm x
100mm x 8mm RSA horizontal ties , 125mm x 125mm x
8mm RSA diagonal bracings, 406 x 178 x 58 kg/m UB and
25 leveling pad grouting to 4 No. SHS columns, mild steel
handrail, chequered plate on 600mm wide walkway around
A tank and cat ladder No 1 -

Allow for all the requisite pipe work including inlet, outlet
B and washout pipework to the foot of the tank tower LS 1 -

Sub-Total to Collection -

COLLECTION

Sub-Total from page 1 -

Sub-Total from above -

TOTAL COST OF 100M3 ELEVATED STEEL STORAGE TANKS -

Elevated Steel Tank - 189/223


ELEVATED STEEL STORAGE TANKS

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY (USD) (USD)

150M3 ELEVATED STEEL STORAGE TANKS

Excavation

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 71 -

Pit excavation commencing at reduced levels depth not


B exceeding 1.50m deep m3 77 -

C Extra-over for excavation in soft rock m3 4 -

D Extra-over for excavation in hard rock m3 4 -

E Remove surplus excavated material from site m3 31 -

F Backfill around foundation m3 46 -

Concrete work

Mass Concrete class 15 (1:3:6) with 20mm thick maximum


aggregate size in

G 50mm Thick blinding m2 16 -

Vibrated Reinforced Concrete class 25 (1:1.5:3) with


20mm thick maximum aggregate size in

H Column base m3 19 -

Reinforcement

I Reinforcement bars (all sizes) as shown on drawings kg 1,160 -

Sawn formwork

J Formwork to sides of column bases m2 38 -

Sub-Total to Collection -

Elevated Steel Tank - 190/223


ELEVATED STEEL STORAGE TANKS

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY (USD) (USD)

Tank

Pressed steel tank size 7.32m long x 7.32m wide x


3.66mm high including 10m high tower made up of 75mm
x 75mm x 6mm RSA, 150mm x 150mm x 6mm thick SHS
columns, 100mm x 100mm x 8mm RSA horizontal ties ,
125mm x 125mm x 8mm RSA diagonal bracings, 406 x
178 x 58 kg/m UB and 25 leveling pad grouting to 4 No.
SHS columns, mild steel handrail, chequered plate on
A 600mm wide walkway around tank and cat ladder No 1 -

Allow for all the requisite pipe work including inlet, outlet
B and washout pipework to the foot of the tank tower LS 1 -

Sub-Total to Collection -

COLLECTION

Sub-Total from page 3 -

Sub-Total from above -

TOTAL COST OF 150M3 ELEVATED STEEL STORAGE TANKS -

Elevated Steel Tank - 191/223


TRIPLE PIT LATRINE FOR IDP CAMPS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

SUBSTRUCTURE (Provisional)

Excavation

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 200 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 15 -

Pit excavation commencing at stripped levels depth not


B exceeding 1.50m deep m3 20 -

C Ditto 1.50 - 3.00 metres deep m3 12 -

D Extra-over for excavation in rock m3 2 -

E Remove surplus excavated material from site m3 15 -

F Backfill around foundation m3 19 -

Concrete work

Insitu concrete: class 15: mix 1:3:6

G 50mm blinding layer under foundations m2 5 -

Reinforced Concrete class 25

H 100mm thick floor slab with surface steel trowelled smooth m2 8 -

I Allow for pit/squat hole in 100mm thick floor slab No 3 -

Reinforcement

J Reinforcement bars (All sizes) as shown on drawings kg 40 -

Mesh fabric reinforcement ref. No. A142 laid in floor slab


K with minimum 150 mm side allowance m2 8 -

Sawn formwork

Formwork to edges of floor slab girth over 75mm but not


L exceeding 150mm m 19 -

Total page 1 to Substructures Collection -

Pit latrine for IDP camp - 192/223


TRIPLE PIT LATRINE FOR IDP CAMPS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Walling

