1. Purpose of the Method of Statement 

he rationale of this Method Statement is to describe the steps involved in gypsum board installation to 
wall as drywall and partition all in accordance with approved shop drawings, ensuring safety, perfection 
and durability.   

2. Description of Work 

a. The work includes covering of wall partition and drywall as well as false columns and other 
design specified in the plan as to cover the ceiling with the desired dimension, elevations and levelness 
all in accordance with the shop drawings. 

b. Standard accessories required in gypsum wall include the required wall studs and blind rivets 
that will fasten to the concrete wall or bare wall. With enough black screw to tighten the gypsum board 
to the steel framing lay according t the layout specified. 

3. Delivery, Storage and Handling 

a. To reduce the risk of damage, plasterboard should be delivered to site just prior to 
installation.  During handling and storage, sheets should be carried in an ‘upright’ position with 
particular care taken to protect the edges. 

b. Plasterboard should be stored in neat, flat stacks off the ground/floor in a dry covered area. 
This will prevent sagging and minimize damage to board edges and surfaces. 

c. All metal framings shall be delivered to site without any damages and any sign of corrosion. 
Protect metal framing and lathing materials from corrosion and damage. Store in dry, ventilated space, 
off the ground. Deliver in manufacturer's unopened containers or bundles, fully identified with name, 
brand, type, and grade. 

4. Equipment & Tools 

Below is the equipment involved in the suspended ceiling works: 

 Cut‐off Machine / Grinder with Metal cutting blade 
 Drills with proper Drill bits & Screw bits 
 Snipping Tools & Riveter 
 Level tools (Laser level/ Hose Level/ Level Bar ) 
 Metal Cutter 
 Spatula 
 Ramset 
 Wrench  
 


 
ICV DESIGN & BUILDERS
151 E. Santos St. San Joaquin,
Pasig City Philippines 1601
Tel Nos. 632-86280725
Mobile No. 639178098229 / 639190927204
 
 
 The capacity / size of the above equipment shall be judged in accordance with site conditions, 
requirements, and availability at the time of execution.  
 All the above tools or equipment will be operated by skilled labors, and will be checked and 
maintained regularly by our supervisor. 
 
 
7. Drywall Installation 
 

 
 
 
 
 
 
 
 
 
 


 
ICV DESIGN & BUILDERS
151 E. Santos St. San Joaquin,
Pasig City Philippines 1601
Tel Nos. 632-86280725
Mobile No. 639178098229 / 639190927204
 
 
8. Installation of Drywall Partition 
 
a. Framing Installation  
 
 Prior to installing plasterboard, building should be thoroughly checked to ensure that the 
existing structure / framing where the metal framing will be attached are properly plumbed, 
leveled and square.  Other trades have finished their ‘rough‐ins’ penetration on adjoining slab 
and wall. 
 Provide layout of wall partition on the floor & ceiling indicating location of frames (center of 
frame or finish line of wall) Adjustment will be made on site according to the layout made. 
 Install the top & bottom Track using appropriate fastener where applicable. Concrete nail or 
Ramset fastener to fix on the slab, Screw or nail on wooden parts 
 

 
                                           
 
 FLOOR        HEAD                                       
              Allow extra length fastener for attaching thru any installed linings. 
 When fixing to concrete, provide damp proof membrane underneath no less than 10mm wider 
than the track width. 
 Joints in track shall be butt jointed – if fixed to concrete provide 2mm gap between ends to alow 
for shrinkage. 
 Check & verify location of doors, windows and other openings prior to installation of Vertical 
frames. Plumb base layout projecting to ceiling. 
 
STUD INSTALLATION 
 For standard installation insert the studs into the top and floor tracks and twist to lock as shown. 

                                                     
 


 
ICV DESIGN & BUILDERS
151 E. Santos St. San Joaquin,
Pasig City Philippines 1601
Tel Nos. 632-86280725
Mobile No. 639178098229 / 639190927204
 
 
 Perimeter studs must be fixed with the web(back) against the wall. All other studs are to the 
face in the same direction. 
 

