No commitment from senior EHS disciplines delegated to Evidence of active senior Evidence of a positive EHS
management line managers – no direct management involvement in culture in senior
involvement by senior EHS aspects management and at all
management levels
A policy statement exist but A policy statement exists EHS policy establishes Policy with clearly
responsibility for EHS is with clear responsibility for responsibility for EHS in established responsibility
unclear EHS but not in a widely languages easily and accountability; is
distributed document understood, but not widely distributed to all employees;
distributed and is visible on notice
boards
Section 3: Organization, Responsibilities, Resources, Standards and Documentation
EHS communication and meeting programmes: Item 3(1)
No EHS training established EHS training established but EHS training established and EHS training established
not implemented implemented but only to a and fully implemented to all
limited staff only staff related to the work
Section 3: Organization, Responsibilities, Resources, Standards and Documentation (cont’d)
Employee competency and EHS training: Item 3(3)(a) – (d)
No formal programme Formal program established Formal program established Formal program established
to update employee and implemented for and implemented for
knowledge on EHS. Verbal employee and new employee and new
instructions on company employee on EHS. Update employee knowledge on
procedures only for new employee knowledge on EHS. Employee handbook
employees but no on-the job EHS. Employee handbook provided and supervisor
orientation by supervisor provided and supervisor outlines, explains and
outlines, explains and demonstrates new
demonstrates new employee’s job. With:
employee’s job follow-up observation of the
new employee’s work is
No specialized EHS training Specialized EHS training Specialized EHS training Specialized EHS training
established established but not established and established and
implemented implemented implemented on a regular
basis. Retraining periods
are established. Qualified
EHS professional are
employed
No assessment program for Assessment program and Assessment program and Assessment program and
subcontractor established standards for subcontractor standards for subcontractor standards for subcontractor
are established, covering are established and are established and fully
limited area only but not implemented implemented. Quality
implemented yet, assurance for compliance in
place
No EHS performance EHS performance standards EHS performance standards EHS performance
standards available established for limited established and in standards established and
purposes only or partial and compliance with local in compliance with local and
in compliance with local industry regulatory standards global industry regulatory
industry regulatory standards standards
only
Company’s EHS system Company’s EHS system Company’s EHS system Company’s EHS system has
does not included hazards makes reference to the need includes methods for the a comprehensive set of
and effects assessment to assess hazards and assessment of major methods for the assessment
effects but has no hazards and effects of all EHS hazards and
comprehensive structure to effects and applies the to all
carry this out of its contracts with
documentation
Company does not actively Company advise the Company has formal Company has a set of
advise the workforce nor workforce of the major methods for monitoring formal methods for
monitor exposure hazards that they are likely exposure to the major monitoring exposure to all
to be exposed to but only hazards foreseeable hazards (linked
monitors exposure randomly to its hazards and effects
assessment method) and
applies them to all contracts
Basic PPE provided to PPE requirements formally PPE requirements formally Procedures in place to
personnel but no corporate assessed but little effort assessed with spot checks assess all PPE
procedure for assessing made to ensure correct on usage requirements monitor and
individual needs usage enforce usage and
replacement needs. Stock
Company has no formal Company has general Company has procedures for Company has a formal
methods for the control of procedures for waste the disposal of each of the system for waste
waste disposal main categories of site management (including
wastes but makes no identification, minimization
provision for minimizing and classification), which
environmental impact actively seek to minimize
environmental impact
No alcohol and drugs policy An alcohol and drugs policy An alcohol and drugs policy Drugs policy with clearly
written statement exists but not in a includes establishing established responsibility
widely distributed document responsibility and accountability , and
accountability, and widely disciplinary clause is
distributed distributed to all employees;
and is visible on notice
boards
No EHS procedures / Basic EHS procedures / Contractor has written EHS Contractor has procedures
manual is available manual exist procedure / manual to cover to cover all EHS precaution /
all hazardous operations manual typical contractor
EHS plan requirements with
a system of updating and
dissemination to employees
