You are on page 1of 9

Notes:

0.395
F1 footing 1. All dimensions are in meters, unless otherwise specified.
Stakeout point
F-1 2. Coordinates are in meters and are referred to Project coordinates system.
Project coordinates (E= 0.000, N= 0.000) correspond to Dubai Local Transverse Mercator (DLTM)
coordinates (E= 510500.000, N= 2735500.000)

3. Elevations are in meters and are referred to Dubai Municipality Datum (DMD).

4. This drawing shall be read in conjuntion with all relevant architectural & civil drawings, and
technical specifications, specially with the drawing "NE1-03-EM-SCH-DRW-YM_(M)-00001"
where connections between building and foundation are described.
In case of discrepancy between civil works and other drawings, the Contractor shall refer to the
Engineer to define the order of applicability.

5. Under lean concrete, a 250 mm layer of structural fill compacted to 98% maximum dry density
F-2

4.402
(ASTM D-1557), according to Earthworks Specification and Soil Investigation Report, shall be
F-3 placed.

6. Material properties shall comply with the requirements of Civilworks Technical Specification:
Lean concrete
f'c = 20MPa (cylinder test at 28 days)
Cement type I (*)
Maximum aggregate size: 25mm
Concrete
f'c = 35MPa (cylinder test at 28 days)
Electrical building Electrical building Cement type IIIA (*), Portland cement + 36%-65% GGBS
Exposure: S3 / c
SF-NW SF-NE Maximum water/cement ratio: 0.37
Minimum cement content: 410 Kg/m3
Maximum aggregate size: 20mm
Structural Steel (profiles and plates):
Hot-rolled steel ASTM A572 Gr 50
Reinforcement steel:
Grade B500B, minimum yield strength of 500MPa, as per BS4449:2005
Non-shrink grout / mortar:
F2 footing F3 footing f'c = 50MPa (cylinder test at 28 days)
Stakeout point Stakeout point Post-installed chemical anchor bolts. Hilti HIT-V-8.8 stainless steel+ HIT-HY 200-R (or similar)
Nuts ASTM A563M Grade A, hot dip galvanized
Washers & anchor plates ASTM A36 hot dip galvanized
Bolts ASTM A325

5.225
(*) Cement type in accordance with BS8500-1:2006 and DM Circular 225
F-4 F-5 7. A 100 mm layer of blinding concrete shall be placed beneath all foundations.

8. The outer surface of concrete foundations in contact with soil shall be protected with bituminous
coating, according to project specifications.

9. Perimeter edges of foundations shall be chamfered (45º angle and 25mm side).

F4 footing 10. All reinforced concrete structures shall comply with the Civilworks Technical Specification and ACI
Stakeout point 318-14. Dimensional tolerances shall be in accordance with ACI-117 "Specifications for tolerances
for concrete construction and materials"

11. Reinforcing detailing shall comply with the document "NE1-00-EM-EAI-DRW-YC_(C)-00100 Civil
General Notes, Symbols and Materials" and ACI 318-14.
Electrical building Electrical building
SF-W SF-E 12. Geotechnical parametes considered in calculations:
Allowable bearing pressure: 150 kpa
Friction coefficient soil-foundation: 0.4
Soil density: 16 kN/m3
Power Block Plate bearing tests shall be performed on site to comply with the requirement.
PT-2

3.250
13. Cover reinforcement:
- Underground structures: 75mm
F-6 - Above ground structures and foundations in contact with lean concrete: 50mm

14. Post installed anchor bolts shall be executed only after all supports have been staked out with the
electrical building in its final location.

Symbols & abbreviations:

Stakeout point
TR&BR Top and Bottom Reinforcement
FGL Finish Grade Level
TOC Top of Concrete
FFL Finish floor level
F5 footing
F6 footing TOS Top of steel
Stakeout point
Stakeout point BOS Bottom of steel

References:

NE1-00-EM-EAI-DRW-YC_(C)-00100 Civil General Notes, Symbols and Materials

F-8 NE1-00-EM-EAI-TSP-YC_(C)-00450 Civilworks Technical Specification

F-9 NE1-00-EM-EAI-TSP-UW_(C)-00500 Earthworks Technical Specification


Electrical building Electrical building

6.000
SF-SW SF-SE NE1-00-EM-EAI-PLN-YC_(C)-00200 CT&PT, Civil Project Criteria

NE1-20-CN-SEC-REP-OOO(G)-00015 SF Soil Investigation Report for PT2

NE1-20-EM-CDI-DRW-YTG_(C)-00103-D Site Levelling of PT2 Plant (SF and rest of the Plant) 2
NE1-03-EM-SCH-DRW-YM_(M)-00001 Steel structure system (ECR) drawing

NE1-03-EM-SCH-DRW-YM_(M)-00003 Stairs and platform drawing

F8 footing NE1-20-EM-ABE-REP-UBA(C)-00102 SF Electrical Building foundation calculation report


Stakeout point

F9 footing
Stakeout point

General plan view

3.375
Solar field layout just for reference
Scale 1:6000

F-10 F-11
West stakeout points table East stakeout points table
F11 footing
Electrical building Foundation Name East (m) North (m) TOC Column (m) Electrical building Foundation Name East (m) North (m) TOC Column (m) Stakeout point 02 2020/12/04 Levelling change in Subfield SW IFC LMC FCG MRF DMRG

SF - NW F-10 1548.545 2136.988 142.394 SF - NE F-10 3579.925 2136.988 151.149 01 2020/07/06 For construction IFC MHG FCG MRF DMRG

Rev. Edition Description: Issue Signature Signature Signature Signature


SF - W F-10 1548.545 1441.248 142.212 SF - E F-10 3579.925 1441.248 151.149 No.: Date: for: Drawn: Checked: Reviewed: Approved:
Client: P. Engineer (if applicable):
SF - SW F-10 1548.545 744.528 142.212 2 SF - SE F-10 3579.925 744.528 151.149
Stamp: Signature: P.Eng.No:
2.801

EPC Contractor:
Origin Stakeout point
(see coordinates table)

F7 footing Project: EPC Subcontractor:


Stakeout point
F-7 NE1-700MW CSP + 250MW PV
Hybrid Project ABENGOA
Scale: PT-2 Solar Field Area Drawing No.:

Title & Subtitles:


NE1-20-EM-ABE-DRW-UBA(C)-00102
Various Foundations for Solar Field
0.127 3.450 Sheets: Sheet No.:
Electrical area 09 01
Size:
ECR foundation Int. Drawing No.
Electrical building foundation A1 General arrangement & layout
North Plan view This drawing and the design it covers are the property of Abengoa. They have been
merely loaned by express agreement of the borrower, who states that it cannot be
Project/Contract number:

Scale 1:50 reproduced, copied, loaned, exhibited or used under any circumstances. As an Document status: X For approval. For information.
exception, it can be used in a limited and private way, as long as Abengoa gives
permission to the borrower for using it through a written consent. Critical: Yes X No
Notes:
Footing F1. Electrical building definition 1. All dimensions are in meters, unless otherwise specified.

2. Coordinates are in meters and are referred to Project coordinates system.


Footing Name Dimensions x-y (m) Depth (m) Top reinf. (x) Bottom reinf. (x) Top reinf. (y) Bottom reinf. (y) Skin reinforcement Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) Project coordinates (E= 0.000, N= 0.000) correspond to Dubai Local Transverse Mercator (DLTM)
coordinates (E= 510500.000, N= 2735500.000)
F-1 1.640 x 0.400 0.300 Ø12@200 Ø12@200 Ø12@200 Ø12@200 N/A SF - NW 140.544 140.844 N/A SF - NE 149.299 149.599 N/A
3. Elevations are in meters and are referred to Dubai Municipality Datum (DMD).
SF - W 140.362 140.662 N/A SF - E 149.299 149.599 N/A
4. This drawing shall be read in conjuntion with all relevant architectural & civil drawings, and
SF - SW 140.362 140.662 N/A SF - SE 149.299 149.599 N/A technical specifications, specially with the drawing "NE1-03-EM-SCH-DRW-YM_(M)-00001"
where connections between building and foundation are described.
2 In case of discrepancy between civil works and other drawings, the Contractor shall refer to the
Engineer to define the order of applicability.

5. Under lean concrete, a 250 mm layer of structural fill compacted to 98% maximum dry density
(ASTM D-1557), according to Earthworks Specification and Soil Investigation Report, shall be
placed.