400mm Thick rubble stone retaining wall in cement and


A sand mortar (1:3) m2 18 -

One layer 1000gauge polythene sheet damp proof


B membrane under beds: 300mm laps m2 8 -

C 200mm wide Bituminous felt damp-proof course m 12 -

Plinths

D 15mm thick cement sand rendering (1:3) to plinths m2 5 -

Prepare and apply three coats black bituminous paint to


E rendered plinths externally m2 5 -

100mm thick approved concrete lining of pit insides up to


bottom of pit if in loose formation areas or in areas with
F ground water (Optional) m2 26 -

Total page 2 to Substructures Collection -

SUBSTRUCTURES COLLECTION

Total from page 1 -

Total from above -

Pit latrine for IDP camp - 193/223


TRIPLE PIT LATRINE FOR IDP CAMPS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
SUBSTRUCTURES SUB TOTAL TO SUMMARY -

SUPERSTRUCTURES

Walling

A 150 Thick load bearing solid concrete block walling m2 26 -

B 200mm deep x 400mm wide vent block No 3 -

Concrete Work

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

C Lintels m3 0.06 -

Reinforcement

D 8mm Diameter high tensile reinforcement bar kg 3 -

E Ditto but 10mm kg 9 -

Sawn Formwork to:

F Sides and soffits of lintels m2 1 -

Roofing

Roof Structure

Sawn celcured cypress timber as described in:

G 200mm x 15mm Fascia Board m 24 -

H l00x50mmRafters m 10 -

I 100mm x 50mm wall plate m 12 -

J 50 x 50 Purlins m 10 -

Roof Covering

30 Gauge galvanized corrugated iron sheets fixed to


K timber Purlins m2 15 -

Painting and Decorating

Knot prime stop and apply two undercoats and one gloss
L finishing coat oil paint to fascia board 200- 300 mm wide m 26 -

Pit latrine for IDP camp - 194/223


TRIPLE PIT LATRINE FOR IDP CAMPS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Total page 3 to Superstructures Collection -

Doors

45mm thick Match boarded timber single door, overall size


A 900x 2100mm high No 3 -

Wrot cypress 1st grade


150x50mm frame two labours plugged screwed and
B pellated m 14 -

C 50x25mm architrave two labours m 15 -

D 25x15mm quadrant one labour m 14 -

Supply and fix the following ironmongery to timber with


matching screws

E Stainless steel hinges Pairs 5 -

F Three lever mortice lock No 3 -

G Rubber door stop No 3 -

Prepare and apply two undercoats and one finishing coat


H oil paint to timber door m2 11 -

Pit latrine for IDP camp - 195/223


TRIPLE PIT LATRINE FOR IDP CAMPS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Total page 4 to Superstructures Collection -

Finishes

Floor Finishes

Cement and sand mortar (1:4)trowelled beds: on concrete:


to

32mm floors finished to receive ceramic tile flooring


A (Optional) m2 3 -

Non slip approved ceramic floor tiles size 300x300x8mm


thick as approved by the Engineer: bedded on cement and
sand screeds(measured separately) : jointed and grouted
in matching colour cement mortar

B Floors (Optional) m2 5 -

100 x 25mm Thick skirting to junction with floor and wall


C finish (Optional) m 11 -

Wall Finishes

15mm cement and sand (1:4) backing; wood float finish: to


receive wall tiles: to

D Walls internally (Optional) m2 24 -

Supply and fix approved Ceramic wall tiles or other equal


and approved fixed with approved quality adhesive in
accordance with manufacturers instructions bedded on
cement sand backing (measured separately): jointed,
pointed and grouted in matching colour cement mortar: to

E 250x300x8mm thick wall tiles (Optional) m2 24 -

12mm lime plaster: steel trowelled finish: on concrete,


block work or stonework: to

F Walls externally (Optional) m2 37 -

Prepare and apply three coats plastic emulsion paint to:

G Walls externally (Optional) m2 37 -

I Pit/squat hole cover (Optional) No 3 -

J 100mm diameter PVC vent pipe with fly screen top m 9 -

Pit latrine for IDP camp - 196/223


TRIPLE PIT LATRINE FOR IDP CAMPS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Total page 5 to Superstructures Collection -