No special attention paid to Importance of transport Company has a general Company has a complete
transport safety as an area safety acknowledged but left management strategy with strategy and set of plans
of hazardous activities to core business manager / some procedures for its and procedures covering
supervisors to enact competent issues vehicles, drive and
individually operations management
No system for formally Informal / incidental Company has a system for Company has a
monitoring HSE performance monitoring HSE performance monitoring HSE performance comprehensive system for
at all only in key areas monitoring performance in
No formal program Periodic safety meetings for Safety meetings performed Safety meetings
special operations only on a regularly scheduled performance in a regularly
basis with the supervisor or basis and employees are
safety representative assigned topics to discuss
on a rotational basis
HSE Performance records (Latest year injury rate comparison to contractor’s three preceding years average): Items 6(3) (a) –
(b)
Contractor supplied Rate is not improving Shows only minor rate Rate steadily improving by
insufficient information to improvement more than 20 per cent per
establish rate or rate year
increases
Procedure are available but Procedure are available and Procedure are available and As in C but with the
Findings not generally Findings communicated to Findings communicated to additional of details of
communicated key personnel only via all employees via specific implication for improving
limited company internal company notice HSE performance
memo or similar media
Audit process is cursory only Company EHS documents Company EHS documents As in C but additionally
– EHS documents are not include reference to auditing include detail of how auditing specifies management’s role
explicit about auditing but there are no specific is to be implemented with in audit and follow-up on
details about scheduling and schedules/coverage for the action items
coverage key areas
Contractor :
Address :
Date :
Contractor Safety Contract :
Phone :
Circle the number, which best represents this evaluation based on the criteria for
rating purposes attached
SUBTOTAL X1/3
SECTION 6 – IMPLEMENTATION AND
PERFORMANCE MONITORING
SECTION 6 – ITEM 6 (1) 0 4 8 12
SECTION 6 – ITEM 6 (2) (A) – (B) 0 4 8 12
SECTION 6 – ITEM 6 (3) (A) – (D) 0 4 8 12
SECTION 6 – ITEM 6 (4) (A) – (C) 0 4 8 12
SUBTOTAL X1/4
SECTION 7 – AUDIT AND REVIEW 0 3 7 10
SUBTOTAL X1
SECTION 8 – EMERGENCY RESPONSE 0 3 7 10
PROCEDURE
SUBTOTAL X1
TOTAL RATING (SECT1-SECT9)
SUMMARY
The numerical values below are the weighted ratings calculated above. The total represents the overall score for the
Contractor.
TOTAL RATING *)
EVALUATED BY:
*) FOR A BIDDER TO QUALIFY AS ACCEPTABLE, THE TOTAL RATING MUST BE EQUAL OR MORE THAN
64. IF INSUFFICIENT NUMBERS OF Bidders ARE QUALIFIED, SELECTION SHALL BE MADE FROM THE FIVE
BIDDERS HAVING THE HIGHEST TOTAL RATING, PROVIDED THAT THE PRIMARY FACTORS THEREOF
MUST BE THE HIGHEST RELATIVE TO THE OTHER BIDDERS'PRIMARY FACTORS.
Date:
Inspector:
Contract No:
Subject:
INSPECTION RESULT
Evaluated Items Min. Req. Inspect. Result Remarks
Date :
Project Period :
Job Title :
Contract No. :
Work Location :
Address :
1.9.9. Other ?
2.2.1. Housekeeping?
2.2.3. Chemicals?
2.10. Other ?
Date :
Period :
Job Title :
Contract No. :
Work Location :
Contractor’s Name :
Address :
Poor Excellent
Housekeeping (Rating) 1 2 3 4 5 6 7 8 9 10
V. Hazard Communication
5.1 Written program
5.2 List of hazardous chemicals
5.3 MSDS file maintained
5.4 Chemicals properly labelled
5.5 Emergency spill control materials
available
Hazard Communication (Rating) Poor Excellent
1 2 3 4 5 6 7 8 9 10
VI. Hazardous material (Waste, Lead, Asbestos, Radioactive, Explosive)
6.1 Site specific health and safety plan
6.2 Employees trained, certified, licensed
XII. Ladders
12.1 Appropriate for use
12.2 Non-slip safety feet
12.3 Ladder tied off
12.4 Ladders long enough for use
XIV. Excavations
14.1 Competent person on-site
14.2 Employee protection from cavies
14.3 Egress w/in 25” (7,6 m) of employees
14.4 Air monitoring over 4” (1,2 m)
14.5 Material 2” (0.6 m) from edge
14.6 Underground installations located,
14.7 Excavations properly barricaded
14.8 Employees not exposed to falling loads
14.9 Bridges/walkways w/ standard rails
Excavations (Rating) Poor Excellent
1 2 3 4 5 6 7 8 9 10
SAFETY INSPECTION CHECKLIST
Date :
Period :
Job Title :
Contract No. :
Work Location :
Contractor’s Name :
Address :
Date :
Period :
Job Title :
Contract No. :
Work Location :
Contractor’s Name :
Address :
5 Hazard Communication
6 Hazardous Material
8 Electrical Safety
10 Compressed Gases
11 Confined Spaces
12 Ladders
13 Scaffolds
14 Excavations
15 Mechanized Equipment
17 Wall Opening
2 Safety Inspections
3 Safety Promotion
4 Supervisory/Employee Safety
Communication
Name/Title
Signature/Date
Date :
Period :
Job Title :
Contract No. :
Work Location :
Contractor’s Name :
Address :
5 Hazard Communication
6 Hazardous Material
8 Electrical Safety
10 Compressed Gases
11 Confined Spaces
12 Ladders
13 Scaffolds
14 Excavations
15 Mechanized Equipment
17 Wall Opening
2 Safety Inspections
3 Safety Promotion
4 Supervisory/Employee Safety
Communication
Name/Title
Signature/Date