TOPIC-

Efficient Insulation for Commercial Refrigerators


OBJECTIVES-

 Long lasting cooling after electricity cut off.


 Food will be safe up to 18-20 hrs in the refrigerator
 To eliminate conduction, convection and radiation heat transfer

PROJECT REVIEW-

The efficiency of the refrigeration can be increased by introducing a insulation (Glycol + Water Solution) with the
help of which the cooling effect can last up to 18 to 20 hours after the power failure if the door is kept close.

FUTURE PLAN WITH TIMELINE -

1. Design process (Three weeks)

 Drawing rough sketch of refrigeration unit to get actual look of product

 Finding the required dimension for refrigeration unit

 Converting the sketch into digital model or 3D model in auto cad or solidworks

2. Material list (One weeks)

Galvanized iron sheet for body, Ethylene glycol, Copper pipe.

3. Material purchase (One week)

Market survey

4. Fabrication (Three weeks)

I. Refrigeration unit –

 Marking dimension on GI sheet

 Cutting and Bending

 Inner and outer tank

 Soldering copper tube to inner tank

 Fabrication of outer body

 Preparation of insulation

 Door fabrication

II. Compressor unit –

 Assembly
5. System diagnosis (One weeks)

 Function checking

 Quality checking

6. Testing (One week)

Checking required temperature

7. Final report and documentation (Two weeks)

WORK TO BE DONE TILL NEXT WEEKEND MEETING -

Drawing rough sketch of refrigeration unit to get actual look of product