QC FORM NO. FOTLEIA/WR/F-01 REV 0 UNDERGROUND HDPE PIPE INSPECTION REPORT - FOAM SOLUTION REP.

NO: CX-393/HDPE/BW/ST/IR/01

Rev.No.3/29-6-2017 DATE :07.02.2024

Welding Heating Temp &Time Curing Period as per manufacturer Curing


Item Description /
S.No. Joint Type Alignment Weld Visual recommendation(Minimum) Period Remarks
Joint No
Operator no
Temp Starting & End Time

HDPE Butt Joint Welding


Area - Between North side of FW
tank area and south side of tank
Pipe dia - 250 mm, SDR-7.4
A
J1 9.05 - 9.50 45 MIN 45 MIN
1 B.W ACC WOP.1004 ACC 220°C

J2 10.10 - 10.55 45 MIN 45 MIN


2 B.W ACC WOP.1004 ACC 220°C

J3 10.20 - 11.05 45 MIN 45 MIN


3 B.W ACC WOP.1004 ACC 220°C

J4 11.30 - 12.15 45 MIN 45 MIN


4 B.W ACC WOP.1004 ACC 220°C

J5 12.30 - 1.15 45 MIN 45 MIN


5 B.W ACC WOP.1004 ACC 220°C

J6 12.40 - 1.25 45 MIN 45 MIN


6 B.W ACC WOP.1004 ACC 220°C

FOR FOTLEIA FOR GGME FOR TPI (VELOSI) GGME

FOTLEIA MIDDLE EAST FZC

Z3-43, PB: 9038, SAIF ZONE, SHARJAH, U.A.E. Tel : +971 6 7661106
NAME : NAME : NAME :
PROJECT : PETROCHEM TERMINALS FZE-PETROCHEMICAL TERMINAL AT PLOT B052F02

ITEM : UNDERGROUND HDPE PIPING

SIGN: SIGN: SIGN: CLIENT : PETROCHEM TERMINALS FZE


DATE : DATE : DATE :