0% found this document useful (0 votes)
2K views14 pages

Design Calculation of Oc+15 MTR Tower

1) The document provides the design of the foundation of a 22kV "OC+15m" tower located in wet soil. 2) Calculations are shown for the forces on the foundation under normal and broken-wire conditions, including vertical load, self-weight, compression, tension, and shear. 3) The vertical trust, uplift, and side thrust on the foundation are provided for both normal and broken-wire conditions based on the calculations. Unit weights of different materials are also listed.

Uploaded by

Guru Mishra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
2K views14 pages

Design Calculation of Oc+15 MTR Tower

1) The document provides the design of the foundation of a 22kV "OC+15m" tower located in wet soil. 2) Calculations are shown for the forces on the foundation under normal and broken-wire conditions, including vertical load, self-weight, compression, tension, and shear. 3) The vertical trust, uplift, and side thrust on the foundation are provided for both normal and broken-wire conditions based on the calculations. Unit weights of different materials are also listed.

Uploaded by

Guru Mishra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
  • Introduction
  • Foundation Design
  • Load Calculations
  • Bar Bending Schedule
  • Reinforcement Details and Pit Marking

.

ODISHA POWER TRANSMISSION CORPORATION LTMITED


(A Govt. of Odrsha Undertaking)
oFFrcE oF THE GENERAL MANAGER (ELECT.)
E. H.T. CONSTRUCTION CIRCLE
[Link].C-5/1, GRIDCO COLONY BHOINAGAR, BHUBANESWAR-22
(a) FAx (0674)-2546158 (G.M) I (a) @674)-2547463 (T.A). CIN: U401o2OR2O04sGcoo7ss3

[Link]-BBSR-111 ?eo t4 ) /Dated, o6


f aleots
To,
M/s. Flowmore Ltd.
N3/36, IRC Village, Nayapalli,
Bhubaneswar-75L0L2.

Sub: - Approval of open cast foundation drawing of OC+15 type tower for "Construction of 132 KV
D/C line from 2201L32133 KV Samagara Grid Sub-station to proposed t32133 KV Grid
Sub-station at Satasankha".

Ref: - 1) NOA No. 8217(Supply) & 8222(Erection) dtd.03.12.14 of [Link](CPC), OPTCL,BBSR.


2) Letter No. 2a6(a) dated 24.02.20L8 of DGM,EHT(C)Division,Bhubaneswar.
3) This Office Letter No. 216 dated 28.02.2018.
4) Your letter No. FLIOPTCLiPKG-36/2018/5065 dtd. 05.03.2018.

Sir,
With reference to the above subject, the open cast foundation drawing of OC+15 type tower
for "Construqtion of t32 KV D/C line from 2201132133 KV Samagara Grid Sub-station to proposed
L32133 KV Grid Sub-station at Satasankha" as re-submitted by you vide letter under reference(4)
duly verifled and signed by the DGM,EHT(C)Division,BBSR has been checked in line with the earlier
approved drawings of OPTCL with slight corrections in red ink on the body of the drawings and
hereby approved subject to the terms and conditions indicated below:
TERMS & CONDITIONS:
1) You are requested to circulate copies of the above approved drawing to all concerned
field officials of OPTCL.
2) The above approved drawing is only indicative. It is neither exhaustive nor restrictive.
The approval of the above drawing does not absolve you from the responsibilities of
making alternations & modifications as may be required at site which shall be done by
you in consultation with the OPTCL officials and after obtaining required permission.

1 (one) set of the above approved drawings is enclosed herewith for your reference and
fufther necessary action.

Encl: As above Your's faithfullv.

General

C.C. to:
1) Sr. General Manager (Const.) Zone-L, OPTCL, Bhubaneswar for kind information.
2) DGM, EHT(C)Division, Bh u baneswar for information. (With Enclosu re)
3) SDO, EHT(C)Su b-Division, Pu ri for nformation.
i
ll

I
ll
ll
ll
rl

ll
rl

tl

rl
I DESIGN 0F "OC+15"
ll I SOIL FOR LOCATION
{
ll L62 OF 132KV SATAS/TNKHA -
il
SAMANGARA LII\.IE
ll
il
tl

tl

rl

rl

ll
ll
ll
rl
Proof Consultant:
Foundal of 22OkV "OC+15m" Flowmore Limiterl
PAGE.1
1 er in Wet soil N3/36, IRC Village,
Nayapalli, BBSR-75 1 01 5

_509(lt) WIND LOAD


161
L28L 1E2) t@2

4',]3? 1306
(4809) - (4809)
1281 {82) 1281(482) 38.341 ?]?l
4"V32
(480e)
L{ I 0,,,
Gme)
24.O 3372
)8'l 182) 1281(482)
18.0 3m3
4'132 I 4732 on
(480e) (.480e)
4ffi

2527

Normal Condition
(60'Devn.)

M=(2227 +3( 1)* 9.346 +-(2x4732 + 7092)x49.991+ (2x4732 + 1306) x44.291+ 12x47. 2)+272t)x38.341
+ 3372 x2 f.0 + i003 x I.8.0 + 4866 x 9.0 = 1804268 Kg.m.

F = LBO426Bx 1.03 ! 5444,1Kg


2). x 1,7 .01i8

Vertical load = (s0e r6x12 BL) /4x 1,03 =2110 Kg, [Max.)
(71t 6x482',) / ax 1.03 = 763Kg [Min,)

SelIweight = [' t74 + 3+8739 +323 + 15459 +292) / 4x1.03 = 6590 KB


Compression = 544, l+217 0+6590=63L47K9
Tension = 5'44. tl.-i 63 - 65,90 = 47088 Kg

Shear = (2227 + 361 + (6x4,732) + 7092 + 1,306 + 2721 + 3372 + 3003 + 4866 + 2627) / 4 = 72 92Kg.
Proof Consultant:
lloundat IOn of 22OkV "OC+1Srm" Flowmore Limil;er ,ed
.I N3/36, IRC Village,
'A
o\ er in Wet soil
Navapalli, BBSR-75251015

509(71)
HEIGHT WIND LOAD
59.346
5 7(4
49.991
2500
(74e4)
M.29t
9 7(41 18.341 2721
2500
(24e4) ?4.4 3312
9 1{4t
18.0 3003
2500
(24%) 9.0 4866

Broken-Wire Condition
[60'De vn.)

M = (2227 36L +59 346+ (2500 +4732 +3536 +1092)x4 9.997+ [2500 +4732)r .r 3536 + 1306) 44.291+ [2500 +
4732 + 35i 6+2 721) 38.341 + (3372 x24.0) + (3003 x 1 8.0)+(4886x9.0)=lr 977208Kg.m.

It = 11977208 x 1.03. t 59659 Kg


2 x 17.068

\/ertrcal load = Is0e t [3 x 957) + (3 x LzBt)]14 x 1.03 = 18(i0 Kg, [Max.)


L77 t (3 x atl + [3 x a8z)] / 4 x L.03 = 7 73 K g (Min.)

Iielf weight = (1 '74 + 3+ 8739 + 323 + 15459 + 292) / 4x1.0 3 = 6590 Kg


Compression = 5961 9 + 1860 + 6590 = 68109 Kg

llension = 5961 ;9-i 63 - 6590 = 52356 Kg

Ijhear = (ZZZ7 +3x 1500 + 3x4732 + 362 + 7092 + 1306 + 2721 + 3372 + 3003
l + 866+2627) / 4= 1081BKg.

For Fl
Proof Consultant:
Founda of 22OkV "0C+15,m" Flowmore Limited
PAGE-3
er in Wet soil N3/36, IRC Villa61e,
BBSR-75L0L5

Vert. Trust Uplift Side thrust


NC 631,41 47CtBg 1.2492
BW - 68109 523i56 1081B

Unit eight of Dry soil = L440 Kg/rn3


Unit ight of wet soil = 840 Kg/m3
Unit ght of dry concrete (R.C.C) = 2400 Kg/m3
Unit ght of wet concrete [R.C.C) = 1,400 Kg/m3
UIt. aring capacity of wet soil = 10935 Kg/nf
of internal friction of dry soiJ. = 30o
Ang of internal friction of wet soil = 15o
water Ievel = L.5M below G.L.
e of concrete = M20 & M10
r of safety:- NC -- 2.50
BWC =2.00

'l

',rtr ,:,l;::' ::.,... ':,.: i "i 1.,.r,.,...,,. lM LE CO\TCRETE S,110

AII D&.fENSIONS ARE E{ ilS&

For Flowmore Li
Proof Consultantl
Foundat of 22QkV "0C+15rn" Flowmore Limitecl PAGE.4
er in Wet soil N3/36, IRC Villag;e,
Nayapalli, BBSR-7 5L015

Volume of Concrete [Cum)

[4.S012x0.10 =2.025
0.300 (4.502 + 3.802 + 4.50 x 3.80) = 5.179
3
[1.4012x0.500 =1.620
[0.SO1z x 2.600/Cos L5' = 0.673
f0.50)2x0.300 =0.075
9.572

0verload of Concrete (Kg.)

Thrust Uplift
0.075 x2400 = 180 180
(9.572 - 0.075) x2400 - 1440) = 911{l
[0.500x]..5x(2400-L440) = - 360
(9.572-2.025 -0.075-0.375)x(1a00-Ba0) = - - 3974

9298 451,4
Dry Soil Volume (Cum)

61 = (4.50)2 + 4 x4.50x 0.509 + Il x [0.509)2 =30.226m2


g2=(4.50)2 + 4 x4.50x (0.896 + 0.509) + IIx (0.866 + 0.509)z = 50.94m2
V = 1.50 130.226 + 50.94 + l(30.226 x 50.94)l -- 60.202 Cum
3

Wet SoilVolume LCumJ

(4.50)2x1.90 =38.475
2x4.50 x 0.509 x L.90 =8.704
II (0.509)2 x 1.90 = 0.515
3 47.694 Cum

Check for Uplift


esr nce against uplift = (60.202 x1,440) + (47.694 x 840) + ,15L4 = 131269 Kgs.

P roof (lonsultant

For Fl
Proof Consultantl
Foundatio of "0C+ 15rn" Flowmore Limitecl
er soil N3/36, IRC VillapJe,
Navapalli, BBSR-75 1 015

FoS (NCJ:- 13t269 I 47088 = 2.78,, 2.50


(BWC) :- 73t269 / s2356 = 2.50 :r 2.00

Ultimate thrust
68109 :r2.0 +

I Foundation

Hence liafe.

Exposed dry co crete surface area = 0.50 x 1.50 = 0.75 m


Exposed wet crete surface area = 4.50x0.1+ (a.50 + 38.0J x 0.30 + 1.80x0,5 + 0.50x 1.10

= 3.145m2

Total resistanc

Hence safe.

Moment due to iledl -


NC:12492x2, x3.70 = 15551 Kg - M
BWC : 10818 x 0 x 3,70 80053 Kg - M

NC:115551/
BW(l: 80053 /
Within middle t
Hence safe
Proof Consultant;
Foundatio of 22gkv "0C+1Snt" Flowmore Limitecl PAGE-6
N3/36, IRC Village,
er in Wet soil Nayapalli, BBSR-75 1015

EHEI]K FOR STUB UPROOTING :

=L200 x 200 x 20 mm
= 76.36 cm2
Embedded le = 0.750 M = 75 cm
Ulrt. tlond s = 4x20 x 75.0 x 20
= 1,20,000 Kg.
=4xL60x60x5x500mm
Bearing [Link] = 4x6.0 x 50.0 x 52
= 62,400 Kgs,
No. of M16 bo = B Nos.
Strength of =8x3550=28400Kgs.
Total stren = 1,20,000 + 62,400 + 28400
= 2,10,880 Kgs.

Factor oI saf,

NC = 2,L0 I 47088 = 4.47 > 2.5


BWC = Z,t oo / s2356 = 4.00 > 2.0

Hence sal'e

Pas;sive earth ressure, Dry = 1 + sin 30'x 1440


1-sin 30"
= 4320 Kg/m,
6480Kg:lm2
Passive earth =1+sin15"x840
1-sin 15' O 214OKglm2
= 1426.65 Kg/m,

Force,
F7= Vz x7.5 x 0.500 x 6480 = 2430 Kgs. 8 37A9Kgfur2
FZ = Yzx(214 + 3709) x 0.500 x 1.100 = 1608 Kgs,
\/)
F3=L/zx(370 + 4423) x 1.800 x 0.500 = 3659 Kgs. o 4423Ksffi
F4=Yzx(442 + 4851) x 0.30 x L4.500 + 3.800) 3
? 4851Kg/m2
Pressure l)istribution Diagrarn
Total = 13470

Limited
H
rt
I Foundatio of 22OkV "OC+15tn"
Proof Consultant:
Flowmore Limitecl
l.[ PAGE-7
N3/36, IRC Village,
er in Wet soil Nayapalli, BBSR-751

l
M = i]302 x = 6604 Kgm /m

I -)'
=80 CM
)\=t 2.6 cm
= Q.l$4 srnz
23 x 0,90 x72.6
red = 94x4.5 = 19.77 cmz
Provide 16m Tor (12 os.)
Area =l x2.07 = 24.1,2 cmz

Moment at section Y-Y

|i Vt = :ISOZ x(
)'
=30A'9.2 Kgm /m = 300920 [Link]/m

2
{
D=300mm 30 cm
d=300-50 [1.5 x 16 = 226 mm = 22.(: cm
l. = 6.4'3 cmz
x 0.90 x22.6

I Total Ast
Provide
Area
1
ired
Tor 15
=

-1
3x4.5

x2.01.
= 28.95 cmz

= 30.1-5 cm2
+
L
= 52356 =261.8Kg/mZ
I (4.so1z - [0,s0),

-
i' M 2678x Z =5236 Kgm /m = 523600 Kg.r:m/m

2 )