6. Material properties shall comply with the requirements of Civilworks Technical Specification:
Lean concrete
f'c = 20MPa (cylinder test at 28 days)
Cement type I (*)
Maximum aggregate size: 25mm
Concrete
f'c = 35MPa (cylinder test at 28 days)
Cement type IIIA (*), Portland cement + 36%-65% GGBS
Exposure: S3 / c
Maximum water/cement ratio: 0.37
Minimum cement content: 410 Kg/m3
Maximum aggregate size: 20mm
Bituminous Structural Steel (profiles and plates):
coating (note 8) TOC Pedestal TOC Pedestal TOC Pedestal Hot-rolled steel ASTM A572 Gr 50
A Bituminous Reinforcement steel:
0.200 1.240 0.200 coating (note 8) Grade B500B, minimum yield strength of 500MPa, as per BS4449:2005

0.300

0.300
Non-shrink grout / mortar:
FGL varies TOC Footing FGL varies TOC Footing f'c = 50MPa (cylinder test at 28 days)
Pedestal Pedestal Post-installed chemical anchor bolts. Hilti HIT-V-8.8 stainless steel+ HIT-HY 200-R (or similar)
Nuts ASTM A563M Grade A, hot dip galvanized
0.400

0.100 0.100

0.300

0.300
B B' Washers & anchor plates ASTM A36 hot dip galvanized
0.200 0.200 Bolts ASTM A325

0.100
0.100
Stakeout
(*) Cement type in accordance with BS8500-1:2006 and DM Circular 225
A' 1.640 point

0.250

0.250
7. A 100 mm layer of blinding concrete shall be placed beneath all foundations.

8. The outer surface of concrete foundations in contact with soil shall be protected with bituminous
Structural fill (note 5) Lean concrete Structural fill (note 5) Lean concrete coating, according to project specifications.
0.400 0.838 0.400
Plan view 9. Perimeter edges of foundations shall be chamfered (45º angle and 25mm side).
Scale 1:20 0.400
North Section A-A' Section B-B' 10. All reinforced concrete structures shall comply with the Civilworks Technical Specification and ACI
Scale 1:20 318-14. Dimensional tolerances shall be in accordance with ACI-117 "Specifications for tolerances
Scale 1:20 for concrete construction and materials"

11. Reinforcing detailing shall comply with the document "NE1-00-EM-EAI-DRW-YC_(C)-00100 Civil
General Notes, Symbols and Materials" and ACI 318-14.

12. Geotechnical parametes considered in calculations:


Allowable bearing pressure: 150 kpa
Friction coefficient soil-foundation: 0.4
Soil density: 16 kN/m3
Plate bearing tests shall be performed on site to comply with the requirement.

13. Cover reinforcement:


- Underground structures: 75mm
- Above ground structures and foundations in contact with lean concrete: 50mm

14. Post installed anchor bolts shall be executed only after all supports have been staked out with the
electrical building in its final location.

Symbols & abbreviations:

Stakeout point
TR&BR Top and Bottom Reinforcement
Footing F2. Electrical building definition FGL Finish Grade Level
TOC Top of Concrete
FFL Finish floor level
Footing Name Dimensions x-y (m) Depth (m) Top reinf. (x) Bottom reinf. (x) Top reinf. (y) Bottom reinf. (y) Skin reinforcement Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) TOS Top of steel
BOS Bottom of steel
F-2 2.950 x 2.650 0.400 Ø16@200 Ø16@200 Ø16@200 Ø16@200 1Ø12 SF - NW 140.194 140.844 142.394 SF - NE 148.949 149.599 151.149
References:
SF - W 140.012 140.662 142.212 SF - E 148.949 149.599 151.149
NE1-00-EM-EAI-DRW-YC_(C)-00100 Civil General Notes, Symbols and Materials
SF - SW 140.012 140.662 142.212 SF - SE 148.949 149.599 151.149
NE1-00-EM-EAI-TSP-YC_(C)-00450 Civilworks Technical Specification
2
NE1-00-EM-EAI-TSP-UW_(C)-00500 Earthworks Technical Specification

B' NE1-00-EM-EAI-PLN-YC_(C)-00200 CT&PT, Civil Project Criteria

NE1-20-CN-SEC-REP-OOO(G)-00015 SF Soil Investigation Report for PT2


0.490 1.970 0.490 TOC Column
NE1-20-EM-CDI-DRW-YTG_(C)-00103-D Site Levelling of PT2 Plant (SF and rest of the Plant) 2
NE1-03-EM-SCH-DRW-YM_(M)-00001 Steel structure system (ECR) drawing

NE1-03-EM-SCH-DRW-YM_(M)-00003 Stairs and platform drawing


0.510

NE1-20-EM-ABE-REP-UBA(C)-00102 SF Electrical Building foundation calculation report


Pedestal Pedestal
2.200
1.045
2.650

TOC Pedestal TOC Pedestal


Pedestal Pedestal

FGL varies FGL varies

Stakeout 0.650
point
0.575

Bituminous
coating (note 8) 02 2020/12/04 Levelling change in Subfield SW IFC LMC FCG MRF DMRG
Column Bituminous
TOC Footing TOC Footing 01 2020/07/06 For construction IFC MHG FCG MRF DMRG
coating (note 8)
0.100
Rev. Edition Description: Issue Signature Signature Signature Signature
0.100 No.: Date: for:
A A Drawn: Checked: Reviewed: Approved:
0.400

0.400

0.200 0.200 Client: P. Engineer (if applicable):


Stamp: Signature: P.Eng.No:
0.520

0.250 0.100
0.250 0.100

EPC Contractor:

1.340 1.610

2.950 Lean concrete Lean concrete


Structural fill (note 5) Structural fill (note 5) Project: EPC Subcontractor:
NE1-700MW CSP + 250MW PV
B' 1.090 0.500 1.360 0.310 0.400 0.645 0.400 0.895 Hybrid Project ABENGOA
Scale: PT-2 Solar Field Area Drawing No.:

Title & Subtitles:


NE1-20-EM-ABE-DRW-UBA(C)-00102
1:20 Foundations for Solar Field
Plan view Section A-A' Section B-B' Sheets: Sheet No.:
Scale 1:20 Scale 1:20 Electrical area 09 02
Scale 1:20 Size:
North ECR foundation Int. Drawing No.
A1 Footings F1 & F2
This drawing and the design it covers are the property of Abengoa. They have been Project/Contract number:
merely loaned by express agreement of the borrower, who states that it cannot be
reproduced, copied, loaned, exhibited or used under any circumstances. As an Document status: X For approval. For information.
exception, it can be used in a limited and private way, as long as Abengoa gives
permission to the borrower for using it through a written consent. Critical: Yes X No
Notes:
Footing F3. Electrical building definition 1. All dimensions are in meters, unless otherwise specified.

2. Coordinates are in meters and are referred to Project coordinates system.


Footing Name Dimensions x-y (m) Depth (m) Top reinf. (x) Bottom reinf. (x) Top reinf. (y) Bottom reinf. (y) Skin reinforcement Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) Project coordinates (E= 0.000, N= 0.000) correspond to Dubai Local Transverse Mercator (DLTM)
coordinates (E= 510500.000, N= 2735500.000)
F-3 2.450 x 2.800 0.400 Ø16@200 Ø16@200 Ø16@200 Ø16@200 1Ø12 SF - NW 140.194 140.844 142.394 SF - NE 148.949 149.599 151.149
3. Elevations are in meters and are referred to Dubai Municipality Datum (DMD).
SF - W 140.012 140.662 142.212 SF - E 148.949 149.599 151.149
4. This drawing shall be read in conjuntion with all relevant architectural & civil drawings, and
SF - SW 140.012 140.662 142.212 SF - SE 148.949 149.599 151.149 technical specifications, specially with the drawing "NE1-03-EM-SCH-DRW-YM_(M)-00001"
where connections between building and foundation are described.
B' 2 In case of discrepancy between civil works and other drawings, the Contractor shall refer to the
Engineer to define the order of applicability.
0.436 0.360 1.654
5. Under lean concrete, a 250 mm layer of structural fill compacted to 98% maximum dry density
TOC Column (ASTM D-1557), according to Earthworks Specification and Soil Investigation Report, shall be
placed.
0.260

Pedestal
6. Material properties shall comply with the requirements of Civilworks Technical Specification:
Lean concrete
f'c = 20MPa (cylinder test at 28 days)
Cement type I (*)
Maximum aggregate size: 25mm
Concrete
f'c = 35MPa (cylinder test at 28 days)
Cement type IIIA (*), Portland cement + 36%-65% GGBS
1.045

