You are on page 1of 1

Here are five mock manufacturing orders for U bean and Angle Hot-dipped cutting and

drilling item:
1. Manufacturing Order for 500 U-Beams: A manufacturing order is created to produce 500
U-beams. The order includes details such as the required materials, the manufacturing
process steps, and the estimated completion date. The order is assigned to the production
team, who will oversee the production process.
2. Manufacturing Order for 1000 Angle Hot-dipped: A manufacturing order is created to
produce 1000 Angle Hot-dipped pieces. The order includes details such as the required
materials, the manufacturing process steps, and the estimated completion date. The order
is assigned to the production team, who will oversee the production process.
3. Manufacturing Order for U-Beams Cutting: A manufacturing order is created to cut U-
beams to specific lengths. The order includes details such as the required equipment, the
cutting specifications, and the estimated completion date. The order is assigned to the
production team, who will oversee the cutting process.
4. Manufacturing Order for Angle Hot-dipped Drilling: A manufacturing order is created to
drill holes into Angle Hot-dipped pieces. The order includes details such as the required
equipment, the drilling specifications, and the estimated completion date. The order is
assigned to the production team, who will oversee the drilling process.
5. Manufacturing Order for Custom Angle Hot-dipped: A manufacturing order is created for
custom Angle Hot-dipped pieces with unique dimensions and drilling specifications. The
order includes details such as the required materials, the custom specifications, and the
estimated completion date. The order is assigned to the production team, who will
oversee the production process.

Here are five mock manufacturing orders for U bean and Angle Hot-dipped cutting and
drilling item with a delay in the manufacturing process:
1. Manufacturing Order for 200 U-Beams: A manufacturing order is created to produce 200
U-beams, but the cutting machine breaks down during the manufacturing process,
causing a delay of three days in the production process.
2. Manufacturing Order for 500 Angle Hot-dipped: A manufacturing order is created to
produce 500 Angle Hot-dipped pieces, but there is a delay in the delivery of the raw
materials, causing a delay of two days in the production process.
3. Manufacturing Order for U-Beams Cutting: A manufacturing order is created to cut U-
beams to specific lengths, but the machine operator falls ill and is unable to work for four
days, causing a delay in the production process.
4. Manufacturing Order for Angle Hot-dipped Drilling: A manufacturing order is created to
drill holes into Angle Hot-dipped pieces, but the drilling machine breaks down, causing a
delay of three days in the production process.
5. Manufacturing Order for Custom Angle Hot-dipped: A manufacturing order is created for
custom Angle Hot-dipped pieces with unique dimensions and drilling specifications, but
the production team discovers that the dimensions of the raw materials are incorrect,
requiring them to reorder new materials, causing a delay of four days in the production
process.

You might also like