SUPERSTRUCTURE COLLECTION

Total from page 3 -

Total from page 4 -

Total from page 5 -

SUPERSTRUCTURE SUB TOTAL TO SUMMARY -

PIT LATRINE FOR IDP CAMP

SUMMARY

(1) SUBSTRUCTURE -

(2) SUPERSTUCTURE -

Pit latrine for IDP camp - 197/223


TRIPLE PIT LATRINE FOR IDP CAMPS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

TOTAL COST OF TRIPLE PIT LATRINE FOR IDP CAMP -

Pit latrine for IDP camp - 198/223


TYPICAL COMPOSITE PIT LATRINE

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

SUBSTRUCTURE (Provisional)

Excavation

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 200 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 30 -

Excavate for foundation strip commencing at stripped


B levels depth not exceeding 1.50m deep m3 15 -

Pit excavation commencing at stripped levels depth not


C exceeding 1.50m deep m3 13 -

D Extra-over for excavation in rock m3 2 -

E Remove surplus excavated material from site m3 16 -

F Backfill around foundation m3 14 -

Filing

300 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
G concrete surface bed m3 4 -

Insitu concrete: class 15: mix 1:3:6

H 50mm blinding layer under foundations m2 15 -

I 50mm blinding layer on hardcore surfaces m2 11 -

J Treat hardcore surface with approved insecticide m2 11 -

Typical Composite pit latrine - 199/223


TYPICAL COMPOSITE PIT LATRINE

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Total page 1 to Substructures Collection -

Concrete work

Reinforced Concrete class 25

A Strip foundation m3 1 -

Reinforced Concrete class 25

B 100mm thick floor slab with surface steel trowelled smooth m2 21 -

C Allow for pit/squat hole in 100mm thick floor slab No 2 -

Reinforcement

D Reinforcement bars (all sizes) as shown on drawings kg 145 -

Mesh fabric reinforcement ref. No. A142 laid in floor slab


E with minimum 150 mm side allowance m2 21 -

Sawn formwork

Formwork to edges of floor slab girth over 75mm but not


F exceeding 150mm m 20 -

Formwork to edges of strip footing girth over 75mm but not


G exceeding 150mm m 62 -

H Formwork to soffittes of slab m2 7 -

Walling

300mm Thick rubble stone foundation walling in cement


I and sand mortar (1:3) m2 23 -

J 150mm thick masonry wall m2 5 -

One layer 1000gauge polythene sheet damp proof


K membrane under beds: 300mm laps m2 21 -

L 200mm wide Bituminous felt damp-proof course m 21 -

Typical Composite pit latrine - 200/223


TYPICAL COMPOSITE PIT LATRINE

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Total page 2 to Substructures Collection -

Steps

Concrete work

Reinforced Concrete class 25

A Treads, 300 mm wide m 5 -

B Risers, 150 mm high m 4 -

C Open string m2 0.3 -

D Waist m2 0.2 -

Sawn formwork

E Risers: girth over 75mm but not exceeding 150mm m 4 -

F Open string m2 0.3 -

G Waist m2 0.2 -

Cement and sand mortar (1:4) trowelled beds: on


concrete: to

H Treads, 300 mm wide m 5 -

I Risers, 150 mm high m 4 -

J Open string m2 0.3 -

K Waist m2 0.2 -

Non slip approved ceramic floor tiles size 300x300x8mm


thick as approved by the Engineer: bedded on cement and
sand screeds(measured separately) : jointed and grouted
in matching colour cement mortar

L Treads, 300 mm wide (optional) m 5 -

M Risers, 150 mm high (optional) m 4 -

N Open string (optional) m2 0.3 -

O Waist m2 0.2 -

Reinforcement

P High tensile reinforcement bars in assorted sizes kg 20 -

Typical Composite pit latrine - 201/223


TYPICAL COMPOSITE PIT LATRINE

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Total page 3 to Substructures Collection -

Plinths

A 15mm thick cement sand rendering (1:3) to plinths m2 6 -

Prepare and apply three coats black bituminous paint to


B rendered plinths externally m2 6 -

100mm thick approved lining of pit insides up to bottom of


pit if in loose formation areas or in areas with ground water
C (Optional) m2 39 -