Exposure: S3 / c
Maximum water/cement ratio: 0.37

1.880
Minimum cement content: 410 Kg/m3
Maximum aggregate size: 20mm
Structural Steel (profiles and plates):

2.200
Pedestal Hot-rolled steel ASTM A572 Gr 50
Reinforcement steel:
Grade B500B, minimum yield strength of 500MPa, as per BS4449:2005

2.800
Non-shrink grout / mortar:
TOC Pedestal TOC Pedestal f'c = 50MPa (cylinder test at 28 days)
Post-installed chemical anchor bolts. Hilti HIT-V-8.8 stainless steel+ HIT-HY 200-R (or similar)
Nuts ASTM A563M Grade A, hot dip galvanized
Column
Washers & anchor plates ASTM A36 hot dip galvanized
FGL varies FGL varies Bolts ASTM A325
1.223

0.650
A A' (*) Cement type in accordance with BS8500-1:2006 and DM Circular 225

Bituminous Bituminous 7. A 100 mm layer of blinding concrete shall be placed beneath all foundations.
TOC Footing coating (note 8) coating (note 8) TOC Footing
8. The outer surface of concrete foundations in contact with soil shall be protected with bituminous
Stakeout 0.920 0.100
0.100 coating, according to project specifications.
point Pedestal Pedestal

0.400

0.400
0.200
0.200 9. Perimeter edges of foundations shall be chamfered (45º angle and 25mm side).

10. All reinforced concrete structures shall comply with the Civilworks Technical Specification and ACI
0.272

0.100
0.250 0.100
318-14. Dimensional tolerances shall be in accordance with ACI-117 "Specifications for tolerances
for concrete construction and materials"

0.250
0.923 1.235 0.292 11. Reinforcing detailing shall comply with the document "NE1-00-EM-EAI-DRW-YC_(C)-00100 Civil
2.450 General Notes, Symbols and Materials" and ACI 318-14.
Lean concrete Structural fill (note 5) Structural fill (note 5) Lean concrete
12. Geotechnical parametes considered in calculations:
Allowable bearing pressure: 150 kpa
B Friction coefficient soil-foundation: 0.4
0.546 0.500 1.404 1.295 0.400 0.645 0.400 0.060 Soil density: 16 kN/m3
Plate bearing tests shall be performed on site to comply with the requirement.
Plan view
Scale 1:20
Section A-A' Section B-B' 13. Cover reinforcement:
North Scale 1:20 Scale 1:0 - Underground structures: 75mm
- Above ground structures and foundations in contact with lean concrete: 50mm

14. Post installed anchor bolts shall be executed only after all supports have been staked out with the
electrical building in its final location.

Symbols & abbreviations:

Stakeout point
TR&BR Top and Bottom Reinforcement
Footing F4. Electrical building definition FGL Finish Grade Level
TOC Top of Concrete
FFL Finish floor level
Footing Name Dimensions x-y (m) Depth (m) Top reinf. (x) Bottom reinf. (x) Top reinf. (y) Bottom reinf. (y) Skin reinforcement Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) TOS Top of steel
BOS Bottom of steel
F-4 2.800 x 2.800 0.500 Ø16@200 Ø16@200 Ø16@200 Ø16@200 1Ø12 SF - NW 140.194 N/A 142.394 SF - NE 148.949 N/A 151.149
References:
SF - W 140.012 N/A 142.212 SF - E 148.949 N/A 151.149
NE1-00-EM-EAI-DRW-YC_(C)-00100 Civil General Notes, Symbols and Materials
SF - SW 140.012 N/A 142.212 SF - SE 148.949 N/A 151.149
NE1-00-EM-EAI-TSP-YC_(C)-00450 Civilworks Technical Specification
2 2
NE1-00-EM-EAI-TSP-UW_(C)-00500 Earthworks Technical Specification

A' NE1-00-EM-EAI-PLN-YC_(C)-00200 CT&PT, Civil Project Criteria


TOC Column TOC Column
1.400 1.400 NE1-20-CN-SEC-REP-OOO(G)-00015 SF Soil Investigation Report for PT2

NE1-20-EM-CDI-DRW-YTG_(C)-00103-D Site Levelling of PT2 Plant (SF and rest of the Plant) 2
NE1-03-EM-SCH-DRW-YM_(M)-00001 Steel structure system (ECR) drawing
0.625

NE1-03-EM-SCH-DRW-YM_(M)-00003 Stairs and platform drawing


Column
NE1-20-EM-ABE-REP-UBA(C)-00102 SF Electrical Building foundation calculation report

2.200
2.800
1.550

FGL varies

Bituminous
coating (note 8)
Column TOC Footing 02 2020/12/04 Levelling change in Subfield SW IFC LMC FCG MRF DMRG
01 2020/07/06 For construction IFC MHG FCG MRF DMRG

0.100 Rev. Edition Description: Issue Signature Signature Signature Signature

0.500
No.: Date: for: Drawn: Checked: Reviewed: Approved:
0.200
Client: P. Engineer (if applicable):
0.625

Stakeout Stamp: Signature: P.Eng.No:


point

0.100
0.250 EPC Contractor:

2.800
Structural fill (note 5) Lean concrete
Project: EPC Subcontractor:
A NE1-700MW CSP + 250MW PV
0.375 0.500 1.050 0.500 0.375 Hybrid Project ABENGOA
Plan view Scale: Drawing No.:
PT-2 Solar Field Area

Title & Subtitles:


North Scale 1:20 NE1-20-EM-ABE-DRW-UBA(C)-00102
Section A-A' 1:20 Foundations for Solar Field Sheets: Sheet No.:
Scale 1:20 Electrical area 09 03
Size:
ECR foundation Int. Drawing No.
A1 Footings F3 & F4
This drawing and the design it covers are the property of Abengoa. They have been Project/Contract number:
merely loaned by express agreement of the borrower, who states that it cannot be
reproduced, copied, loaned, exhibited or used under any circumstances. As an Document status: X For approval. For information.
exception, it can be used in a limited and private way, as long as Abengoa gives
permission to the borrower for using it through a written consent. Critical: Yes X No
Notes:
Footing F5. Electrical building definition 1. All dimensions are in meters, unless otherwise specified.

2. Coordinates are in meters and are referred to Project coordinates system.


Footing Name Dimensions x-y (m) Depth (m) Top reinf. (x) Bottom reinf. (x) Top reinf. (y) Bottom reinf. (y) Skin reinforcement Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) Project coordinates (E= 0.000, N= 0.000) correspond to Dubai Local Transverse Mercator (DLTM)
coordinates (E= 510500.000, N= 2735500.000)
F-5 2.000 x 6.050 0.400 Ø16@200 Ø16@200 Ø16@200 Ø16@200 1Ø12 SF - NW 140.194 140.844 142.394 SF - NE 148.949 149.599 151.149
3. Elevations are in meters and are referred to Dubai Municipality Datum (DMD).
SF - W 140.012 140.662 142.212 SF - E 148.949 149.599 151.149
4. This drawing shall be read in conjuntion with all relevant architectural & civil drawings, and
SF - SW 140.012 140.662 142.212 SF - SE 148.949 149.599 151.149 technical specifications, specially with the drawing "NE1-03-EM-SCH-DRW-YM_(M)-00001"
where connections between building and foundation are described.
2 In case of discrepancy between civil works and other drawings, the Contractor shall refer to the
Engineer to define the order of applicability.

5. Under lean concrete, a 250 mm layer of structural fill compacted to 98% maximum dry density
(ASTM D-1557), according to Earthworks Specification and Soil Investigation Report, shall be
placed.

6. Material properties shall comply with the requirements of Civilworks Technical Specification:
Lean concrete
f'c = 20MPa (cylinder test at 28 days)
Cement type I (*)
2.000 TOC Column Maximum aggregate size: 25mm
Concrete
0.960 0.700 0.340 f'c = 35MPa (cylinder test at 28 days)
Cement type IIIA (*), Portland cement + 36%-65% GGBS
B'
Exposure: S3 / c
Maximum water/cement ratio: 0.37
Minimum cement content: 410 Kg/m3

0.315
Pedestal Pedestal Maximum aggregate size: 20mm
Structural Steel (profiles and plates):
0.560

Hot-rolled steel ASTM A572 Gr 50


Column Reinforcement steel:
Grade B500B, minimum yield strength of 500MPa, as per BS4449:2005

1.550
Non-shrink grout / mortar:
f'c = 50MPa (cylinder test at 28 days)
Post-installed chemical anchor bolts. Hilti HIT-V-8.8 stainless steel+ HIT-HY 200-R (or similar)
Nuts ASTM A563M Grade A, hot dip galvanized
Washers & anchor plates ASTM A36 hot dip galvanized
Bolts ASTM A325

(*) Cement type in accordance with BS8500-1:2006 and DM Circular 225

TOC Pedestal TOC Pedestal 7. A 100 mm layer of blinding concrete shall be placed beneath all foundations.
1.550

8. The outer surface of concrete foundations in contact with soil shall be protected with bituminous
FGL varies coating, according to project specifications.

