You are on page 1of 6

ASSIGNMENT 7

AE5041: MANAJEMEN PENGEMBANGAN PRODUK

Constructing Work Breakdown Structure

Nu'man Amri Maliky 23620004


Boris Ernest Halasan Sirait 23620005
Radifan Faiz Irsyadi 23620025
Niko Ardian 23620301
Tegar Widya Utomo 2362030

AEROSPACE ENGINEERING
FACULTY OF MECHANICAL AND AEROSPACE ENGINEERING
BANDUNG INSTITUTE OF TECHNOLOGY
APRIL 2021
Constructing Work Breakdown Structure
Nu'man Amri Maliky¹, Boris Ernest Halasan Sirait², Radifan Faiz Irsyadi³,
Niko Ardian4 , Tegar Widyo Utomo5 Aerospace Engineering, Institut
Teknologi Bandung 23620004@mahasiswa.itb.ac.id, 2 236
20005@mahasiswa.itb.ac.id, 3 236200025@mahasiswa.itb.ac.id, 4
23620301@mahasiswa.itb.ac.id, 5 23620302@mahasswa.itb.

Abstract
The Sundowner C-23 is one of the aircraft that use in one of the AMTO in Indonesia. It use
for training for pilot students and mechanic student. For a mechanic mechanics who want
to do a maintenance for this aircraft, they need to make a schedule. Before make the
schedule, they need to make a work break down structure (WBS) first. It helps them to
provide a list of jobs to be completed, allocates resources, compiles schedules and
calculates costs. But in this assignment, we are going to make the WBS of the WBS for
2000 hours inspection for Sundowner C-23 Sundowner and describe the WBS with Gantt
chart.

Keywords: C-23 Sundowner, WBS, schedule

1. INTRODUCTION
“Aircraft is an any machine or device that can fly in the atmosphere because of the
lift from the reaction of the air” (UU no. 1 tahun 2009). The aircraft is made to
accommodate the human for transportation needs.. The aircraft is full of risk, so the
mechanics must know all about the aircraft that their handle.

Airframe is an important part of aircraft, it makes the shape of an aircraft and carry
the all load of an aircraft. Airframe of an aircraft consists of fuselage, empennage, and
wing. Fuselage is main body of an aircraft consist of longerons and bulkheads. Empennage
is tail assembly of an aircraft consist of horizontal stabilizer, vertical stabilizer, and tail
cone. Wing creates lift that can make aircraft fly on the air, consist of spars and ribs.
Because of these, the mechanics must know the knowledge of the aircraft structure to aid
them when maintenance and repair of an aircraft. Especially in one of the AMTO in
Indonesia which use Sundowner C-23 as a training for pilot students and mechanic
students.

The airframe maintenance system consists of cleaning, inspection, disassembly,


tension and rigging, weight and balance, and swing compass. These task done by certified
mechanics yet have good knowledge about the airframe of aircraft. Also maintenance need
proper tool to achieve the best performance about aircraft airframe.

To accomplish these task, the mechanics need to make a flow job that can set the
schedule. Before make a flow job, they need to make a work break down structure (WBS)
first. Because with WBS, they can provide a list of jobs to be completed, allocates
resources, compiles schedules and calculates costs. But in this assignment, we are going to
make the WBS for 2000 hours inspection for Sundowner C-23 and describe it with Gantt
chart by using Microsoft project software.

2. Work Breakdown Structure


Here are the WBS for 2000 hours inspection for Sundowner C-23. See in the next page.
2000 HOURS INSPECTION BECHCRAFT SUNDOWNER C-23

DISASSEMBLY CLEANING INSPECTION ASSEMBLY CHECK

 Control surface and


 Aircraft Jack  Cleaned all system
 Drained all fluid disassembled/remaining  Wing and empennage
 Disconnect push pull tube part for inspection  Landing gear system
of aileron  Fuselage
 Remove LH and RH
aileron
 Check all connection
 Remove cable assy
  control surface Rigging
 Remove tail cone Install aft wing bolt
  flap system
 Disengage tab actuator rod Flap control system
  control surface movement
 Remove stabilator actuator RH & LH wing tip
rod bolts  Rudder assy  engine control
 Remove stabilator  Stabilator & stabilator tab  booster pump
assembly assembly  electrical system
 Disconnect rudder bell  LH & RH main landing gear  ground run test
crank cable  Engine mount  carburetor heat
 Disconnect turnbuckles  Nose landing gear  fuel system
 Disconnect brake line  Master cylinder brake pedal  engine vibration
tubing  Fuselage unjack  mixture condition
 Disconnect nose gear  all engine instrument
 brake operation
 engine mount condition
 swing compass
3. Gantt Chart
After we make the WBS, then we describe it with Gantt chart. We estimate the date
start from Monday 19 April 2021 and finished on Tuesday 27 April 2021.
From the Gantt chart we created, the duration for 2000 hours inspection for Sundowner
C-23 is 7 days.

References

1) 2000 Hours Inspection Bechcraft Sundowner C-23 Task Card


2) UU No. 1 Tahun 2009
3) U. S. Department of Transportation. 2012. Aviation Maintenance Technician Handbook
Airframe. United States: Federal Aviation Administration.

You might also like