Total page 4 to Substructures Collection -

SUBSTRUCTURES COLLECTION

Total from page 1 -

Total from page 2 -

Total from page 3 -

Total from above -

Typical Composite pit latrine - 202/223


TYPICAL COMPOSITE PIT LATRINE

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

SUBSTRUCTURES SUB TOTAL TO SUMMARY -

SUPERSTRUCTURES

Walling

A 150 Thick load bearing solid concrete block walling m2 49 -

B 200mm deep x 400mm wide vent block No 2 -

Wall Coping

Precast concrete 600 x 300 x 50 mm Thick twice


weathered and throated coping jointed and pointed in
C cement and sand mortar m 7 -

Typical Composite pit latrine - 203/223


TYPICAL COMPOSITE PIT LATRINE

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Total page 5 to Superstructures Collection -

Concrete Work

Vibrated reinforced concrete class 25 (1:1.5:3) with 20mm


maximum aggregate as described in:

A Lintels m3 0.10 -

Reinforcement

B 8mm Diameter high tensile reinforcement bar kg 1 -

C Ditto but 10mm kg 3 -

Sawn Formwork to:

D Sides and soffits of lintels m2 1 -

Roofing

Roof Structure

Sawn celcured cypress timber as described in:

E 200mm x 15mm Fascia Board m 14 -

F l00x50mmRafters m 11 -

G 100mm x 50mm wall plate m 12 -

H 50 x 50 Purlins m 13 -

Roof Covering

30 Gauge galvanized corrugated iron sheets fixed to


I timber Purlins m2 12 -

Painting and Decorating

Knot prime stop and apply two undercoats and one gloss
J finishing coat oil paint to fascia board 200- 300 mm wide m 14 -

Typical Composite pit latrine - 204/223


TYPICAL COMPOSITE PIT LATRINE

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Total page 6 to Superstructures Collection -

Doors

45mm thick Match boarded timber single door, overall size


A 900x 2100mm high No 2 -

Wrot cypress 1st grade


150x50mm frame two labours plugged screwed and
B pellated m 10 -

C 50x25mm architrave two labours m 10 -

D 25x15mm quadrant one labour m 10 -

Supply and fix the following ironmongery to timber with


matching screws

E Stainless steel hinges Pairs 3.0 -

F Three lever mortice lock No 2 -

G Rubber door stop No 2 -

Prepare and apply two undercoats and one finishing coat


H oil paint to timber door m2 8 -

Typical Composite pit latrine - 205/223


TYPICAL COMPOSITE PIT LATRINE

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Total page 7 to Superstructures Collection -

Finishes

Floor Finishes

Cement and sand mortar (1:4)trowelled beds: on concrete:


to

32mm floors finished to receive ceramic tile flooring


A (Optional) m2 11 -

Non slip approved ceramic floor tiles size 300x300x8mm


thick as approved by the Engineer: bedded on cement and
sand screeds(measured separately) : jointed and grouted
in matching colour cement mortar

B Floors (Optional) m2 11 -

100 x 25mm Thick skirting to junction with floor and wall


C finish m 19 -

Wall Finishes

15mm cement and sand (1:4) backing; wood float finish: to


receive wall tiles: to

D Walls internally (Optional) m2 48 -

Supply and fix approved Ceramic wall tiles or other equal


and approved fixed with approved quality adhesive in
accordance with manufacturers instructions bedded on
cement sand backing (measured separately): jointed,
pointed and grouted in matching colour cement mortar: to

E 250x300x8mm thick wall tiles (Optional) m2 48 -

12mm lime plaster: steel trowelled finish: on concrete,


block work or stonework: to

F Walls externally m2 40 -

Prepare and apply three coats plastic emulsion paint to:

G Walls externally m2 40 -

Typical Composite pit latrine - 206/223


TYPICAL COMPOSITE PIT LATRINE

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

H Extra over keying m2 6 -

Total page 8 to Superstructures Collection -

Supply and fix hand washing concrete basin size 300mm x


A 450mm No 1 -

B Pit/squat hole cover No 2 -

C 100mm diameter PVC vent pipe with fly screen top m 5 -

D 600 x 600mm precast concrete cover No. 2 -

E 150mm diameter PVC pipe inclined at 45 degrees m 2 -

Elevated storage tank (All optional)

Excavation

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Pit excavation commencing at ground level depth not


F exceeding 1.50m deep m3 3 -

G Extra-over for excavation in rock m3 0.3 -

H Remove surplus excavated material from site m3 1 -

I Backfill around foundation m3 2 -

Insitu concrete: class 15: mix 1:3:6

J 50mm blinding layer under foundations m2 1 -

Concrete work

Reinforced Concrete class 25

K Pad footing m3 0.3 -

L Column m3 0.39 -

Typical Composite pit latrine - 207/223


TYPICAL COMPOSITE PIT LATRINE

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

M Beam m3 0.14 -

N 100mm thick slab m2 1 -

Total page 9 to Superstructures Collection -

Reinforcement

A 1Reinforcement bars (all sizes) as shown on drawings kg 50 -

Mesh fabric reinforcement ref. No. A142 laid in floor slab


B with minimum 150 mm side allowance m2 1 -

Sawn Formwork to:

C Edges of footing m2 1 -

D Vertical sides of columns m2 5 -

E Sides and soffits of ring beam m2 3 -

F Soffittes of slab m2 1 -

G Edges of slab girth over 75mm but not exceeding 150mm m 5 -

Water Supply System

Galvanized Mild Steel pipes class "B" medium thickness


with and including jointing, fittings and fixe as described

H 25mm diameter outlet pipe to wash basin m 4 -

I 25mm diameter inlet pipe m 5 -

J 1600 litre fibre glass storage tank No. 1 -

Total page 10 to Superstructure Collection -

SUPERSTRUCTURE COLLECTION

Total from page 5 -

Total from page 6 -

Total from page 7 -

Typical Composite pit latrine - 208/223


TYPICAL COMPOSITE PIT LATRINE

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Total from page 8 -

Total from page 9 -

Total from above -

SUPERSTRUCTURE SUB TOTAL TO SUMMARY -

TYPICAL COMPOSITE PIT LATRINE

SUMMARY

(1) SUBSTRUCTURE -

(2) SUPERSTUCTURE -

Typical Composite pit latrine - 209/223


TYPICAL COMPOSITE PIT LATRINE

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

TOTAL COST OF TYPICAL COMPOSITE PIT LATRINE -

Typical Composite pit latrine - 210/223


SOLAR PANEL STAND (20 No. 80 WATTS STAND)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Excavation(Provisional)

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 200 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 17 -

Pit excavation commencing at reduced levels depth not


B exceeding 1.50m deep m3 1 -

C Remove surplus excavated material from site m3 0.13 -

D Backfill around foundation m3 1 -

Concrete work

Reinforced Concrete class 25

E Concrete pad with surface steel trowelled smooth m3 0.13 -

Reinforcement

F Reinforcement bars (all sizes) kg 35 -

Sawn formwork

G Formwork to sides m 2 -

Structural steelwork

Supply, fabricate and erect the following framed structural


steelwork; complete with and including all welded and
bolted connections; and including one shop coat red oxide,
zinc chromate or similar and approved primer and 2
finishing coats of gloss oil paint after erection:

38mm x 38mm x 3mm angle frame made by welding the


angle sections using 6mm thick gusset plates and
H supported on 38mm diameter x 2.5mm thick pipes Sum 1 -
Provide and fix 80 Watts Solar Panels complete with a
swith unit, grid tie inverter, watt meter and other
I accessories No. 20 -

TOTAL COST OF SOLAR PANEL STAND -

Solar panel stand - 211/223


PROTECTED SPRING SYSTEM

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY (USD) (USD)

50M3 SPRING PROTECTION STRUCTURE

Excavation

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by bailing,
pumping or otherwise

