The document appears to be a log of site downtime information containing details of dates, times, durations of downtime, site names and types, reasons for downtime, reason categories, and responsible engineers. It includes entries for multiple sites that experienced downtime from January 1-11, 2011, with reasons such as hardware issues, access issues, fuel finishing and NTS team working. The responsible engineers listed are Ghaffar, Aijaz, Aurangzeb.
The document appears to be a log of site downtime information containing details of dates, times, durations of downtime, site names and types, reasons for downtime, reason categories, and responsible engineers. It includes entries for multiple sites that experienced downtime from January 1-11, 2011, with reasons such as hardware issues, access issues, fuel finishing and NTS team working. The responsible engineers listed are Ghaffar, Aijaz, Aurangzeb.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online from Scribd
The document appears to be a log of site downtime information containing details of dates, times, durations of downtime, site names and types, reasons for downtime, reason categories, and responsible engineers. It includes entries for multiple sites that experienced downtime from January 1-11, 2011, with reasons such as hardware issues, access issues, fuel finishing and NTS team working. The responsible engineers listed are Ghaffar, Aijaz, Aurangzeb.
Copyright:
Attribution Non-Commercial (BY-NC)
Available Formats
Download as XLSX, PDF, TXT or read online from Scribd
1/10/11 16:34 1/11/11 12:00 1166 HGW5190__S_Deh_Suterio Site
1/10/11 15:48 1/11/11 12:00 1212 THL6556__S_Taariq_Rice_Mill Site
1/10/11 15:47 1/11/11 12:00 1213 KAD6637__S_GOTH_NEHAL_KHAN Site
1/10/11 15:26 1/11/11 12:00 1234 GAR6352__S_Rjpt_Mhla_Gr_Ysin_2 Site
1/10/11 14:39 1/11/11 12:00 1281 PAQ6785__S_BehindNadraPAQOffice Site
1/10/11 12:28 1/11/11 12:00 1412 KLI0992__S_Goth_BullanKhoso Site 1/10/11 10:50 1/11/11 12:00 1510 HGW6114__S_KDR_BNI_Highway Site 1/10/11 7:23 1/11/11 12:00 1717 JWR5830__S_Jawar_Shaib_Khan Site 1/10/11 7:13 1/11/11 12:00 1727 MSP6600_S_Garhi_Hassan Site 1/9/11 22:21 1/11/11 12:00 2259 LAG6626__S_AdamKhanMehar Site 1/9/11 20:54 1/11/11 12:00 2346 GPR6879__S_GothPartoMalik Site
1/9/11 18:34 1/11/11 12:00 2486 HGW5167__S_Sutiaro_Chak4 Site
1/9/11 15:47 1/11/11 12:00 2653 BGO5176__S_Goth_Sakhi_Younus Site
1/9/11 13:30 1/11/11 12:00 2790 MND6620__S_Mandhan_Thari_Mirwah Site Reason Reason Category USF site, fuel finished team can not moved as alarm received at 5:30PM evening so moved next day early morning and fueling team access site after 8 hour delay due to fog and moved in morning 7:30AM. Also reached site late due to fog and cannot moved fast Fuel Finish 1 Sector was down. Found jumper cable faulty. As before NTS team was working, so inform to PMCL. PMCL TL sheryar says NTS team will do this work. Hardware issue 1 Sector is down, Hardware required mail already sent to pmcl. Hardware issue T-Prime site and alarm received by team around 4:30PM and due access issue at night team cannot moved and access site next day early morning and left for site around 9AM due to fog which also cause delay to access site Access issue Sector down, Hardware required mail already sent to pmcl. 2 sectors are down. EPTSC not rcieve its T.T. But now team is on Hardware issue the way. Hardware issue Outage occurred due to genset out of fuel Fuel Finish is working Nts team was working. New genset not installed. Alrady inform to NTS team working PMCL NTS team working fuel finished and fueling was done very late by fueling team Fuel Finish Nts team working. Currently busy now NTS team working Major fuel theft &heave illegal connection and manually stop Genset already informed PMCL on several mails and also confirmed by Abdul Samad PMCL Fuel Finish Sector down, Hardware required mail already sent to pmcl. Hardware issue Sector down, Hardware required mail already sent to pmcl. Hardware issue Responsible Engineer