1. The well service recommendation proposes a huff and puff steam injection program to improve production from well BG070 in the Batang field.
2. The program would involve injecting steam at a rate of 950 BCWEPD and temperature of 420°F for an estimated 7.81 days until a total of 7420 BCWE of steam is injected.
3. The goal is to increase fluid production from the well which has been shut off due to no fluid production, with the last tubing temperature reading being 94°F and fluid appearing congealed at surface.
1. The well service recommendation proposes a huff and puff steam injection program to improve production from well BG070 in the Batang field.
2. The program would involve injecting steam at a rate of 950 BCWEPD and temperature of 420°F for an estimated 7.81 days until a total of 7420 BCWE of steam is injected.
3. The goal is to increase fluid production from the well which has been shut off due to no fluid production, with the last tubing temperature reading being 94°F and fluid appearing congealed at surface.
1. The well service recommendation proposes a huff and puff steam injection program to improve production from well BG070 in the Batang field.
2. The program would involve injecting steam at a rate of 950 BCWEPD and temperature of 420°F for an estimated 7.81 days until a total of 7420 BCWE of steam is injected.
3. The goal is to increase fluid production from the well which has been shut off due to no fluid production, with the last tubing temperature reading being 94°F and fluid appearing congealed at surface.
WELL SERVICE RECOMMENDATION PROGRAM BG070PHESHPT1608
Field Well ID Charge to Date BATANG BG070 EOS-1300 28-Mar-2016 Sequence Job Primary Job Current Status 1. Huff And Puff Through Tubing Huff And Puff Through Tubing ON 2. - Job Code Off Reason (If any) 3. - HPT - PBTD : 532 ft. Est. Max. Temp. : 150 oF Latest test : 27-Mar-16 Latest Sonolog : 17-Mar-16 TD : 691 ft. Est. Max. Press. : 350 Psig Fluid Rate : 14 BFPD WFL : 145 feet RT : - ft. Log : Marked Log Oil Rate : 7 BOPD FAP : 359 feet GL : - ft. Swab at Night NO Watercut : 50 % SFL : - feet KOP : - ft. Perfo at Night NO Unit days : 8 days Cost : $ 47,839 - o 100 BFPD Est. Oil rate 50 16 Max.Deviation : Fluid Rate Est. : : BOPD POT : days Present Procedure 10 Jts 2-7/8" OE Tubing ALWAYS INITIATE SAFETY MOMENT 1. MIRU Steam Unit. Test equipment, piping, etc. - Connect flexible hose from wellhead to flow line - Open valve to production casing - Inspect and make sure equipment and connections are in good condition - Repair any apparent leaks and tighten all the bolts 2. Start injecting steam down to the tubing - Slowly bring the rate 950 BCWEPD of 70 - 80% quality steam - Limit injecting pressure to 350 psi and temperature at 420 °F - Flush the flow line using excess steam - Release Steam Unit after the cumulative injected heat reaches BBTU or BCWE (see the table) Top of Liner PLEASE BE CAREFUL WHILE INJECTING STEAM 328' 3. Report daily to Production and Reservoir Engineer 346' RECORD STEAM QUALITY AND RATE IN DAILY BASIS 4. RDMO - Handover with Pumper 360' 5. Soak/Shut the well for approximately 9 days or until SICP reach 30 psi or less 6. POP - Run production test and temperature survey after POP 3 days 414' respectively 424' 7. Housekeeping well site area
438' STEAM PROGRAM
442' Est. Steam Rate 950 BCWEPD 469' Temperature Steam 420 degF 474' Eff. Of Steam Delivery 0.7 - 0.8 fraction Total Heat Required 2.50 BBTU 483' Est. Injection Days 7.81 Days 487' Cum. Feed water 7420 BCWE Max. Injection Pressure 350 psig 496' Justification 516' well has been shut off because no fluid produced, dynagraph shows tubing pump was fail to pumping.At surface, fluid at surface appear congealed. Last flow tubing temperature is 94F. Well is proposed to be Huff and Puff Injection object TOC 532'