0.650
2.695 9. Perimeter edges of foundations shall be chamfered (45º angle and 25mm side).
Bituminous
10. All reinforced concrete structures shall comply with the Civilworks Technical Specification and ACI
coating (note 8)
TOC Footing 318-14. Dimensional tolerances shall be in accordance with ACI-117 "Specifications for tolerances
Column for concrete construction and materials"
0.100
11. Reinforcing detailing shall comply with the document "NE1-00-EM-EAI-DRW-YC_(C)-00100 Civil

0.400
0.200 General Notes, Symbols and Materials" and ACI 318-14.

12. Geotechnical parametes considered in calculations:

0.100
Allowable bearing pressure: 150 kpa
Friction coefficient soil-foundation: 0.4
Soil density: 16 kN/m3

0.250
Plate bearing tests shall be performed on site to comply with the requirement.

13. Cover reinforcement:


Structural fill (note 5) Lean concrete
- Underground structures: 75mm
Pedestal Pedestal - Above ground structures and foundations in contact with lean concrete: 50mm
6.050

0.500 0.400 0.300 0.400 14. Post installed anchor bolts shall be executed only after all supports have been staked out with the
0.135 0.125 0.140 electrical building in its final location.

Symbols & abbreviations:


Section A-A'
Stakeout point
Scale 1:20
TR&BR Top and Bottom Reinforcement
FGL Finish Grade Level
TOC Top of Concrete
3.250

FFL Finish floor level


TOS Top of steel
BOS Bottom of steel

References:

NE1-00-EM-EAI-DRW-YC_(C)-00100 Civil General Notes, Symbols and Materials


TOC Column TOC Column TOC Column
2.695

NE1-00-EM-EAI-TSP-YC_(C)-00450 Civilworks Technical Specification

NE1-00-EM-EAI-TSP-UW_(C)-00500 Earthworks Technical Specification

NE1-00-EM-EAI-PLN-YC_(C)-00200 CT&PT, Civil Project Criteria

NE1-20-CN-SEC-REP-OOO(G)-00015 SF Soil Investigation Report for PT2

Stakeout NE1-20-EM-CDI-DRW-YTG_(C)-00103-D Site Levelling of PT2 Plant (SF and rest of the Plant) 2
point
NE1-03-EM-SCH-DRW-YM_(M)-00001 Steel structure system (ECR) drawing
Column
NE1-03-EM-SCH-DRW-YM_(M)-00003 Stairs and platform drawing

NE1-20-EM-ABE-REP-UBA(C)-00102 SF Electrical Building foundation calculation report

2.200
Pedestal Pedestal
A A'
0.690

0.345

FGL varies

0.385 0.575 0.700 0.340


Bituminous
coating (note 8)
B TOC Footing

0.100

0.400
0.200

Plan view 02 2020/12/04 Levelling change in Subfield SW IFC LMC FCG MRF DMRG

0.100
North Scale 1:20
01 2020/07/06 For construction IFC MHG FCG MRF DMRG

Rev. Edition Issue Signature Signature Signature Signature

0.250
No.: Date: Description:
for: Drawn: Checked: Reviewed: Approved:
Client: P. Engineer (if applicable):
Structural fill (note 5) Lean concrete Stamp: Signature: P.Eng.No:

EPC Contractor:
0.310 0.500 1.050 0.500 2.750 0.500 0.440

Project: EPC Subcontractor:


Section B-B' NE1-700MW CSP + 250MW PV
Scale 1:20
Hybrid Project ABENGOA
Scale: PT-2 Solar Field Area Drawing No.:

Title & Subtitles:


NE1-20-EM-ABE-DRW-UBA(C)-00102
1:20 Foundations for Solar Field Sheets: Sheet No.:
Electrical area 09 04
Size:
ECR foundation Int. Drawing No.
A1 Footing F5
This drawing and the design it covers are the property of Abengoa. They have been Project/Contract number:
merely loaned by express agreement of the borrower, who states that it cannot be
reproduced, copied, loaned, exhibited or used under any circumstances. As an Document status: X For approval. For information.
exception, it can be used in a limited and private way, as long as Abengoa gives
permission to the borrower for using it through a written consent. Critical: Yes X No
Notes:
Footing F6. Electrical building definition 1. All dimensions are in meters, unless otherwise specified.

2. Coordinates are in meters and are referred to Project coordinates system.


Footing Name Dimensions x-y (m) Depth (m) Top reinf. (x) Bottom reinf. (x) Top reinf. (y) Bottom reinf. (y) Skin reinforcement Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) Project coordinates (E= 0.000, N= 0.000) correspond to Dubai Local Transverse Mercator (DLTM)
coordinates (E= 510500.000, N= 2735500.000)
F-6 2.100 x 2.300 0.500 Ø16@200 Ø16@200 Ø16@200 Ø16@200 1Ø12 SF - NW 140.194 N/A 142.394 SF - NE 148.949 N/A 151.149
3. Elevations are in meters and are referred to Dubai Municipality Datum (DMD).
SF - W 140.012 N/A 142.212 SF - E 148.949 N/A 151.149
4. This drawing shall be read in conjuntion with all relevant architectural & civil drawings, and
SF - SW 140.012 N/A 142.212 SF - SE 148.949 N/A 151.149 technical specifications, specially with the drawing "NE1-03-EM-SCH-DRW-YM_(M)-00001"
where connections between building and foundation are described.
2 2 In case of discrepancy between civil works and other drawings, the Contractor shall refer to the
Engineer to define the order of applicability.

TOC Column 5. Under lean concrete, a 250 mm layer of structural fill compacted to 98% maximum dry density
(ASTM D-1557), according to Earthworks Specification and Soil Investigation Report, shall be
placed.

6. Material properties shall comply with the requirements of Civilworks Technical Specification:
Lean concrete
f'c = 20MPa (cylinder test at 28 days)
1.050 1.050
Cement type I (*)
Maximum aggregate size: 25mm
Concrete
f'c = 35MPa (cylinder test at 28 days)
Cement type IIIA (*), Portland cement + 36%-65% GGBS
Exposure: S3 / c
Maximum water/cement ratio: 0.37
Minimum cement content: 410 Kg/m3

2.200
Maximum aggregate size: 20mm
Structural Steel (profiles and plates):
1.150

Hot-rolled steel ASTM A572 Gr 50


Reinforcement steel:
Grade B500B, minimum yield strength of 500MPa, as per BS4449:2005
Non-shrink grout / mortar:
Column f'c = 50MPa (cylinder test at 28 days)
Post-installed chemical anchor bolts. Hilti HIT-V-8.8 stainless steel+ HIT-HY 200-R (or similar)
FGL varies Nuts ASTM A563M Grade A, hot dip galvanized

2.300
A' Washers & anchor plates ASTM A36 hot dip galvanized
A Bolts ASTM A325
Bituminous
coating (note 8) (*) Cement type in accordance with BS8500-1:2006 and DM Circular 225
Stakeout TOC Footing
point 7. A 100 mm layer of blinding concrete shall be placed beneath all foundations.

8. The outer surface of concrete foundations in contact with soil shall be protected with bituminous
1.150

0.100 coating, according to project specifications.

0.500
0.200
9. Perimeter edges of foundations shall be chamfered (45º angle and 25mm side).

10. All reinforced concrete structures shall comply with the Civilworks Technical Specification and ACI

0.100
318-14. Dimensional tolerances shall be in accordance with ACI-117 "Specifications for tolerances
for concrete construction and materials"

0.250
11. Reinforcing detailing shall comply with the document "NE1-00-EM-EAI-DRW-YC_(C)-00100 Civil
2.100 General Notes, Symbols and Materials" and ACI 318-14.
Structural fill (note 5) Lean concrete
12. Geotechnical parametes considered in calculations:
Allowable bearing pressure: 150 kpa
Friction coefficient soil-foundation: 0.4
Plan view 0.800 0.500 0.800 Soil density: 16 kN/m3
Scale 1:20 Plate bearing tests shall be performed on site to comply with the requirement.
North

Section A-A' 13. Cover reinforcement:


Scale 1:20 - Underground structures: 75mm
- Above ground structures and foundations in contact with lean concrete: 50mm

14. Post installed anchor bolts shall be executed only after all supports have been staked out with the
electrical building in its final location.

Symbols & abbreviations:

Stakeout point
TR&BR Top and Bottom Reinforcement
Footing F7. Electrical building definition FGL Finish Grade Level
TOC Top of Concrete
FFL Finish floor level
Footing Name Dimensions x-y (m) Depth (m) Top reinf. (x) Bottom reinf. (x) Top reinf. (y) Bottom reinf. (y) Skin reinforcement Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) TOS Top of steel
BOS Bottom of steel
F-7 1.550 x 0.400 0.300 Ø12@200 Ø12@200 Ø12@200 Ø12@200 N/A SF - NW 140.544 140.844 N/A SF - NE 149.299 149.599 N/A
References:
SF - W 140.362 140.662 N/A SF - E 149.299 149.599 N/A
NE1-00-EM-EAI-DRW-YC_(C)-00100 Civil General Notes, Symbols and Materials
SF - SW 140.362 140.662 N/A SF - SE 149.299 149.599 N/A
NE1-00-EM-EAI-TSP-YC_(C)-00450 Civilworks Technical Specification
2
NE1-00-EM-EAI-TSP-UW_(C)-00500 Earthworks Technical Specification

NE1-00-EM-EAI-PLN-YC_(C)-00200 CT&PT, Civil Project Criteria

NE1-20-CN-SEC-REP-OOO(G)-00015 SF Soil Investigation Report for PT2

NE1-20-EM-CDI-DRW-YTG_(C)-00103-D Site Levelling of PT2 Plant (SF and rest of the Plant) 2
NE1-03-EM-SCH-DRW-YM_(M)-00001 Steel structure system (ECR) drawing

NE1-03-EM-SCH-DRW-YM_(M)-00003 Stairs and platform drawing

NE1-20-EM-ABE-REP-UBA(C)-00102 SF Electrical Building foundation calculation report

A
Bituminous
0.200 1.150 0.200 coating (note 8) TOC Pedestal TOC Pedestal TOC Pedestal
FGL varies
Pedestal Pedestal
0.300

0.300
Bituminous
0.400

FGL varies TOC Footing coating (note 8) TOC Footing


B
0.100
Stakeout
0.100 0.200
0.300

0.300
point
1.550 0.200
0.100

0.100
A'
0.250

0.250
Plan view
Scale 1:20 02 2020/12/04 Levelling change in Subfield SW IFC LMC FCG MRF DMRG
North
01 2020/07/06 For construction IFC MHG FCG MRF DMRG
Structural fill (note 5) Lean concrete Structural fill (note 5) Lean concrete
0.400 0.750 0.400 Rev. Edition Description: Issue Signature Signature Signature Signature
No.: Date: for: Drawn: Checked: Reviewed: Approved:
0.400 Client: P. Engineer (if applicable):
Stamp: Signature: P.Eng.No:

EPC Contractor:
Section A-A' Section B-B'
Scale 1:20 Scale 1:20

Project: EPC Subcontractor:


NE1-700MW CSP + 250MW PV
Hybrid Project ABENGOA
Scale: PT-2 Solar Field Area Drawing No.:

Title & Subtitles:


NE1-20-EM-ABE-DRW-UBA(C)-00102
1:20 Foundations for Solar Field Sheets: Sheet No.:
Electrical area 09 05
Size:
ECR foundation Int. Drawing No.
A1 Footings F6 & F7
This drawing and the design it covers are the property of Abengoa. They have been Project/Contract number:
merely loaned by express agreement of the borrower, who states that it cannot be
reproduced, copied, loaned, exhibited or used under any circumstances. As an Document status: X For approval. For information.
exception, it can be used in a limited and private way, as long as Abengoa gives
permission to the borrower for using it through a written consent. Critical: Yes X No
Notes:
Footing F8. Electrical building definition 1. All dimensions are in meters, unless otherwise specified.

2. Coordinates are in meters and are referred to Project coordinates system.


Footing Name Dimensions x-y (m) Depth (m) Top reinf. (x) Bottom reinf. (x) Top reinf. (y) Bottom reinf. (y) Skin reinforcement Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) Project coordinates (E= 0.000, N= 0.000) correspond to Dubai Local Transverse Mercator (DLTM)
coordinates (E= 510500.000, N= 2735500.000)
F-8 2.800 x 4.750 0.500 Ø16@200 Ø16@200 Ø16@200 Ø16@200 1Ø12 SF - NW 140.194 140.844 142.394 SF - NE 148.949 149.599 151.149
3. Elevations are in meters and are referred to Dubai Municipality Datum (DMD).
SF - W 140.012 140.662 142.212 SF - E 148.949 149.599 151.149
4. This drawing shall be read in conjuntion with all relevant architectural & civil drawings, and
SF - SW 140.012 140.662 142.212 SF - SE 148.949 149.599 151.149 technical specifications, specially with the drawing "NE1-03-EM-SCH-DRW-YM_(M)-00001"
where connections between building and foundation are described.
2 In case of discrepancy between civil works and other drawings, the Contractor shall refer to the
Engineer to define the order of applicability.

5. Under lean concrete, a 250 mm layer of structural fill compacted to 98% maximum dry density
(ASTM D-1557), according to Earthworks Specification and Soil Investigation Report, shall be
placed.

6. Material properties shall comply with the requirements of Civilworks Technical Specification:
Lean concrete
f'c = 20MPa (cylinder test at 28 days)
Cement type I (*)
Maximum aggregate size: 25mm
Concrete
f'c = 35MPa (cylinder test at 28 days)
Cement type IIIA (*), Portland cement + 36%-65% GGBS
Exposure: S3 / c
Maximum water/cement ratio: 0.37
Minimum cement content: 410 Kg/m3
Maximum aggregate size: 20mm
Structural Steel (profiles and plates):
Hot-rolled steel ASTM A572 Gr 50
TOC Pedestal TOC Pedestal
Reinforcement steel:
Grade B500B, minimum yield strength of 500MPa, as per BS4449:2005
B'
Non-shrink grout / mortar:
2.800 FGL varies f'c = 50MPa (cylinder test at 28 days)
Post-installed chemical anchor bolts. Hilti HIT-V-8.8 stainless steel+ HIT-HY 200-R (or similar)

0.650
1.863 0.937 Bituminous Nuts ASTM A563M Grade A, hot dip galvanized
coating (note 8) Washers & anchor plates ASTM A36 hot dip galvanized
Bolts ASTM A325
TOC Footing
(*) Cement type in accordance with BS8500-1:2006 and DM Circular 225

7. A 100 mm layer of blinding concrete shall be placed beneath all foundations.


0.100

0.500
0.652
0.200 8. The outer surface of concrete foundations in contact with soil shall be protected with bituminous
Column coating, according to project specifications.

0.100
9. Perimeter edges of foundations shall be chamfered (45º angle and 25mm side).

10. All reinforced concrete structures shall comply with the Civilworks Technical Specification and ACI

0.250
318-14. Dimensional tolerances shall be in accordance with ACI-117 "Specifications for tolerances
for concrete construction and materials"
Structural fill (note 5) Lean concrete
11. Reinforcing detailing shall comply with the document "NE1-00-EM-EAI-DRW-YC_(C)-00100 Civil
General Notes, Symbols and Materials" and ACI 318-14.

0.387 0.400 0.300 0.400 1.313 12. Geotechnical parametes considered in calculations:
Allowable bearing pressure: 150 kpa
Friction coefficient soil-foundation: 0.4
Soil density: 16 kN/m3
Section A-A'
Plate bearing tests shall be performed on site to comply with the requirement.
Scale 1:20
13. Cover reinforcement:
- Underground structures: 75mm
- Above ground structures and foundations in contact with lean concrete: 50mm
2.825

14. Post installed anchor bolts shall be executed only after all supports have been staked out with the
4.181

electrical building in its final location.

