1. GENERAL DESCRIPTION OF WORK: 19.

PLUMBING: REPUB LIC OF THE PHILIPPINES


The work to be done and executed shall include
the furnishing of labor and materials, equipment (See Addt'l Specifications on Plans) EARTH CHANGE NOTES: DRAWING INDEX
and specialized work in the construction of the All plumbing installation shall conform C I T Y E N G I N E E R S' O F F I C E
house completely as shown in the drawing and as with National Plumbing Code of the 1.0 STRIP ALL TOP SOIL IN CONSTRUCTION AREA AND STOCKPILE
specified herein. All reference to details and plans 2.0 TREES SHALL BE RETAINED AND PROTECTED DURING CONSTRUCTION Arch'l- 01,,, Architectural
Philippines. All pipings and 01.01 ,,, PERSPECTIVE
in the specifications, when not included in the set
of drawings,shall furnished later upon the request.
fixtures shall be of good quality brand ap WHENEVER POSSIBLE. 01.02 ,,, SITE DEV. PLAN
2. PROPORTION OF CONCRETE: proved by the Architect and the Owner(s). 3.0 ALL EXCESS MATERIAL SHALL BE GRADED EVENLY THROUGHOUT AREA
01.03 ,,, LOCATION PLAN
All concrete work shall be done on strict accordance
20. LANDSCAPE AND INTERIOR DESIGNS: SCARED BY CONSTRUCTION STOCKPILED.
with the Dept. of Public Works specifications for 01.04 ,,, EARTH CHANGE NOTES
4.0 TOP SOIL SHALL BE GRADED EVENLY THROUGHOUT CONSTRUCTION AREA.
concrete and revised proportioning as follows: Landscape and Interior designs shall be 01.05 ,,, LOT DESCRIPTION
Use Class A (1:2:4) concrete mixture, unless approved by the Architects and the Owner(s). 5.0 ADDITIONAL FRUIT AND ORNAMENTAL TREES SHALL BE ENCOURAGED.
otherwise for footings, beams, columns, steps and 6.0 BUSH BERM ALONG EDGE OF CONSTRUCTION AREA TO PREVENT EROSION.
floors.Use Class B (1:2.5:5) concrete mixture,
7.0 SOIL TYPE ___________________________ Arch'l- 02,,, Architectural ILOILOCITY
unless otherwise specified for all thicker than 02.01 ,,, PERIMETER FENCE LAYOUT
100mm steps on fill, floor slabs on fill, concrete wall, 8.0 ZONING DISTRICT _____________________________________
02.02 ,,, FRONT ELEVATION
concrete drainage and catch basin, and other
works of similar nature. 02.03 ,,, RIGHT SIDE ELEVATION
3. CONSISTENCY: 02.04 ,,, FENCE COLUMN/FOOTING DET.
It is being recognized that an excess of water 02.05 ,,, FENCE WALL FOOTING DET.
seriously reduces the strength of concrete, the 0 0
mixture shall be made as dry as possible to 30

00
produced of workable concrete.

3
Arch'l- 03,,, Architectural
0

21
0
4. REINFORCING STEEL BARS 30 03.01 ,,, GRND.FLOOR PLAN
Unless otherwise specified on plain, reinforcing
steel bars shall be deformed bars and in accordance 03.02 ,,, SECOND FLOOR PLAN

00
with the metal reinforcing requirements of standard

38
00 00 03.03 ,,, SECTION THRU "A-A"
specifications on highways and bridges as adopted 40
03.04 ,,, SECTION THRU "B-B" LANDUSE&ZONING
20
by the government. when placed in work, it shall be

00
free dirt, paints, spills of other foreign substance. 03.05 ,,, FRONT ELEVATION

34
0
5. WOOD FORMS:

00
00 03.06 ,,, RIGHT SIDE ELEVATION
Wood forms shall be sound, good quality, free from 20

10

00
large loose knots and otherwise suitable to facilitate 03.07 ,,, REAR ELEVATION

16
finishing exposed concrete as specified. 0
13 03.08 ,,, LEFT SIDE ELEVATION
6. CURING: 20
Use water curing which shall be affected by keeping
the forms at all times sufficiently wet with clean

00
water to prevent the joints in the forms of opening. 06 Arch'l- 04,,, Architectural