                                      
 
 The spacing of studs, joists or battens takes into account the spacing required shall be 610mm 
(24”) Vertical spacing x 406mm (16”) Horizontal spacing.  When the installation is completed, 
the plasterboard will comply with the required level of finish. Adjust vertical studs on all the 
openings once it is set and finalize. 
 For corner, junctions, wall ends etc. it is recommended to use extra studs. This can be by 
“boxing” the Stud. 
 Studs may be held in place by the grip” of the track or mechanically fastened by crimping or pop 
rivets or fastener in non‐fire rated partitions, single or multi‐level buildings. For Fire rated 
partitions may use light locating fasteners that fail at high temperature such as alum rivet id 
necessary. 


 
ICV DESIGN & BUILDERS
151 E. Santos St. San Joaquin,
Pasig City Philippines 1601
Tel Nos. 632-86280725
Mobile No. 639178098229 / 639190927204
 
                             

   
 


 
ICV DESIGN & BUILDERS
151 E. Santos St. San Joaquin,
Pasig City Philippines 1601
Tel Nos. 632-86280725
Mobile No. 639178098229 / 639190927204
 
 Maximum deviations in the bearing surface of the finished framing do not exceed the maximum 
tolerances allowed for the required Level of Finish. Where these tolerances are exceeded, a 
suitable levelling system should be used. 
 Noggings supporting services such as taps and cisterns do not protrude beyond the face of the 
framing 
 All openings are framed and ceiling perimeter battens are installed where required 
 Trimmers are installed where primary ceiling support members such as girders, trusses and 
joists, change direction within a room 
 All contact surfaces are dry, clean and free from foreign materials such as oil, grease and dirt 
 Plumbing and electrical services have been installed and do not protrude beyond the face of the 
framing 
 The area is weatherproof. 
 
b. Plasterboard Installation 
 
• Carefully plan installation. Sheets should be set out to ensure best coverage and to minimize 
butt joints and waste.  As the face of a steel stud can deflect initially, the correct sequence of attaching 
the board is important. The first board shall be attached to the open side of the stud.  The face will 
deflect slightly then will pull tight against the board. Support the stud to avoid twisting and fully screw 
the board to the stud before continuing. The next sheet can now be screwed to the closed side of the 
stud. Deflection will be minimal as the first sheet helps keep rigid assembly and the result is a correct 
flat joint. 

                                     
 
• Plasterboard fixing sequence shall be as shown on the figure below. They will be fixed in the 
sequence as shown A B C D. When installing the first side (a & B) fasten the board at the edges only (1 & 
2). The center must not be fastened until the 2nd side (C & D) have been installed. Located board joints 
on each side of the wall on alternate studs. Screws shall be fastened in sequence 1‐6. Correct sequence 
will minimize any mis alignment problems and result in higher quality finish. 
 

 
 


 
ICV DESIGN & BUILDERS
151 E. Santos St. San Joaquin,
Pasig City Philippines 1601
Tel Nos. 632-86280725
Mobile No. 639178098229 / 639190927204
 
 
 
 
• Where possible, sheets should run across doors and windows and be cut out after fixing. The 
cut‐outs can be used to cover small areas. 
• Full length sheets should be used where possible to eliminate the need for sheet‐end butt 
joints. 
• Where sheet‐end butt joints are necessary, they must be positioned between supports. 
• Stagger butt joints on adjoining sheets and with those on opposite sides of the wall. 
• Vertical joints should be kept a minimum of 200mm from the edge of openings. 
• Ceiling sheets should be installed with the long edge at right angles to the direction of the 
support members. 
• Provide control joints in walls and ceilings at: 
−  maximum 12m intervals in both directions 
(max 6m for external ceilings) 
−  at every change of lining material 
−  over construction joints in the substrate 
−  at every change of substrate material.      
 

                 
 
 


 
ICV DESIGN & BUILDERS
151 E. Santos St. San Joaquin,
Pasig City Philippines 1601
Tel Nos. 632-86280725
Mobile No. 639178098229 / 639190927204
 

               
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


 
ICV DESIGN & BUILDERS
151 E. Santos St. San Joaquin,
Pasig City Philippines 1601
Tel Nos. 632-86280725
Mobile No. 639178098229 / 639190927204
 

 

 
ICV DESIGN & BUILDERS
151 E. Santos St. San Joaquin,
Pasig City Philippines 1601
Tel Nos. 632-86280725
Mobile No. 639178098229 / 639190927204
 
 
9. FIBER CEMENT BOARDS FRAMING INSTALLATION  
     (Similar to Plasterboard framing only board installation id different) 
 
 
 
 
 
 
 
 
  Determine the alignment of wall on the floor  Install Light gauge steel frames on the floor 
  and ceiling board  and required alignment by using plastic insert 

 
 
 
 
 
 
 
 
 
  Install LGS framing by insert and twist to be  Fix Fiber cement board by self‐drilling point 
  perpendicular to the ficem board in 610 cm  screw   
  spacing 

 
 
 
 
 
 
 
 
 
 
In case of lightweight frame to use, another  In case the wall height is higher than 2.40 m 
  pair frames shall be used to support the  (8ft) Additional frame shall be added to 
  joint between boards (Applicable to  support the panel jointing  
  0.40mm thk frames with 2’ x 4ft frame) 

 
 
 
 
 
 

10 
 
ICV DESIGN & BUILDERS
151 E. Santos St. San Joaquin,
Pasig City Philippines 1601
Tel Nos. 632-86280725
Mobile No. 639178098229 / 639190927204
 

Prior to installation of boards, install the  Fix ficem board to frame using needle point 
conduits for electrical and plumbing system.  screw 23_25mm with 20 cm spacing. And 
Additional frame should be added when  1.20m edge distance with 5cm distance from 
panel’s corner 
boxes are installed on areas without frame 
 
 

Leave space or gap 0.80cm (or equal to  Cover the screw head with plaster joint 
board’s thickness  compound for the joint properly 

 
 
10. FICEMBOARD INSTALLATION 
 
Cutting of Fiber cement board using Electric cutting tool.   
 
 
 
 
 
 
 
 
 
Use electric grinder 4” dia size cutting disc to  Trim the edge with sandpaper 
cut board according to the set line 
 
 
 
 
 
 
 
 
 
 

11 
 
ICV DESIGN & BUILDERS
151 E. Santos St. San Joaquin,
Pasig City Philippines 1601
Tel Nos. 632-86280725
Mobile No. 639178098229 / 639190927204
 
 
Cutting of Fiber cement board using manual cutting tool   
 
 
 
 
 
 
 
 
Use cutter to rip on the set line several times    Lever cut the board (Don’t press or else the 
until the trace of 1 to 3mm deep in the board    edge will not be smooth) and trim the edge 
thickness  with sandpaper. 
 
 
Drilling of holes on Fiber Cement boards   
 
 
 
 
 
 
 
 
 
Drill small hole continuously with electric    Trim the edge with file and smooth with sand 
drilling machine according to the set line. Use    paper 
hammer knock to unwanted piece to come out 
 
 
SPACE LINING WALL INSTALLATION  ` 
 
 
 
 
 
 
 

For Internal corner, leave the space  Paint cement primer before covering with 
between board and apply polyurethane  top coat 
joint sealant to the space, leave it dry. 

