Woody 2000 Landscape 10-Dec-13 18:00

Activity ID Activity Name Original Start Finish Resources Budgeted Labor Budgeted Total Cost D J F M April 2014 May 2014 J July 2014 A S O N D J F M A May 2015 J July 2015 A
Duration Units
0 1 2 3 0 1 2 2 0 1 1 2 0 1 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 1 2 0 0 1 2 0 0 1 2 3 0 1 2 2 0 1 1 2 0 0 1 2 2 0 1 2 2 0 1 1
Woody 2000 390 01-Jan-14 30-Jun-15 8830 $17,280,000.00 30-Jun-15, Woody

General Milestones
Milesto 390 01-Jan-14 30-Jun-15 0 $0.00 30-Jun-15, Genera
A1260 Project Start Date 0 01-Jan-14 0 $0.00 Project Start Date
A1270 Design Start 0 08-Jan-14 0 $0.00 Design Start
A1280 Design Finish 0 18-Feb-14 0 $0.00 Design Finish
A1290 Shop drawings Start 0 19-Feb-14 0 $0.00 Shop drawings Start
A1330 Construction Start 0 19-Mar-14 0 $0.00 Construction Start
A1310 Materials Delivery start 0 02-Apr-14 0 $0.00 Materials Delivery start
A1300 Shop drawings finish 0 08-Apr-14 0 $0.00 Shop drawings finish
A1320 Materials Delivery Finish 0 19-Aug-14 0 $0.00 Materials Delivery Finish
A1350 Closeout Start 0 20-May-15 0 $0.00 Closeout Start
A1340 Construction Finish 0 09-Jun-15 0 $0.00 Construction Finish
A1360 Project Finish 0 30-Jun-15 0 $0.00 Project Finish
Design Phase 30 08-Jan-14 18-Feb-14 30 $600,000.00 18-Feb-14, Design Phase
A1000 Project Design 30 08-Jan-14 18-Feb-14 Design Office, Cost 30 $600,000.00 Project Design
Engineering 130 19-Feb-14 19-Aug-14 300 $7,250,000.00 19-Aug-14, Engineering

Shop Drawigs 35 19-Feb-14 08-Apr-14 50 $25,000.00 08-Apr-14, Shop Drawigs


A1010 Shop Drawings Submittal 25 19-Feb-14 25-Mar-14 Contractor, Cost 25 $15,000.00 Shop Drawings Submittal
A1020 Shop drawings Approval 25 05-Mar-14 08-Apr-14 Design Office, Cost 25 $10,000.00 Shop drawings Approval
Materials 130 19-Feb-14 19-Aug-14 250 $7,225,000.00 19-Aug-14, Materials
A1030 Materials submittal 25 19-Feb-14 25-Mar-14 Contractor, Cost 25 $15,000.00 Materials submittal
A1040 Materials Approval 25 05-Mar-14 08-Apr-14 Design Office, Cost 25 $10,000.00 Materials Approval
A1050 Materials Procurement 100 19-Mar-14 05-Aug-14 Contractor, Cost 100 $7,000,000.00 Materials Procurement
A1060 Materials Delivery 100 02-Apr-14 19-Aug-14 Contractor, Cost 100 $200,000.00 Materials Delivery
Construction Phase
P 320 19-Mar-14 09-Jun-15 7950 $9,030,000.00 09-Jun-15, Construction Ph

Extention of existing
exist floor area 320 19-Mar-14 09-Jun-15 5050 $6,680,000.00 09-Jun-15, Extention of exi
Substructure 135 19-Mar-14 23-Sep-14 1350 $1,830,000.00 23-Sep-14, Substructure
A1070 Excavation Works 40 19-Mar-14 13-May-14 resources, Cost 200 $300,000.00 Excavation Works
A1080 P.C Concrete 25 14-May-14 17-Jun-14 resources, Cost 200 $200,000.00 P.C Concrete
A1090 R.C concrete 30 11-Jun-14 22-Jul-14 resources, Cost 300 $1,000,000.00 R.C concrete
A1100 Waterproofing 15 23-Jul-14 12-Aug-14 resources, Cost 150 $80,000.00 Waterproofing
A1110 Backfilling 30 06-Aug-14 16-Sep-14 resources, Cost 400 $100,000.00 Backfilling
A1120 Slab On Grade 10 10-Sep-14 23-Sep-14 resources, Cost 100 $150,000.00 Slab On Grade
Superstructure 90 24-Sep-14 27-Jan-15 1350 $1,000,000.00 27-Jan-15, Superstructure
A1130 Columns Works 40 24-Sep-14 18-Nov-14 resources, Cost 600 $200,000.00 Columns Works
A1140 Slabs Works 50 19-Nov-14 27-Jan-15 resources, Cost 750 $800,000.00 Slabs Works
Finishes 95 28-Jan-15 09-Jun-15 1600 $1,200,000.00 09-Jun-15, Finishes
A1150 Masonry Works 40 28-Jan-15 24-Mar-15 resources, Cost 400 $500,000.00 Masonry Works
A1160 Plaster Works 40 11-Mar-15 05-May-15 resources, Cost 400 $200,000.00 Plaster Works
A1170 Painting Works 40 15-Apr-15 09-Jun-15 resources, Cost 800 $500,000.00 Painting Works
Elctro-Mechanic (MEP)
Elctro-Mechanical 80 18-Feb-15 09-Jun-15 750 $2,650,000.00 09-Jun-15, Elctro-Mechani
A1180 MEP 1st Fix 40 18-Feb-15 14-Apr-15 resources, Cost 400 $650,000.00 MEP 1st Fix
A1190 MEP 2nd and Final Fix 30 29-Apr-15 09-Jun-15 resources, Cost 350 $2,000,000.00 MEP 2nd and Final Fix
Semi-automatic w
woodworking production train 60 25-Feb-15 19-May-15 1400 $850,000.00 19-May-15, Semi-automatic woodw
A1210 Perform the Train Software Development 60 25-Feb-15 19-May-15 resources, Cost 600 $350,000.00 Perform the Train Software Develo
A1200 Install the Train Hardware 40 25-Mar-15 19-May-15 resources, Cost 800 $500,000.00 Install the Train Hardware
Renovate the Pre
President and Executive Vice Presidents' 55 25-Mar-15 09-Jun-15 1500 $1,500,000.00 09-Jun-15, Renovate the P
A1220 Repair Works 30 25-Mar-15 05-May-15 resources, Cost 600 $500,000.00 Repair Works
A1230 Finishes Works 45 08-Apr-15 09-Jun-15 resources, Cost 900 $1,000,000.00 Finishes Works
Close out Phase 30 20-May-15 30-Jun-15 550 $400,000.00 30-Jun-15, Close o
A1250 Closeout the project documentation 30 20-May-15 30-Jun-15 resources, Cost 300 $200,000.00 Closeout the projec
A1240 Testing and Commissioning 25 27-May-15 30-Jun-15 resources, Cost 250 $200,000.00 Testing and Comm

Actual Work Critical Remaining Work Page 1 of 1 TASK filter: All Activities
Remaining Work Milestone © Oracle Corporation