You are on page 1of 2

Date Material/Service Cost

25-Feb Place cleaning 395


26-Feb Gravel & labor 4165
27-Feb Paleta 1250
Cement 200
Sand 150
Food 90
Gas 500
28-Feb nail/pako 40
Poste/ 8 pcs 4x4 2870
1/2 elf sand 1300
1/4 elf gravel 1100
4 bags cement 800
4 pcs bakal 9mm 340
1/2 kilo nail size 4 40
1 kilo nail size 3 80
26 pcs hallow blocks 340
barbwire 3000
paleta 900
10-Mar 2x3 13 pcs 2400
2x2 cut 5 pcs 0
25-Mar 2x3 22 pcs 0
2x2 12 pcs 0
2x2 cut 10 pcs 0
27-Mar Labor 5500
pawid -sawali 8200
meryenda 440
pako 40
31-Mar labor and material 7000
5-Apr 4x4 post 2000
Gravel & sand + cement 3000
labor 1000
6-Apr palupo roofing 750
food 500
7-Apr cement 450
2x2x10 coco lumber 840
delivery 60
gas 500
deco sawali 1800
labor 1000
food 220
8-Apr 21 pcs coco lumber 2200
delivery 100
deco sawali 900
Sand and cement 2375
food 156
food 185
9-Apr food 90
10-Apr sawali /pawid 7900
coco lumber 23 2x2 920
labor 4000
food 110
food 230
12-Apr palupo roofing 750
food 150
13-Apr food 200
food 50
14-Apr Food & labor 2000
15-Apr material 1200
16-Apr plywood / good lumber 2477
17-Apr bowl 500
sink 350
sink drainage 75
18-Apr labor 5000
food & material 800
20-Apr food material 2000