Symbols & abbreviations:


4.750

Stakeout point
TR&BR Top and Bottom Reinforcement
FGL Finish Grade Level
TOC Top of Concrete
FFL Finish floor level
TOS Top of steel
Stakeout BOS Bottom of steel
point
References:
TOC Column TOC Column
NE1-00-EM-EAI-DRW-YC_(C)-00100 Civil General Notes, Symbols and Materials
Column
NE1-00-EM-EAI-TSP-YC_(C)-00450 Civilworks Technical Specification

NE1-00-EM-EAI-TSP-UW_(C)-00500 Earthworks Technical Specification

NE1-00-EM-EAI-PLN-YC_(C)-00200 CT&PT, Civil Project Criteria

NE1-20-CN-SEC-REP-OOO(G)-00015 SF Soil Investigation Report for PT2

NE1-20-EM-CDI-DRW-YTG_(C)-00103-D Site Levelling of PT2 Plant (SF and rest of the Plant) 2
Pedestal Pedestal
NE1-03-EM-SCH-DRW-YM_(M)-00001 Steel structure system (ECR) drawing
1.273

A A'
NE1-03-EM-SCH-DRW-YM_(M)-00003 Stairs and platform drawing

2.200
NE1-20-EM-ABE-REP-UBA(C)-00102 SF Electrical Building foundation calculation report
0.569

FGL varies
0.587 0.700 1.513

B Bituminous
coating (note 8)
TOC Footing
Plan view
North Scale 1:20
0.100

0.500
0.200

0.100
02 2020/12/04 Levelling change in Subfield SW IFC LMC FCG MRF DMRG
01 2020/07/06 For construction IFC MHG FCG MRF DMRG

0.250
Rev. Edition Description: Issue Signature Signature Signature Signature
No.: Date: for: Drawn: Checked: Reviewed: Approved:
Structural fill (note 5) Lean concrete Client: P. Engineer (if applicable):
Stamp: Signature: P.Eng.No:

1.023 0.500 2.325 0.500 0.402


EPC Contractor:

Section B-B'
Scale 1:20
Project: EPC Subcontractor:
NE1-700MW CSP + 250MW PV
Hybrid Project ABENGOA
Scale: PT-2 Solar Field Area Drawing No.:

Title & Subtitles:


NE1-20-EM-ABE-DRW-UBA(C)-00102
1:20 Foundations for Solar Field Sheets: Sheet No.:
Electrical area 09 06
Size:
ECR foundation Int. Drawing No.
A1 Footing F8
This drawing and the design it covers are the property of Abengoa. They have been Project/Contract number:
merely loaned by express agreement of the borrower, who states that it cannot be
reproduced, copied, loaned, exhibited or used under any circumstances. As an Document status: X For approval. For information.
exception, it can be used in a limited and private way, as long as Abengoa gives
permission to the borrower for using it through a written consent. Critical: Yes X No
Notes:
Footing F9. Electrical building definition 1. All dimensions are in meters, unless otherwise specified.

2. Coordinates are in meters and are referred to Project coordinates system.


Footing Name Dimensions x-y (m) Depth (m) Top reinf. (x) Bottom reinf. (x) Top reinf. (y) Bottom reinf. (y) Skin reinforcement Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) Project coordinates (E= 0.000, N= 0.000) correspond to Dubai Local Transverse Mercator (DLTM)
coordinates (E= 510500.000, N= 2735500.000)
F-9 1.400 x 3.450 0.500 Ø16@200 Ø16@200 Ø16@200 Ø16@200 1Ø12 SF - NW 140.194 N/A 142.394 SF - NE 148.949 N/A 151.149
3. Elevations are in meters and are referred to Dubai Municipality Datum (DMD).
SF - W 140.012 N/A 142.212 SF - E 148.949 N/A 151.149
4. This drawing shall be read in conjuntion with all relevant architectural & civil drawings, and
SF - SW 140.012 N/A 142.212 SF - SE 148.949 N/A 151.149 technical specifications, specially with the drawing "NE1-03-EM-SCH-DRW-YM_(M)-00001"
A' where connections between building and foundation are described.
2 2 In case of discrepancy between civil works and other drawings, the Contractor shall refer to the
Engineer to define the order of applicability.
0.700 0.700
5. Under lean concrete, a 250 mm layer of structural fill compacted to 98% maximum dry density
TOC Column TOC Column (ASTM D-1557), according to Earthworks Specification and Soil Investigation Report, shall be
Column placed.

0.3125
6. Material properties shall comply with the requirements of Civilworks Technical Specification:
Lean concrete
f'c = 20MPa (cylinder test at 28 days)
Cement type I (*)
Maximum aggregate size: 25mm
Concrete
f'c = 35MPa (cylinder test at 28 days)
Cement type IIIA (*), Portland cement + 36%-65% GGBS
Exposure: S3 / c
Maximum water/cement ratio: 0.37
Minimum cement content: 410 Kg/m3
Maximum aggregate size: 20mm
Structural Steel (profiles and plates):

2.200
Hot-rolled steel ASTM A572 Gr 50
Reinforcement steel:
Grade B500B, minimum yield strength of 500MPa, as per BS4449:2005
Non-shrink grout / mortar:
f'c = 50MPa (cylinder test at 28 days)
Post-installed chemical anchor bolts. Hilti HIT-V-8.8 stainless steel+ HIT-HY 200-R (or similar)
Nuts ASTM A563M Grade A, hot dip galvanized
2.825

3.450
Washers & anchor plates ASTM A36 hot dip galvanized
FGL varies Bolts ASTM A325

(*) Cement type in accordance with BS8500-1:2006 and DM Circular 225


Bituminous
coating (note 8) 7. A 100 mm layer of blinding concrete shall be placed beneath all foundations.
TOC Footing
8. The outer surface of concrete foundations in contact with soil shall be protected with bituminous
coating, according to project specifications.
0.100
9. Perimeter edges of foundations shall be chamfered (45º angle and 25mm side).

0.500
0.200
Stakeout 10. All reinforced concrete structures shall comply with the Civilworks Technical Specification and ACI
point 318-14. Dimensional tolerances shall be in accordance with ACI-117 "Specifications for tolerances

0.100
for concrete construction and materials"
Column
11. Reinforcing detailing shall comply with the document "NE1-00-EM-EAI-DRW-YC_(C)-00100 Civil

0.250
General Notes, Symbols and Materials" and ACI 318-14.

12. Geotechnical parametes considered in calculations:


0.3125

Structural fill (note 5) Allowable bearing pressure: 150 kpa


Lean concrete Friction coefficient soil-foundation: 0.4
Soil density: 16 kN/m3
0.500 2.325 0.500 Plate bearing tests shall be performed on site to comply with the requirement.
1.400
0.0625 0.0625
13. Cover reinforcement:
- Underground structures: 75mm
A Section B-B' - Above ground structures and foundations in contact with lean concrete: 50mm
Plan view Scale 1:20
North Scale 1:20
14. Post installed anchor bolts shall be executed only after all supports have been staked out with the
electrical building in its final location.

Symbols & abbreviations:

Stakeout point
TR&BR Top and Bottom Reinforcement
Footing F10. Electrical building definition FGL Finish Grade Level
TOC Top of Concrete
FFL Finish floor level
Footing Name Dimensions x-y (m) Depth (m) Top reinf. (x) Bottom reinf. (x) Top reinf. (y) Bottom reinf. (y) Skin reinforcement Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) TOS Top of steel
BOS Bottom of steel
F-10 2.200 x 2.000 0.500 Ø16@200 Ø16@200 Ø16@200 Ø16@200 1Ø12 SF - NW 140.194 140.844 142.394 SF - NE 148.949 149.599 151.149
References:
SF - W 140.012 140.662 142.212 SF - E 148.949 149.599 151.149
NE1-00-EM-EAI-DRW-YC_(C)-00100 Civil General Notes, Symbols and Materials
SF - SW 140.012 140.662 142.212 SF - SE 148.949 149.599 151.149
NE1-00-EM-EAI-TSP-YC_(C)-00450 Civilworks Technical Specification
2
NE1-00-EM-EAI-TSP-UW_(C)-00500 Earthworks Technical Specification

NE1-00-EM-EAI-PLN-YC_(C)-00200 CT&PT, Civil Project Criteria


TOC Column
NE1-20-CN-SEC-REP-OOO(G)-00015 SF Soil Investigation Report for PT2

NE1-20-EM-CDI-DRW-YTG_(C)-00103-D Site Levelling of PT2 Plant (SF and rest of the Plant) 2
NE1-03-EM-SCH-DRW-YM_(M)-00001 Steel structure system (ECR) drawing
2.200
NE1-03-EM-SCH-DRW-YM_(M)-00003 Stairs and platform drawing

NE1-20-EM-ABE-REP-UBA(C)-00102 SF Electrical Building foundation calculation report

1.550
1.000
1.020

Column
Pedestal Pedestal
2.000

A' TOC Pedestal TOC Pedestal


A

FGL varies
Stakeout

0.650
point
1.000
0.980

Bituminous
coating (note 8)
TOC Footing 02 2020/12/04 Levelling change in Subfield SW IFC LMC FCG MRF DMRG
01 2020/07/06 For construction IFC MHG FCG MRF DMRG

