3. Elevations are in meters and are referred to Dubai Municipality Datum (DMD).
4. This drawing shall be read in conjuntion with all relevant architectural & civil drawings and technical
specifications. In case of discrepancy between civil works and other drawings, the Contractor shall
refer to the Engineer to define the order of applicability.
11CFA05 11CFA06 5. Under Lean concrete, a 250 mm layer of structural fill compacted to 98% maximum dry density (ASTM
D-1557), according to Earthworks Specification and Soil Investigation Report, shall be placed.
11CFA04 6. Material properties shall comply with the requirements of Civilworks & Steel Stucture Specifications:
- Lean concrete
f'c = 20MPa (cylinder test at 28 days)
Cement type I (*)
Maximum aggregate size: 25mm
L
- Reinforcement steel:
Grade B500B, minimum yield strength of 500MPa, as per BS4449:2005
- Post installed chemical anchor bolt: Hilti HIT-V-5.8 stainless steel + HIT-HY 200-R (or similar)
- Nuts ASTM A563M Grade A, washer ASTM A36. Hot dip galvanized protection.
G
F
8. All reinforced concrete structures shall comply with the Civilworks Technical Specification and ACI
18-14. Dimensional tolerances shall be in accordance with ACI-117 "Specifications for tolerances for
concrete construction and materials"
All steel works shall conform to the Steel Structure Technical Specification.
E
9. Structure protection shall be according to document: NE1-00-EM-EAI-TSP-YM_(M)-27700 Painting
Technical Specification
10. For connections to earthing network see drawing NE1-10-EM-EAI-DRW-BXE(E)-40100 Typical Erection
Details Earthing Network.
D
11. The outer surface of concrete foundations in contact with soil shall be protected with bituminous
coating, according to project specifications.
12. Perimeter edges of foundations shall be chamfered (45º angle and 25mm side).
C
13. A 100 mm layer of blinding concrete shall be placed beneath all foundations.
14. The minimum allowable ground bearing pressure shall be 0.15 MPa. Plate bearing tests shall be
performed on site to comply with the requirement.
B
16. Concrete works cannot start until all embedded elements for anemometer tower base and sun sensor
foundation are on site (by Geonica).
Abbreviations:
11CFA01 11CFA02 FGL Finish Grade Level Stakeout point
11CFA03 Anemometer PT1 South East corner 4577.900 2821.152 148.45 N/A N/A N/A N/A N/A N/A NE1-03-EM-ABE-DRW-UZA(C)-00001 Typical stairs and ladders
11CFA04 Weather Station PT1 North West corner 503.070 4945.374 139.95 503.070 4941.374 149.45 137.75 136.95 148.25
NE1-03-EM-GEO-DRW-WNY(C)-00003 SEMS Civil Works Diagram
11CFA05 Anemometer PT1 North center 2718.700 4952.374 143.90 N/A N/A N/A N/A N/A N/A
NE1-03-EM-ABE-DRW-WC_(C)-00001 Meteo Station Arrangement in SF
11CFA06 Weather Station PT1 North East corner 4577.900 4952.374 150.55 4577.900 4948.374 160.05 148.35 147.55 158.85
Geotechnical parameters:
Based on the geotechnical report, "NE1-M-EM-SEC-ABE-00004-PT1 soil investigation report-final version",
the following data has been considerated in the design:
6.00
Anemometer tower base Anemometer tower base 05 2020/01/15 Moved 11CFA04 station IFC LMC FCG MRF DMRG
Stakeout point Stakeout point 04 2019/11/26 Foundation increase by SEC requeriments IFC ADSC FCG MRF MRF
(see table 1) (see table 1)
03 2019/11/13 Client comments IFC FCG LMC MRF MRF
02 2019/10/02 Client comments IFC FCG LMC MRF MRF
01 2019/08/22 First issue IFC LEVA LGC LMC MRF
12
12
0°
0°
6.0 6.0
0 0 0 0 Rev. Edition Description: Issue Signature Signature Signature Signature
6.0 6.0 No.: Date: for: Drawn: Checked: Reviewed: Approved:
Client: P. Engineer (if applicable):
120° 120°
Stamp: Signature: P.Eng.No:
4.00
EPC Contractor:
Anchor ring Anchor ring