1 Purpose of the Method Statement......................................................................................................1
2 Scope of Works....................................................................................................................................2
2.1 Scope...........................................................................................................................................2
2.2 Description of Activity (ies) to be undertaken.............................................................................2
3 Personnel and Responsibilities............................................................................................................5
3.1 Construction Manger...................................................................................................................5
3.2 Discipline (etc.) Supervisor..........................................................................................................5
3.3 HSE Advisor..................................................................................................................................5
3.4 Worker team................................................................................................................................5
4 Resources............................................................................................................................................6
4.1 Personnel.....................................................................................................................................6
4.2 Plant and Equipment...................................................................................................................6
5 Execution of Works..............................................................................................................................7
5.1 PTW Issuance.....................................................................................................................................7
5.2 Safety Setup.......................................................................................................................................7
5.3 Site Works...........................................................................................................................................7
Daily check...............................................................................................................................................7/8
1 Purpose of the Method Statement
The purpose of this methodology is to provide systematic control and direction for the activity for
Installation of the HVAC system.
This method statement provides the expectation to execute work in a safe, eco-friendly manner and
compliance with the ADCO HSE and Quality Requirements.
2 Scope of Works
2.1 Scope
Installation for HVAC system
2.2 Description of Activity (ies) to be undertaken
A) All the duct supports to be installed in advance .
B) Installation and assembly of the HVAC sectors (Galvanized Sheet Metal ).
C) Fix the gaskets for all flanges .
D) Connect the sectors each to other by using bolts and nuts.
E) Insulation Material to be applied on the ducts after kill all the gaps for the joints – Mineral Glass Wool
(Vapor Barrier).
F) The Galvanized Cladding Sheet Metals to be installed by using the rivets .
Figure 1
Figure 2
3.2 Supervisor:
The Supervisor shall be responsible for controlling the manpower following the site supervisor`s
instructions, to ensure that the qualified workers with the right tools are assigned to each work post.
He shall be responsible for the implementation of the work following Al Bilal Health, Safety, and
Environmental plans and procedures, method statements, and requirements stipulated by Job
Hazard Analysis. He shall participate in the specific toolbox talks and ensure participation of the work
team as well. He shall also be responsible for the use of correct personnel protective equipment at
all times.
4 Resources
4.1 Personnel
Around 6 guys shall be deputed to carry out this work.
5 Execution of Works
• Arrange the required safety signs, barricades, and other related safety precautions
Highlighted in the JHA, isolation certificate, and permit before the commencement.
• The works shall only commence after the job supervisor has checked and ensured that all safety
precautions and safety requirements are in place.
• Ensure workers understand the hazards and control measures related to the critical activities,
• Qualified First Aider must be on-site and identified by a sticker on his helmet.
Daily check
(b) Any temporary bracing, shoring, or propping is tight, stable, and secure.
(c) All fire and safety services are operational and all other services to the working level
have been properly disconnected.
5.3.2Before leaving
a) Housekeeping.
b) Lines of communication to the supervisor are clear and operational.
c) Close PTW