0.100
Rev. Edition Description: Issue Signature Signature Signature Signature
No.: Date: for: Drawn: Checked: Reviewed: Approved:

0.500
0.200 Client: P. Engineer (if applicable):
0.465 0.700 0.575 0.460
Stamp: Signature: P.Eng.No:
0.100

EPC Contractor:
0.250

Plan view
North Scale 1:20 Structural fill (note 5) Lean concrete Project: EPC Subcontractor:
NE1-700MW CSP + 250MW PV
0.265 0.400 0.300 0.400 0.500 0.210 Hybrid Project ABENGOA
0.125 Scale: PT-2 Solar Field Area Drawing No.:

Title & Subtitles:


NE1-20-EM-ABE-DRW-UBA(C)-00102
1:20 Foundations for Solar Field
Section A-A' Sheets: Sheet No.:
Scale 1:20 Electrical area 09 07
Size:
ECR foundation Int. Drawing No.
A1 Footings F9 & F10
This drawing and the design it covers are the property of Abengoa. They have been Project/Contract number:
merely loaned by express agreement of the borrower, who states that it cannot be
reproduced, copied, loaned, exhibited or used under any circumstances. As an Document status: X For approval. For information.
exception, it can be used in a limited and private way, as long as Abengoa gives
permission to the borrower for using it through a written consent. Critical: Yes X No
Notes:
Footing F11. Electrical building definition 1. All dimensions are in meters, unless otherwise specified.

2. Coordinates are in meters and are referred to Project coordinates system.


Footing Name Dimensions x-y (m) Depth (m) Top reinf. (x) Bottom reinf. (x) Top reinf. (y) Bottom reinf. (y) Skin reinforcement Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) Electrical building TOC Footing (m) TOC Pedestal (m) TOC Column (m) Project coordinates (E= 0.000, N= 0.000) correspond to Dubai Local Transverse Mercator (DLTM)
coordinates (E= 510500.000, N= 2735500.000)
F-11 2.200 x 1.900 0.500 Ø16@200 Ø16@200 Ø16@200 Ø16@200 1Ø12 SF - NW 140.194 N/A 142.394 SF - NE 148.949 N/A 151.149
3. Elevations are in meters and are referred to Dubai Municipality Datum (DMD).
SF - W 140.012 N/A 142.212 SF - E 148.949 N/A 151.149
4. This drawing shall be read in conjuntion with all relevant architectural & civil drawings, and
SF - SW 140.012 N/A 142.212 SF - SE 148.949 N/A 151.149 technical specifications, specially with the drawing "NE1-03-EM-SCH-DRW-YM_(M)-00001"
where connections between building and foundation are described.
2 2 In case of discrepancy between civil works and other drawings, the Contractor shall refer to the
Engineer to define the order of applicability.

5. Under lean concrete, a 250 mm layer of structural fill compacted to 98% maximum dry density
TOC Column (ASTM D-1557), according to Earthworks Specification and Soil Investigation Report, shall be
placed.

6. Material properties shall comply with the requirements of Civilworks Technical Specification:
Lean concrete
f'c = 20MPa (cylinder test at 28 days)
Cement type I (*)
Maximum aggregate size: 25mm
1.100 1.100 Concrete
f'c = 35MPa (cylinder test at 28 days)
Cement type IIIA (*), Portland cement + 36%-65% GGBS
Exposure: S3 / c
Maximum water/cement ratio: 0.37
Minimum cement content: 410 Kg/m3
Maximum aggregate size: 20mm
Structural Steel (profiles and plates):
0.950

2.200
Hot-rolled steel ASTM A572 Gr 50
Reinforcement steel:
Column Grade B500B, minimum yield strength of 500MPa, as per BS4449:2005
Non-shrink grout / mortar:
f'c = 50MPa (cylinder test at 28 days)
Post-installed chemical anchor bolts. Hilti HIT-V-8.8 stainless steel+ HIT-HY 200-R (or similar)

1.900
Nuts ASTM A563M Grade A, hot dip galvanized
A A'
Washers & anchor plates ASTM A36 hot dip galvanized
FGL varies Bolts ASTM A325

Stakeout Bituminous (*) Cement type in accordance with BS8500-1:2006 and DM Circular 225
point coating (note 8)
0.950

7. A 100 mm layer of blinding concrete shall be placed beneath all foundations.


TOC Footing
8. The outer surface of concrete foundations in contact with soil shall be protected with bituminous
coating, according to project specifications.
0.100
9. Perimeter edges of foundations shall be chamfered (45º angle and 25mm side).

0.500
0.200
10. All reinforced concrete structures shall comply with the Civilworks Technical Specification and ACI
2.200 318-14. Dimensional tolerances shall be in accordance with ACI-117 "Specifications for tolerances

0.100
for concrete construction and materials"

11. Reinforcing detailing shall comply with the document "NE1-00-EM-EAI-DRW-YC_(C)-00100 Civil

0.250
General Notes, Symbols and Materials" and ACI 318-14.

12. Geotechnical parametes considered in calculations:


Structural fill (note 5) Lean concrete Allowable bearing pressure: 150 kpa
Friction coefficient soil-foundation: 0.4
Soil density: 16 kN/m3
Plate bearing tests shall be performed on site to comply with the requirement.
Plan view 0.850 0.500 0.850
Scale 1:20 13. Cover reinforcement:
North
- Underground structures: 75mm
Section A-A' - Above ground structures and foundations in contact with lean concrete: 50mm
Scale 1:20
14. Post installed anchor bolts shall be executed only after all supports have been staked out with the
electrical building in its final location.

Symbols & abbreviations:

Stakeout point
TR&BR Top and Bottom Reinforcement
Column & pedestal details FGL Finish Grade Level
TOC Top of Concrete
FFL Finish floor level
TOS Top of steel
BOS Bottom of steel

References:

NE1-00-EM-EAI-DRW-YC_(C)-00100 Civil General Notes, Symbols and Materials

NE1-00-EM-EAI-TSP-YC_(C)-00450 Civilworks Technical Specification

NE1-00-EM-EAI-TSP-UW_(C)-00500 Earthworks Technical Specification


TOC Column 0.500
0.400 NE1-00-EM-EAI-PLN-YC_(C)-00200 CT&PT, Civil Project Criteria
3 stirrups 0.150
Ø10@50 NE1-20-CN-SEC-REP-OOO(G)-00015 SF Soil Investigation Report for PT2

0.500 0.400 NE1-20-EM-CDI-DRW-YTG_(C)-00103-D Site Levelling of PT2 Plant (SF and rest of the Plant) 2
12Ø20 NE1-03-EM-SCH-DRW-YM_(M)-00001 Steel structure system (ECR) drawing

NE1-03-EM-SCH-DRW-YM_(M)-00003 Stairs and platform drawing

NE1-20-EM-ABE-REP-UBA(C)-00102 SF Electrical Building foundation calculation report

Column type Pedestal type


A A'
Plan view Plan view
3 stirrups
Scale 1:20 Scale 1:20
Ø10@150

1 stirrup
Ø10@200 TOC Pedestal

3 stirrups 12Ø20
Ø10@150 1 stirrup 8Ø16
Ø10@200
Prepared Prepared B B'
rough surface rough surface
TOC Footing TOC Footing

02 2020/12/04 Levelling change in Subfield SW IFC LMC FCG MRF DMRG


01 2020/07/06 For construction IFC MHG FCG MRF DMRG
Min. 250 Min. 250 Min. 250 Min. 250 Rev. Edition Description: Issue Signature Signature Signature Signature
No.: Date: for: Drawn: Checked: Reviewed: Approved:
Client: P. Engineer (if applicable):
Stamp: Signature: P.Eng.No:

EPC Contractor:
Column type Section A-A' Pedestal type Section B-B'
Reinforcement detail Scale 1:10 Reinforcement detail Scale 1:10
Scale 1:20 Scale 1:20
Project: EPC Subcontractor:
NE1-700MW CSP + 250MW PV
Hybrid Project ABENGOA
Scale: PT-2 Solar Field Area Drawing No.:

Title & Subtitles:


NE1-20-EM-ABE-DRW-UBA(C)-00102
Various Foundations for Solar Field Sheets: Sheet No.:
Electrical area 09 08
Size:
ECR foundation Int. Drawing No.
A1 Footing F11 & column and pedestal details
This drawing and the design it covers are the property of Abengoa. They have been Project/Contract number:
merely loaned by express agreement of the borrower, who states that it cannot be
reproduced, copied, loaned, exhibited or used under any circumstances. As an Document status: X For approval. For information.
exception, it can be used in a limited and private way, as long as Abengoa gives
permission to the borrower for using it through a written consent. Critical: Yes X No
Notes:

Detail A. Columns & beam support. 1. All dimensions are in meters, unless otherwise specified.
F-1 2.950 Table 1. TOS beams 2. Coordinates are in meters and are referred to Project coordinates system.
Holes Ø 18 only Project coordinates (E= 0.000, N= 0.000) correspond to Dubai Local Transverse Mercator (DLTM)
Post-installed chemical anchor bolts: Electrical building TOS (m)
in upper flange coordinates (E= 510500.000, N= 2735500.000)
4M16 Hilti HIT-V (8.8) stainless steel
+ HIT-HY200-R (or similar). SF - NE 151.199 3. Elevations are in meters and are referred to Dubai Municipality Datum (DMD).
W200x100 In all columns.
SF - E 151.199 4. This drawing shall be read in conjuntion with all relevant architectural & civil drawings, and
See detail C See detail C technical specifications, specially with the drawing "NE1-03-EM-SCH-DRW-YM_(M)-00001"
Electrical building frame where connections between building and foundation are described.
Sliding plate SF - SE 151.199
90 (just for reference) In case of discrepancy between civil works and other drawings, the Contractor shall refer to the
400x400x12. Cut in the SF - NW 142.444 Engineer to define the order of applicability.
See detail A upper flange

25
F-2 TOS of beam TOS (See table 1) 5. Under lean concrete, a 250 mm layer of structural fill compacted to 98% maximum dry density
SF - W 142.262
F-3 (ASTM D-1557), according to Earthworks Specification and Soil Investigation Report, shall be
Grouting 25 placed.
W200x59 SF - SW 142.262

130
250

120
Plate 1 6. Material properties shall comply with the requirements of Civilworks Technical Specification:
2
25 Lean concrete
f'c = 20MPa (cylinder test at 28 days)

160
Cut in the Cement type I (*)

25
Detail A bottom flange Maximum aggregate size: 25mm
of beam Concrete
Detail A f'c = 35MPa (cylinder test at 28 days)
100 Post-installed chemical anchor bolts:
Cement type IIIA (*), Portland cement + 36%-65% GGBS
4M16 Hilti HIT-V (8.8) stainless steel Exposure: S3 / c
North & south support beam. + HIT-HY 200-R (or similar). Maximum water/cement ratio: 0.37
Front view Only in the columns of F2-F3-F-10 & Minimum cement content: 410 Kg/m3
Scale 1:25 Column F-11 footings. Maximum aggregate size: 20mm
Structural Steel (profiles and plates):
Detail C Hot-rolled steel ASTM A572 Gr 50
Reinforcement steel:
4M16 bolts Electrical building frame Grade B500B, minimum yield strength of 500MPa, as per BS4449:2005
(just for reference)
Section 1-1'
North support beam Non-shrink grout / mortar:
Scale 1:10
f'c = 50MPa (cylinder test at 28 days)
Post-installed chemical anchor bolts. Hilti HIT-V-8.8 stainless steel+ HIT-HY 200-R (or similar)
Nuts ASTM A563M Grade A, hot dip galvanized
Washers & anchor plates ASTM A36 hot dip galvanized
Post-installed chemical anchor bolts: Bolts ASTM A325
4M16 Hilti HIT-V (8.8) stainless steel
Washer + HIT-HY 200-R (or similar). (*) Cement type in accordance with BS8500-1:2006 and DM Circular 225
F-4 F-5 Double nut In all columns.
Sliding plate 90 7. A 100 mm layer of blinding concrete shall be placed beneath all foundations.
Detail B Detail B
Plate 1 8. The outer surface of concrete foundations in contact with soil shall be protected with bituminous
Beam coating, according to project specifications.
W200x59
W200x59
9. Perimeter edges of foundations shall be chamfered (45º angle and 25mm side).

10. All reinforced concrete structures shall comply with the Civilworks Technical Specification and ACI

100

140
318-14. Dimensional tolerances shall be in accordance with ACI-117 "Specifications for tolerances
Detail B Detail B 1 1'
for concrete construction and materials"

11. Reinforcing detailing shall comply with the document "NE1-00-EM-EAI-DRW-YC_(C)-00100 Civil
180 General Notes, Symbols and Materials" and ACI 318-14.
Plate 1 Plate 1 Post-installed chemical anchor bolts: 4M16
(see detail A) 0.660 1.600 0.660 (see detail A) Hilti HIT-V (8.8) stainless steel
12. Geotechnical parametes considered in calculations:
Holes Ø 18 only + HIT-HY 200-R (or similar)
Allowable bearing pressure: 150 kpa
W200x59 in upper flange Only in the columns of F2-F3-F-10 & F-11
Friction coefficient soil-foundation: 0.4
footings.
0.090 0.090 Soil density: 16 kN/m3
Plate bearing tests shall be performed on site to comply with the requirement.
1.500
0.050 0.050 0.050 0.050 13. Cover reinforcement:
F-6 0.925 0.925 - Underground structures: 75mm
Plan view - Above ground structures and foundations in contact with lean concrete: 50mm
North Scale 1:10
Detail B
North & south support beam. 14. Post installed anchor bolts shall be executed only after all supports have been staked out with the
North Holes beam detail. Top view electrical building in its final location.
Detail B Scale 1:25
Symbols & abbreviations:

Stakeout point
TR&BR Top and Bottom Reinforcement
FGL Finish Grade Level
TOC Top of Concrete
FFL Finish floor level
TOS Top of steel
Detail B. Columns support. BOS Bottom of steel

References:

NE1-00-EM-EAI-DRW-YC_(C)-00100 Civil General Notes, Symbols and Materials


F-8
NE1-00-EM-EAI-TSP-YC_(C)-00450 Civilworks Technical Specification
F-9
NE1-00-EM-EAI-TSP-UW_(C)-00500 Earthworks Technical Specification
Post-installed chemical anchor bolts:
4M16 Hilti HIT-V (8.8) stainless steel NE1-00-EM-EAI-PLN-YC_(C)-00200 CT&PT, Civil Project Criteria
Detail B Sliding plate 90 + HIT-HY 200-R (or similar).
400x400x12
Detail B In all columns. NE1-20-CN-SEC-REP-OOO(G)-00015 SF Soil Investigation Report for PT2
Grouting
NE1-20-EM-CDI-DRW-YTG_(C)-00103-D Site Levelling of PT2 Plant (SF and rest of the Plant) 2
NE1-03-EM-SCH-DRW-YM_(M)-00001 Steel structure system (ECR) drawing
250

120

NE1-03-EM-SCH-DRW-YM_(M)-00003 Stairs and platform drawing

NE1-20-EM-ABE-REP-UBA(C)-00102 SF Electrical Building foundation calculation report


Detail B
Detail B
Sliding plate Plate 1
Column 400x400x12 4 holes Ø18
240x340x15 240
400 4 holes Ø18

Only weld

130
the web

150

340

160
400

100
South support beam Section 2-2'
Scale 1:10

50
150
F-10 F-11 Post-installed chemical anchor bolts:
4M16 Hilti HIT-V (8.8) stainless steel 50 140 50
+ HIT-HY 200-R (or similar). 155 90 155
Detail A Detail A Sliding plate In all columns.
90 02 2020/12/04 Levelling change in Subfield SW IFC LMC FCG MRF DMRG
01 2020/07/06 For construction IFC MHG FCG MRF DMRG

Rev. Edition Description: Issue Signature Signature Signature Signature


No.: Date: for: Drawn: Checked: Reviewed: Approved:
Sliding plate details. Plate 1 details. Client: P. Engineer (if applicable):

North
Plan view Front view Stamp: Signature: P.Eng.No:
Scale 1:10 Scale 1:10
100

2 2'
EPC Contractor:

Project: EPC Subcontractor:


F-7
NE1-700MW CSP + 250MW PV
Hybrid Project ABENGOA
Scale: PT-2 Solar Field Area Drawing No.:

Title & Subtitles:


Support columns & beams. Plan view NE1-20-EM-ABE-DRW-UBA(C)-00102
North Various Foundations for Solar Field
North General plan view. Scale 1:10 Sheets: Sheet No.:
Electrical area 09 09
Scale 1:50 Size:
ECR foundation Int. Drawing No.
A1 Details
This drawing and the design it covers are the property of Abengoa. They have been Project/Contract number:
merely loaned by express agreement of the borrower, who states that it cannot be
reproduced, copied, loaned, exhibited or used under any circumstances. As an Document status: X For approval. For information.