12 
 
ICV DESIGN & BUILDERS
151 E. Santos St. San Joaquin,
Pasig City Philippines 1601
Tel Nos. 632-86280725
Mobile No. 639178098229 / 639190927204
 
 
 
 
 
 
 
 
 
 
 
  Clean properly, the gap between board shall  Use 6” trowel to make first plastering for 
  be embedded by acrylic joint compound and  15cm width 
leave it dry 
 
 
 
 
 
 
 
 
 
 
 
  Clean properly, the gap between board  Make 2nd plastering by 8” trowel by 
  shall be embedded by acrylic joint  plastering 20cm and leave it dry 
compound and leave it dry 
 
 
 
 
 
 
 
 
 
  Make third plastering by 11” trowel by  Polish the plastering by abrasive paper no 
plastering for 20cm and leave it dry  120 and apply the concrete primer before 
  applying the final coat of paint 
 
 
  
 
 
 
 
 
 
 

13 
 
ICV DESIGN & BUILDERS
151 E. Santos St. San Joaquin,
Pasig City Philippines 1601
Tel Nos. 632-86280725
Mobile No. 639178098229 / 639190927204
 
                        
11. PLASTERBOARD & FIBER CEMENT BOARD MATERIALS: 
 
 
 
 

9mm/12mm THK STANDARD USG/BORAL GYPSUM BOARD 
 
 
  
 
 
 
 
 
 
9mm/12mm THK MR (MOISTURE RESISTANT) USG/BORAL GYPSUM BOARD 

 
6mm/12mm THK FIBER CEMENT BOARD (SCG‐SMART BOARD) 
 
 
 
 
 
 
 
 
 
 
 
 

14 
 
ICV DESIGN & BUILDERS
151 E. Santos St. San Joaquin,
Pasig City Philippines 1601
Tel Nos. 632-86280725
Mobile No. 639178098229 / 639190927204
 
 
12. Supervision 
 
Installation is carried out by the skilled and experienced installer who has expertise in board 
installation finishing. They are assisted by unskilled laborers. Their work is in turn supervised by 
experienced Foremen. Site Engineer/ Architects will be available for co‐ordination with other sub‐
contractors and Main Contractor and also to look into the technical aspects.   
 
13. Fixing Materials Used 
 
a. Steel Framing, Studs, Tracks, Corner Beads, Connecting Clip, Blind Rivets to connect LGS. 
b. Black screw to connect gypsum board and steel framing. 
c. PVC Trims, as the termination between wall and ceiling. 
d. Gypsum Putty and Wire mesh tape for the control joint in each and every board laid 
 
14. Safety Procedures 
 
a. All standard Health, Safety & Environment norms will be adhered to strictly. A toolbox talk is  
conducted prior to the start of the work, in accordance with procedure 
b. All the workmen will wear overalls, safety shoes, goggles, hand gloves and helmets. Adequate 
lighting and ventilation will be ensured during installation. Lighting shall be provided in the night shift 
activities.  
c. Safety Belt is worn prior to start of work. The work Involves working at a height of 1.8 meters 
from Floor Level all the time should wear full body safety harness. 
d. It will be ensured that machinery and tools used are safe and always in good condition. 
e. Markings will be made on the wall by setting plumb to determine the exact locations. 
f. Erection of scaffolding shall be by the certified scaffolders. 
g. All electrical cable shall be color coded by the competent person with monthly color coding. 
h. Forklift operations will be under the control of the banks man who will have clear visual 
contact at all times with the equipment. The forklift will be used for lifting of material, safe for 
its use. The operator has a valid license to operate. 
 
15. General 
a. The Sub‐Contractor reserves the right to amend the method from time to time in consultation 
with the Main Contractor, depending upon the specific site conditions. 
 
 
 
 
 
 
 
 
 
 
 

15 
 
ICV DESIGN & BUILDERS
151 E. Santos St. San Joaquin,
Pasig City Philippines 1601
Tel Nos. 632-86280725
Mobile No. 639178098229 / 639190927204
 
 
 
16. FRAMING & ACCESSORIES            

METAL STUD 

METAL TRACKS 

 
 
METAL FRAMING 
ITEM  WEB  LENGTH  THICKNESS 
  51mm, 64mm, 76mm, 92mm, 102mm, 2.4m, 3.0m to any transporable 0.5mm, 0.6mm, 0.8mm,
STUD/TRACKS  127mm, 140mm, 152mm   length   1.0mm, 1.2mm  

              
 

METAL CORNER BEAD 