OPERATION PHE SIAK Program Number

WELL SERVICE RECOMMENDATION PROGRAM BG070PHESHPT1608


Field Well ID Charge to Date
BATANG BG070 EOS-1300 28-Mar-2016
Sequence Job Primary Job Current Status
1. Huff And Puff Through Tubing Huff And Puff Through Tubing ON
2. - Job Code Off Reason (If any)
3. - HPT -
PBTD : 532 ft. Est. Max. Temp. : 150 oF Latest test : 27-Mar-16 Latest Sonolog : 17-Mar-16
TD : 691 ft. Est. Max. Press. : 350 Psig Fluid Rate : 14 BFPD WFL : 145 feet
RT : - ft. Log : Marked Log Oil Rate : 7 BOPD FAP : 359 feet
GL : - ft. Swab at Night NO Watercut : 50 % SFL : - feet
KOP : - ft. Perfo at Night NO Unit days : 8 days Cost : $ 47,839
- o 100 BFPD Est. Oil rate 50 16
Max.Deviation : Fluid Rate Est. : : BOPD POT : days
Present Procedure
10 Jts 2-7/8" OE Tubing
ALWAYS INITIATE SAFETY MOMENT
1. MIRU Steam Unit. Test equipment, piping, etc.
- Connect flexible hose from wellhead to flow line
- Open valve to production casing
- Inspect and make sure equipment and connections are in good condition
- Repair any apparent leaks and tighten all the bolts
2. Start injecting steam down to the tubing
- Slowly bring the rate 950 BCWEPD of 70 - 80% quality steam
- Limit injecting pressure to 350 psi and temperature at 420 °F
- Flush the flow line using excess steam
- Release Steam Unit after the cumulative injected heat reaches BBTU or
BCWE (see the table)
Top of Liner PLEASE BE CAREFUL WHILE INJECTING STEAM
328' 3. Report daily to Production and Reservoir Engineer
346' RECORD STEAM QUALITY AND RATE IN DAILY BASIS
4. RDMO - Handover with Pumper
360' 5. Soak/Shut the well for approximately 9 days or until SICP reach 30 psi or less
6. POP - Run production test and temperature survey after POP 3 days
414' respectively
424' 7. Housekeeping well site area

438' STEAM PROGRAM


442'
Est. Steam Rate 950 BCWEPD
469' Temperature Steam 420 degF
474' Eff. Of Steam Delivery 0.7 - 0.8 fraction
Total Heat Required 2.50 BBTU
483' Est. Injection Days 7.81 Days
487' Cum. Feed water 7420 BCWE
Max. Injection Pressure 350 psig
496'
Justification
516' well has been shut off because no fluid produced, dynagraph shows tubing pump was
fail to pumping.At surface, fluid at surface appear congealed. Last flow tubing
temperature is 94F. Well is proposed to be Huff and Puff Injection object
TOC 532'

Cost Estimation

Surface Casing : 9-5/8", 36 ppf Rental Cost = $ 17,847.05


Intermediate Casing : - Fuel Consumption = $ 29,992.42 +
Production Casing : 7", 23 ppf Total = $ 47,839.47
Liner : 4-1/2"
Production Tubing : 2-3/8", 4.6 ppf

All depth measurement is Measured Depth (MD)


Prepared by Concurred by
PRODUCTION ENGINEER RESERVOIR ENGINEER EPT. & PRODUCTION MANAGER

BAGUS SURYA BAHARI IMAM FATHONI RASYID R.M. KUSNUN W. WIDODO