produced of workable concrete.
3
Arch'l- 03,,, Architectural
0
21
0
4. REINFORCING STEEL BARS 30 03.01 ,,, GRND.FLOOR PLAN
Unless otherwise specified on plain, reinforcing
steel bars shall be deformed bars and in accordance 03.02 ,,, SECOND FLOOR PLAN
00
with the metal reinforcing requirements of standard
38
00 00 03.03 ,,, SECTION THRU "A-A"
specifications on highways and bridges as adopted 40
03.04 ,,, SECTION THRU "B-B" LANDUSE&ZONING
20
by the government. when placed in work, it shall be
00
free dirt, paints, spills of other foreign substance. 03.05 ,,, FRONT ELEVATION
34
0
5. WOOD FORMS:
00
00 03.06 ,,, RIGHT SIDE ELEVATION
Wood forms shall be sound, good quality, free from 20
10
00
large loose knots and otherwise suitable to facilitate 03.07 ,,, REAR ELEVATION
16
finishing exposed concrete as specified. 0
13 03.08 ,,, LEFT SIDE ELEVATION
6. CURING: 20
Use water curing which shall be affected by keeping
the forms at all times sufficiently wet with clean
00
water to prevent the joints in the forms of opening. 06 Arch'l- 04,,, Architectural
13
0
00
protected from the loss of surface moisture by 04.02 ,,, SCHEDULE OF DOORS
46
duration of curing period which shall not less than 7 04.04 ,,, T&B-SECTION
32
days.
04.05 ,,,STAIRCASE 1 PLAN LINE&GRADE
7. EXCAVATIONS FOOTING AND
04.06 ,,,CASE 2 PLAN
FOUNDATIONS:
The bottoms of all excavations for footing and 04.07 ,,,STAIRCASE 2 PLAN
foundation which shall be undisturbed, earth
2
02
ON FILL OR ON GROUND: 01.02 ,,, SECOND FLR. FRAMING PLAN
D
Concrete from steps on fill shall be laid on prepared 00
foundation which shall be placed as follow: 30
LOT 26 BLOCK 14 01.03 ,,, ROOF BEAM FRAMING PLAN
MA O M
The earth or sand fill shall be laid to a uniform
01.04 ,,, TYP. LINTEL BEAM DETAIL
'S
grade below the excavation of the finished floors,
AREA = 201 SQ. M.
4
00
ID
RO
being placed in the layers not exceeding 15cm in 40 00 01.05 ,,, SCHED. OF BEAM
thickness,its layer being thoroughly wetted and
10 ARCHITECTURAL
tampered.The said fill shall be made as concrete 01.06 ,,, TYP. WALL FOOTING DETAIL
walls and foundation shall have sufficient strength.
02
00
00
Concrete floor surface and other surface exposed
D
10
21
after removed of forms shall be kept moist for a Struct'l - 02,,, Structural
period of at least 7 days after being placed. 00 50 02.01 ,,, COLUMN & FOOTING
All concrete placed during hot weather shall be 20 40
PLANS & DETAILS
protected from the rays of the sun and thoroughly
wetted at least three times during the first 7 days.
A PERSPECTIVE 02.02 ,,, WALL FOOTING DETAIL
1 02 SCALE 1:100 M. 02.03 ,,, SLAB DETAIL
00
9. FOUNDATIONS:
34
All foundations shall be Class "A" (1:2:4) concrete 00
mixture with the necessary reinforcement indicated
37 02.04 ,,,STAIR SECTION PLAN
in the plans. All zocalos shall be 0.15m thick 02.05 ,,,TYPICAL RAFTER AND
0
concrete hollow blocks and shall be filled with
CONCRETE GUTTER SECTION
00
0
class "B"(1:3:5) mortar mixture with the necessary 13 50
10
20 67
STRUCTURAL
N
reinforcement as indicated in the plan. 00
10. FLOORINGS: (See Schedule on Plan) 24 Plum - 01,,, Plumbing
01.01 ,,, GRND. FLR PLUMBING
Unless otherwise noted on the plan, all flooring
shall be 0.10m thick concrete slab on fill on LAY-OUT
0 0
compacted gravel with 10mmØ Temp bars spaced 00 01.02 ,,,SECOND FLR. PLUMBING
45
at 0.50m on center bothways. 23
LAY-OUT
11. WALLS:
All exterior and interior walls shall be of concrete 04
00 01.03 ,,,UNDERTAKING
hollow blocks with the necessary reinforcement 60
1 01.04 ,,,PLUMBING SPECIFICATIONS
unless otherwise indicated in the plans. W E
12. CEILING:
A SITE DEVELOPMENT PLAN Plum -,,,CATCH
02,,, Plumbing
0
All ceiling boards shall be of 6mm thick ordinary 37
3 02.01 BASIN DETAIL
plywoodnon 0.05x1.05m ceiling joist spaced at
0.60m on center bothways. 02.02 ,,,SEPTIC VAULT DETAIL
1 01 SCALE 1:100 M.
13. DOORS AND WINDOWS : 02.03 ,,,PLUMBING LEGENDS
(See schedule on Plans) S 02.04 ,,,ISOMETRIC LAY OUT
ELECTRICAL
14. CABINETS: 02.05 ,,,PLUMBING ANALYSIS
All cabinets shall be of ordinary plywood.
All cabinet doors shall be a 12mm thick plywood
and louver as indicated in the follow-up design.
Elect'l - 01,,, Electrical
01.01 ,,, GRND. FLR. LIGHTING
15. ROOFING: TECHNICAL DESCRIPTION SYSTEM LAY-OUT
Unless otherwise noted on the plan, concrete
roofing shall be 0.15m thick and shall be applied of LINES BEARINGS DISTANCES 01.02 ,,,SECOND FLR. LIGHTING
AD
AD T.
S
center bothways. E
LOT 26, BLOCK - 14
RO A
N N
IO AE
SIT
RS J
VE Z
BANKERS VILLAGE ER
E
ST
LO GR
TH
UE SA
EN
AV
All finishing hardwares shall be of first quality brand 20.13 M. SYSTEM LAY-OUT
O
1-2
Parks
GN
and
T.
NI
Playground
S
BE
S
N.
E
CADELVA SUBD.
U
G
WESTWOODS SUBDIVISION
O
R
ER
A
10.00 M.
T
2-3
R
17. PAINTINGS:
O
SYSTEM LAY-OUT
D
SANITARY
C
R
T.
JA
S
T.
A
S
F
PLAZA
RU
A-1
STRUCTURAL ENGINEER contract documents duly signed, stamped or sealed, as instruments of service,
PROPOSED TWO STOREY OFFICE BUILDING MRS. EVE ENOJAS
are the intellectual property and documents of the architect, whether the PERSPECTIVE,
object
for which they are made is executed or not. It shall be unlawful for any person
VICINITY MAP, &
REG. NO.: 67660 PLACE: ILOILO CITY TIN #: to duplicate to make copies of said documents for use in the repetition ofLOTand DESCRIPTION
for other projects or buildings, whether executed partly or in whole, without the
PTR NO.: 5684473 DATE: 01/03/18 158-702-854 LOCATION : SAN DIONISIO, ILOILO APPROVED written consent of architect or author of said documents.