Prepare site by stripping top 150 mm of soil to remove all


A debris including sand (if any) from site and carting away spoil m2 128 -

Excavate for foundation strip commencing at stripped level


B depth not exceeding 1.50m deep m3 33 -

C Ditto exceeding 1.50m deep but not exceeding 3.00m deep m3 8 -

Pit excavation commencing at reduced levels depth not


D exceeding 1.50m deep m3 36 -

E Extra-over for excavation in soft rock m3 17 -

F Extra-over for excavation in hard rock m3 40 -

G Remove surplus excavated material from site m3 60 -

Filing

H 400mm thick approved natural ground material m3 14 -

I Well compacted approved clay material m3 5 -

J Well compacted approved selected material m3 20 -

K Rubble stone embedded in sand cement mortar (1:4) m3 12 -

L 400 x 200mm stone steps built into wall No. 6 -

M Impermeable well compacted clay layer at the base m3 12 -


Approved compacted mixture of gravel and course sand in
N layers m3 39 -

O Sloping layer of well compacted clay m3 6 -

Sub-Total to Collection -

Protected Spring System - 212/223


PROTECTED SPRING SYSTEM

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY (USD) (USD)
Vibrated Reinforced Concrete class 30(1:1:2) with 20mm thick
maximum aggregate size in

A 200mm Thick floor slab m2 9 -

B Beam m3 2.43 -

C Concrete pads m3 0.13 -

D 200mm thick wall m2 11 -

E 200mm thick base slab m2 7 -

F 100mm thick base slab m2 61 -

G 150mm thick cover slab m2 14 -

Reinforcement

H Reinforcement bars (all sizes) as shown on drawings kg 765 -

Sawn formwork

I Formwork to sides and soffits of beam m2 16 -

J Formwork to sides and soffits of pad m2 2 -

K Formwork to soffits of cover slab m2 14 -

L Formwork to sides of wall m2 86 -

Formwork to edges of base slab over 150mm girth but not


M exceeding 225mm m 13 -

Formwork to edges of base slab over 75mm girth but not


N exceeding 150mm m 27 -

Formwork to edges of cover slab over 75mm girth but not


O exceeding 150mm m 14 -

Sub-Total to Collection -

Protected Spring System - 213/223


PROTECTED SPRING SYSTEM

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY (USD) (USD)
Walling

A 400mm Thick rubble walling in cement and sand mortar (1:3) m2 30 -

B 200mm Thick masonry walling in cement and sand mortar (1:3) m2 9 -

Structural steelwork

Supply, fabricate and erect the following framed structural


steelwork; complete with and including all welded and bolted
connections; and including one shop coat red oxide, zinc
chromate or similar and approved primer and 2 finishing coats
of gloss oil paint after erection:

60.3mm diameter x 5mm thick CHS one end in concrete pad


C supporting roof structure (m.s) m 9 -

D 50 x 50 x 3mm SHS m 43 -

E 25 x 25 x 3mm SHS m 7 -

F Approved wire gaze m2 25 -

Roof Covering

30 Gauge galvanized corrugated iron sheets fixed to timber


G Purlins m2 15 -

Finishes

Cement and sand mortar (1:3) plaster in:

20 mm Thick plaster mixed with Sika or equivalent water


H proofing admixture m2 28 -

I 15mm thick rendering m2 22 -

Sub-Total to Collection -

Water Supply System

Protected Spring System - 214/223


PROTECTED SPRING SYSTEM

RATE AMOUNT
ITEM DESCRIPTION UNIT QTY (USD) (USD)

Galvanized Mild Steel pipes class "B" medium thickness with


and including jointing, fittings and fixe as described

A 150mm diameter pipe (dependent on site topography) m 10 -

100mm diameter draw off pipe Ditto (dependent on site


B topography) m 10 -

75mm diameter washout pipe with appropriate plug (dependent


C on site topography) m 10 -

D 50mm diameter overflow pipe (dependent on site topography) m 10 -

E 600 x 600 x 50mm precast concrete cover No. 2 -

150mm diameter PVC perforated pipe (dependent on site


F topography) m 10 -

Sub-Total to Collection -

COLLECTION

Sub-Total from page 1 -

Sub-Total from page 2 -

Sub-Total from page 3 -

Sub-Total from above -

TOTAL COST OF 50M3 OF SPRING PROTECTION STRUCTURE -

UNIT COST OF 1M3 OF SPRING PROTECTION STRUCTURE -

Protected Spring System - 215/223


GARBAGE PIT (2M DIAMETER x 1..2M DEEP)

