Rate Amount
Item No. Description Unit Quantity
(Rs) (Rs)

Section R-35 Pre-Cast Concrete Paving Block

R-35.1 Providing and laying contraction edge stone in 1:2:4 fixed


in cement sand mortar 1:3 and embedded in 1:2:4
concrete base including fabrication, formwork, curing etc.,
complete in accordance with sizes, line and levels shown
in the drawings and as per Specifications.

a) Edge Stone (4" x 12") Rft 791

Miscellaneous

M-1 Provide and lay 12" x 12" x 1" thick approved precast
concrete tiles (Decorative) in flooring including 3/4" thick
1:4 cement sand mortar bed under coat complete in all
respects as per drawings and as per sample approved by
the Engineer. Sft 10,007

M-2 Providing and laying contraction joints in concrete


pavement including 1/4" x 1" sealant (Sika Flex-Pro-3I
Cure) as per drawings and Specifications. Rft 11,625

M-3 Provide and lay expansion joint in pavement including


3/4" x 1" sealant (Sika Flex-Pro-3I Cure) and 1"
premoulded expansion joint filler complete as per
drawings and Specifications. Rft 564

M-4 Provide and lay in position set of mild steel pipe 16 SWG
M.S. caps 10" long and 3/4" dia M.S.smooth dowel bars
at 20" c/c, 22" long, partly oiled and painted in expansion
joints of concrete pavement as per drawings and
Specifications. Each 337

Total C/o to Summary of Cost: