Professional Documents
Culture Documents
FOR
CCTV SYSTEM INSTALLATION
TABLE OF CONTENTS
1. SCOPE
2. DEFINITIONS
4. OPERATION
6. RESPONSIBILITIES
7. MANPOWER REQUIRED
8. MATERIALS REQUIREMENTS
9. EQUIPMENTS REQUIREMENTS
13. DISTRIBUTION
1. SCOPE
This procedure to clear the method of the supply, installations of
CCTV system for the project.
This document details the CCTV system Installation:
1. Preparation of work.
2. Delivery and inspection upon arrival of material at site.
3. Installation of the system.
2. DEFINITIONS
PQP : Project Quality Plan
MS : Method Statement
Specific safety measures have to follow as applicable, and all the safety
measures are covered separately in the project safety plan.
4. OPERATION
Material:
Make sure that civil clearance done prior to start the installation.
Installation will be carried out as per manufacturer
recommendations, Approved shop drawings and project
specifications.
Installation:
Installation of Wires:
Install cables in raceways and cable trays except within consoles,
back boxes, desks, and counters. Conceal raceway and cables
except in unfinished spaces.
Using CAT-6A type cable the maximum length of the cable not
exceeds more than 90 mtrs. Of manufacturer recommendation,
which will provided from structural cabling system supplier.
Comply with requirements for raceways and boxes specified in
Division 26 Section "Raceways, Boxes, Cable Tray, Cable
Ladder and Trunking".
Conceal conductors and cables in accessible ceilings, walls, and
floors where possible.
Grounding
Identification
Programming
6. RESPONSIBILITIES
PROJECT MANAGER
1. To ensure that all the preparation and application works are
carried out according to the Contract Specification and with the
approved drawings.
SITE ENGINEER
1. To ensure that the works are carried out according to the
Contract Specification, approved method statement and the
shop drawings.
FOREMAN
1. The foreman will carry out his duties by maintaining continuous
coordination with the site engineer on daily basis, and ensure
proper distribution of the work force on the required and planned
locations.
SAFETY ENGINEER
1. Ensure the implementation of all the safety measures in
accordance with the HSE plan and everybody aware of it for it’s
proper implementation.
3. Inspect all the site activities and train the person to prevent
accidents and it’s proper implementation.
4. Ensure that the site is maintained clean and tidy.
STORE KEEPER
1. Responsible for overall Store operations in making sure to
store the material delivery to the site and keep it in suitable
area that will keep the material in safe from rusty and
damage.
2. One who will acknowledge the receiving of materials at site in
coordination with QA/QC and concerned Engineer.
7. MANPOWER REQUIRED
Charge hand and Experienced Technicians
8. MATERIALS REQUIREMENTS
CCTV System Components and Accessories.
9. EQUIPMENTS REQUIREMENTS
The Equipment that will be engaged for CCTV System Installation will be
as follows:
1. Tools for fixing the control panel on a vertical surface.
2. Tools for fitting the Remote Units (either Surface or Flush
mount).
3. Crimping & Connecting CAT-6A to RJ-45 Outlets.
4. A small flat-bladed (terminal) screwdriver.
5. A large Posi-drive screwdriver for internal screws
6. A pair of wire cutters/strippers appropriate for the type of
cable used,
7. Ferules and ferruling tool for dressing the ends of cables
(if stranded conductors are used).
8. Pulling Spring
9. Hammer
10. Measuring Wheel.
11. Drilling tools.
12. Ladders.
13. Scaffolding (to be provided by the contractor for the High level
Area).
14. Safety requirements tools such as safety shoes, safety
helmet, safety glasses, fluorescent vest, and safety gloves to
insure maximum ability of safe work and dust mask when
required.
13. DISTRIBUTION
Copy of this method statement shall be issued to the following for
information/ action/ comments:
1. Project Manager
2. Site Engineer
3. Foremen
4. Safety Engineer
6. Store Keeper