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Excavation(Provisional)

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 200 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 5 -

Pit excavation commencing at reduced levels depth not


B exceeding 1.50m deep m3 5 -

C Remove surplus excavated material from site m3 4 -

D Backfill around foundation m3 1 -

Walling
300mm Thick rubble walling in cement and sand mortar
E (1:3) m2 8 -

Finishes

Cement and sand mortar (1:3) plaster in:

F 12mm plaster to external sides of wall m2 7 -

TOTAL COST OF GARBAGE PIT -

Garbage pit - 216/223


SUB-SURFACE DAM AND INFILTRATION GALLERY

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
SUB-SURFACE DAM (PROVISIONAL 25 METRES
WIDE)

Excavation

A Extra-over for excavating in riverbed rock m3 39 -

1000mm x 1000mm x 2000mm gabion boxes for erosion


B protection No. 25 -

Gravel pack filter media composed of a mixture of coarse


C and fine aggregates m3 18 -

Vibrated Reinforced Concrete class 30 (1:1:2) with


additives and 20mm thick maximum aggregate size in

D Wing wall m3 90 -

Reinforcement

E Reinforcement bars (all sizes) as shown on drawings kg 6,050 -

Sawn formwork

F Formwork to sides m2 127 -

150mm diameter PVC slotted /pored collector pipe buried


G 1000mm into sand m 35 -

Well

3000mm to 5000mm deep well lined with non slotted


H reinforced concrete rings to bottom No. 1 -

Borehole cover with sundries for a submersible electric or


I solar pump No. 1 -

J Approved submersible electric or solar pump No. 1 -

TOTAL COST OF CONSTRUCTING 25 M WIDE SUB-SURFACE DAM -

UNIT COST OF CONSTRUCTING 1 M WIDTH OF SUB-SURFACE DAM -

Sub dam & infiltration gallery - 217/223


SUB-SURFACE DAM AND INFILTRATION GALLERY

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
INFILTRATION GALLERY (PROVISIONAL 25 METRES
WIDE

Excavation

A Extra-over for excavating in riverbed rock m3 106 -

300mm thick natural aggregate filter material with coarse


B and fine aggregate mixture (5-25mm) m3 48 -

150mm diameter PVC slotted /pored collector pipe at


C 2500mm centres buried 1000mm into sand m 92 -

D Well compacted clay core m3 58 -

Well

3000mm to 5000mm deep well lined with non slotted


E reinforced concrete rings to bottom No. 1 -

Borehole cover with sundries for a submersible electric or


F solar pump No. 1 -

G Approved submersible electric or solar pump No. 1 -

TOTAL COST OF CONSTRUCTING 25 M WIDE INFILTRATION GALLERY -

UNIT COST OF CONSTRUCTING 1 M WIDTH OF INFILTRATION GALLERY -

Sub dam & infiltration gallery - 218/223


SEPTIC TANKS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

SEPTIC TANK (9000 LITRES CAPACITY)

Note: The quantities given are for a 9000 Litres Capacity


Septic Tank. Quantities to be worked out for other sizes
and verified before costing.

Excavation(Provisional)

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 200 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m3 4 -

Pit excavation commencing at reduced levels depth not


B exceeding 1.50m deep m3 17 -

Pit excavation over 1.50m deep but not exceeding 3.00m


C deep m3 5 -

D Extra-over for excavation in soft rock m3 2 -

E Extra-over for excavation in hard rock m3 8 -

F Remove surplus excavated material from site m3 31 -

G Backfill around foundation m3 5 -

Filing

300 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
H concrete surface bed m3 4 -

Insitu concrete: class 15: mix 1:3:6

I 50mm blinding layer m3 1 -

Concrete work

Reinforced Concrete class 30/20 (1:1:2)