13
0

Concrete surface not protected by forms shall be


84 04.01 ,,, SCHEDULE OF WINDOWS
0
45

00

protected from the loss of surface moisture by 04.02 ,,, SCHEDULE OF DOORS
46

covering with craft paper quilts or burlaps. Protected


materials shall be kept thoroughly wet for the 04.03 ,,, T&B-PLAN
00

duration of curing period which shall not less than 7 04.04 ,,, T&B-SECTION
32

days.
04.05 ,,,STAIRCASE 1 PLAN LINE&GRADE
7. EXCAVATIONS FOOTING AND
04.06 ,,,CASE 2 PLAN
FOUNDATIONS:
The bottoms of all excavations for footing and 04.07 ,,,STAIRCASE 2 PLAN
foundation which shall be undisturbed, earth
2

properly leveled off, tampered and approved by 24


47
the Architect. Excavations shall be entirely free
from water during the pouring of concrete.
Struct'l - 01,,, Structural
8. CONCRETE FLOORS AND STEPS 01.01 ,,, FOUNDATION PLAN

02
ON FILL OR ON GROUND: 01.02 ,,, SECOND FLR. FRAMING PLAN

D
Concrete from steps on fill shall be laid on prepared 00
foundation which shall be placed as follow: 30
LOT 26 BLOCK 14 01.03 ,,, ROOF BEAM FRAMING PLAN

MA O M
The earth or sand fill shall be laid to a uniform
01.04 ,,, TYP. LINTEL BEAM DETAIL

'S
grade below the excavation of the finished floors,
AREA = 201 SQ. M.

4
00

ID
RO
being placed in the layers not exceeding 15cm in 40 00 01.05 ,,, SCHED. OF BEAM
thickness,its layer being thoroughly wetted and
10 ARCHITECTURAL
tampered.The said fill shall be made as concrete 01.06 ,,, TYP. WALL FOOTING DETAIL
walls and foundation shall have sufficient strength.

02

00
00
Concrete floor surface and other surface exposed

D
10

21
after removed of forms shall be kept moist for a Struct'l - 02,,, Structural
period of at least 7 days after being placed. 00 50 02.01 ,,, COLUMN & FOOTING
All concrete placed during hot weather shall be 20 40
PLANS & DETAILS
protected from the rays of the sun and thoroughly
wetted at least three times during the first 7 days.
A PERSPECTIVE 02.02 ,,, WALL FOOTING DETAIL
1 02 SCALE 1:100 M. 02.03 ,,, SLAB DETAIL

00
9. FOUNDATIONS:

34
All foundations shall be Class "A" (1:2:4) concrete 00
mixture with the necessary reinforcement indicated
37 02.04 ,,,STAIR SECTION PLAN
in the plans. All zocalos shall be 0.15m thick 02.05 ,,,TYPICAL RAFTER AND

0
concrete hollow blocks and shall be filled with
CONCRETE GUTTER SECTION

00
0
class "B"(1:3:5) mortar mixture with the necessary 13 50

10
20 67
STRUCTURAL
N
reinforcement as indicated in the plan. 00
10. FLOORINGS: (See Schedule on Plan) 24 Plum - 01,,, Plumbing
01.01 ,,, GRND. FLR PLUMBING
Unless otherwise noted on the plan, all flooring
shall be 0.10m thick concrete slab on fill on LAY-OUT

0 0
compacted gravel with 10mmØ Temp bars spaced 00 01.02 ,,,SECOND FLR. PLUMBING