J 200mm thick base slab with surface steel trowelled smooth m3 3 -

K 150 mm thick cover slab m3 1.5 -

Sub-Total to Collection -

Septic tanks - 219/223


SEPTIC TANKS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

A 100mm thick precast concrete scum board m2 1.5 -

B 100mm thick precast concrete dividing wall m2 2 -

Reinforcement

C Reinforcement bars (all sizes) as shown on drawings kg 100 -

Mesh fabric reinforcement ref. No. A142 laid in floor slab


D with minimum 150 mm side allowance m2 17 -

Walling

E 200 Thick load bearing solid concrete block walling m2 30 -

Sawn formwork

Formwork to sides of base slab girth over 150mm but not


F exceeding 225mm m 15 -

Formwork to sides of cover slab girth over 150mm but not


G exceeding 225mm m 12 -

H Formwork to soffit's of cover slab m2 9 -

Finishes

Cement and sand mortar (1:3) in:

15 mm Thick render mixed with Sika or equivalent water


I proofing admixture to internal walls and floors m2 38 -

J 20 mm Thick render to top slab m2 9 -

600x450x6mm heavy gauge steel primed metal manhole


K cover on slab with and including metal framing all around No 2 -

600x600x6mm heavy gauge steel primed metal manhole


L cover on slab with and including metal framing all around No 2 -

20mm Diameter bars, ‘U’ shaped to form steps with ends


M embedded into masonry wall, average length 450mm No 14 -

Benching

N Cement sand mortar benching with waterproof additive m2 7 -

Sub-Total to Collection -

INLET AND DISTRIBUTION MANHOLES

Septic tanks - 220/223


SEPTIC TANKS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
Excavation(Provisional)

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 200 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 3 -

Pit excavation commencing at reduced levels depth not


B exceeding 1.50m deep m3 5 -

C Extra-over for excavation in hard rock m3 1 -

D Remove surplus excavated material from site m3 2 -

E Backfill around foundation m3 3 -

Insitu concrete: class 15: mix 1:3:6

F 50mm blinding layer m2 1 -

Concrete work

Reinforced Concrete class 25

G 100mm thick base slab with surface steel trowelled smooth m2 1 -

Reinforcement

Mesh fabric reinforcement ref. No. A142 laid in floor slab


H with minimum 150 mm side allowance m2 1.5 -

Walling

I 200 Thick load bearing solid concrete block walling m2 4 -

Finishes

UPVC Pipes

100mm diameter inlet to septic tank (Dependent on site


J topography) m 5 -

100mm diameter inlet to soak pit (Dependent on site


K topography) m 5 -

Sub-Total to Collection -

SOAKAGE PIT

Septic tanks - 221/223


SEPTIC TANKS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)

Excavation(Provisional)

Excavation including maintaining and supporting sides and


keeping free from water, mud and fallen materials by
bailing, pumping or otherwise

Prepare site by stripping top 200 mm of soil to remove all


debris including sand (if any) from site and carting away
A spoil m2 2 -

Pit excavation commencing at reduced levels depth not


B exceeding 1.50m deep m3 1 -

C Extra-over for excavation in hard rock m3 0.1 -

D Remove surplus excavated material from site m3 1 -

Filing

300 mm thick approved hardcore filling spread, well


rammed and compacted in 150mm layers to receive
E concrete surface bed (measured separately) m3 1 -

One layer 1000 gauge polythene sheet damp proof


F membrane under beds: 300mm laps m2 2 -

Approved backfill 300mm top layer on the damp proof


G membrane m3 0.5 -

UPVC Pipes

H 150mm diameter outlet french drain m 6 -

Sub-Total to Collection -

Septic tanks - 222/223


SEPTIC TANKS

RATE AMOUNT
ITEM DESCRIPTION UNIT QUANTITY (USD) (USD)
9000 LITRE CAPACITY SEPTIC TANK

COLLECTION

Total from page 1 -

Total from page 2 -

Total from page 3 -

Total from page 4 -

TOTAL COST OF SEPTIC TANK -