45
at 0.50m on center bothways. 23
LAY-OUT
11. WALLS:
All exterior and interior walls shall be of concrete 04
00 01.03 ,,,UNDERTAKING
hollow blocks with the necessary reinforcement 60
1 01.04 ,,,PLUMBING SPECIFICATIONS
unless otherwise indicated in the plans. W E
12. CEILING:
A SITE DEVELOPMENT PLAN Plum -,,,CATCH
02,,, Plumbing
0
All ceiling boards shall be of 6mm thick ordinary 37
3 02.01 BASIN DETAIL
plywoodnon 0.05x1.05m ceiling joist spaced at
0.60m on center bothways. 02.02 ,,,SEPTIC VAULT DETAIL
1 01 SCALE 1:100 M.
13. DOORS AND WINDOWS : 02.03 ,,,PLUMBING LEGENDS
(See schedule on Plans) S 02.04 ,,,ISOMETRIC LAY OUT
ELECTRICAL
14. CABINETS: 02.05 ,,,PLUMBING ANALYSIS
All cabinets shall be of ordinary plywood.
All cabinet doors shall be a 12mm thick plywood
and louver as indicated in the follow-up design.
Elect'l - 01,,, Electrical
01.01 ,,, GRND. FLR. LIGHTING
15. ROOFING: TECHNICAL DESCRIPTION SYSTEM LAY-OUT
Unless otherwise noted on the plan, concrete
roofing shall be 0.15m thick and shall be applied of LINES BEARINGS DISTANCES 01.02 ,,,SECOND FLR. LIGHTING
AD

water proofing. Temp bars spaced at 0.50m on SYSTEM LAY-OUT


RO

AD T.
S

center bothways. E
LOT 26, BLOCK - 14
RO A
N N
IO AE

SIT
RS J
VE Z
BANKERS VILLAGE ER

01.03 ,,, GRND. FLR. POWER


DI PE IV

E
ST
LO GR

16. FINISHING HARDWARES:


WE LO

TH
UE SA
EN
AV

All finishing hardwares shall be of first quality brand 20.13 M. SYSTEM LAY-OUT
O

1-2
Parks
GN
and
T.

NI
Playground
S

BE
S

N.
E

acceptable to the Architect and the Owner(s).


SE
LL

01.04 ,,,SECOND FLR. POWER


E

CADELVA SUBD.
U
G

WESTWOODS SUBDIVISION
O
R

ER
A

10.00 M.
T

2-3
R

17. PAINTINGS:
O

SYSTEM LAY-OUT
D

SANITARY
C
R

T.
JA

S
T.
A
S
F

All concrete walls shall received at least two coats PN H C


PLAZA

20.13 M. 01.05 ,,, ELECTRICAL SYMBOLS


of approved cement paint. All exposed lumber shall JARO 3-4
received at least three coats of semi gloss paints 01.06 ,,,RISER DIAGRAM
or varnish as per specifications of the Architects. 4-1 10.00 M.
N TAFT STREET
01.07 ,,,SPICICATION
AY

18. ELECTRICAL: ABETO STREET


NW

PLAZA
RU

(See Addt'l Specifications on Plans) W E


ILOILO
AIRPORT
Elect'l - 02,,, Electrical
All electrical installations shall conform SM
CITY
TIE LINE: 02.01 ,,, DESIGN ANALYSIS
VICINITY MAP
with the latest National Electrical Code S FROM MON NO. 34, CAD.8 02.02 ,,,SCHEDULE OF LOADS
of the Philippines and with the approval AGONOA CADASTRE THENCE.
02.03 ,,,VOLTAGE DROP & SHORT
of local Electrical Utility Company. 1167.22 M.
All electrical wiring and fixtures shall CIRCUIT CURRENT CALCULATION
be of good quality brand approved by LOT DESCRIPTION
the Architect and the Owner(s).
MECHANICAL
CERTIFIED BY : PROJECT TITLE : OWNER : REPUBLIC ACT 9266: SHEET CONTENTS: SHEET NO.:
ENGR. NEIL EDWIN R. ESCALONA Article 4 section 33 , stipulates that all drawings and specifications and other
MR. ERNIE ENOJAS & SITE DEVELOPMENT PLAN,

A-1
STRUCTURAL ENGINEER contract documents duly signed, stamped or sealed, as instruments of service,
PROPOSED TWO STOREY OFFICE BUILDING MRS. EVE ENOJAS
are the intellectual property and documents of the architect, whether the PERSPECTIVE,
object
for which they are made is executed or not. It shall be unlawful for any person
VICINITY MAP, &
REG. NO.: 67660 PLACE: ILOILO CITY TIN #: to duplicate to make copies of said documents for use in the repetition ofLOTand DESCRIPTION
for other projects or buildings, whether executed partly or in whole, without the
PTR NO.: 5684473 DATE: 01/03/18 158-702-854 LOCATION : SAN DIONISIO, ILOILO APPROVED written consent of architect or author of said documents.