I D1=500+
d=800-50-
Ast= M
txl.d
=800m
L.5 x 16 72 6 mm

x 0,90 x72.6
=B0cm
= 72.(, cm
= 3.41)4 cmz

Total Ast req red = 3. x 4.5 = 15.68 cmz


I' Tor 10
-7
r

x2.07 =20.L cmz

II
I
I
Proof Consultant:
Foundatio of 220kV "0C+15m" Flowmore Limitecl PAGE.B
N3/36, IRC Village,
er in Wet soil Nayapalli, BBSR-751

M=2618x = 2386 Kgm /m = 238600 [Link]/m


) )'
2
D'= ,300mm 30 cm
- [1.5 x )) = 226mm = 22.6 cm
Z3B,]6( = 5.1 r:mz
txj.d ,xx0. ).9r x22 6
r 0.90
Total Ast req -5.
x 3.80.B( = [Link]?
Tor (16 IOSs.) I

=1, x"2.0701 =32.76 cmz

Total S.F = 82 5x4.5- = 17,L44KE


2
Developed sh r stress = 1-1.744 = 1.0 Kg/cm2
450 x24.7
%o of Steel = = 0.32
450 x22.6
Permissible = 2.42Kglcmz

Chimney:
Provide nomi al reinfo nt i.e.@ros. 25mm bars in the chimney with B mm Tor bars
at 2Cl0 mm rt

Conc. V M3 = M20
= M10

Excavation 322.56M3

Reinforcen!
"t = @

For
+1

I
i'$ Foundatio of 22OkV "0C+15tn"
Proof Consultant:
Flowmore Limitecl
PAGE-9

I er in Wet soil N3/36, IRC Village,


lli, BBSR-751_

I
I BAR BENDING SCHEDULE

{
NO. OF WEIGHT PER WEIGHT
-l LENGTH BAR DIlt UNIT WT.
SKETCH BARS FOUNDATION PER
(MM] [rN MM] Ke/M
l'Ks') TOWER
{
4400 4400 1,6 30 76 2t1.2 B44B
{

4680 t6 20 1..6 149.76 599 0

r 700
{ V] 3400 t6L 32 7.6 774.08 696.32
r--
100
t 3400
I

A
3650 25 3.92
+ UD @
I
(Ll
g
+
,,]*'
1680 B
@ 0.40 70.75

I
I rorAl = 6rD2{e

"Itl*al wt,fncul va11


Sayft.)
f\ofe- : or.s

I f* fi-"',;e- J-"=g^
A

l.

I
I
.{
Proof Consultant:
Foundatio of 22OkV "0C+15 m" Flowmore Limited
PAGE-10
er in Wet soil N3/36, IRC Village,
N li, BBSR-751015

REINFORC:EMENT DETAILS
.lit+riera! I

C.L

G.L

&nm torbars

6)nos bars
tor

V
(10+10) nos.

f l .lt-15) nos.
J
ffi*\tv
ESTIMATOR E"H"T. (C) Divlsion
EHTC DIVT:ION OPTCL,, Bhubaneswar
ci';ci, i BSn.

DePutY General tr anaffef


- r.1 ii.'T (Con tn.) Circk:
war
i'i i-L' tlh
i\f J\
For Flowmore Limited
!Et{T
OPTOL, B
Proof Consultant:
Foundation of 22lOkV "0C+151m" Flowmore Limil-ecl
PAGE-11
Tor'r er in Wet soil N3/36, IRC Village,
Nayapalli, BBSR-751 )15

+ +

/
..i

TYPE OF SOIL TYPE OF A B C D


TOW ]R

NORMAL DRY 15 MTR ]XTN. 9.03 MTR t2.769 MTR B1 2 MTR 3.30 MTR

WET' 15 M' 9.60 MTR 13.62 MTR 72 6 MTR 4.50 MTR

DRY 24 MTR EXTN. 10.598 MTll 14.988 MTR 103 3.30 MTR

Prc o

For Fl cr
r"f

.-
ODISHA POWER TRANSMISSION CORPORATION LTMITED
(A Govt. of Odrsha Undertaking)
oFFrcE oF THE GENERAL MANAGER (ELECT.)
E. H.
ll
I
ll
ll
ll
rl
ll
rl
tl
rl
ll
{
ll
il
ll
il
tl
tl
rl
rl
ll
ll
ll
rl
I
I
DESIGN 0F "OC+15"
SOIL FOR LOCATION
L62 OF 132KV SA
Foundal
1
of 22OkV "OC+15m"
er in Wet soil
Proof Consultant:
Flowmore Limiterl
N3/36, IRC Village,
Nayapalli, BBSR-75 1 01 5
lloundat
.I
IOn
o\
of 22OkV "OC+1Srm"
er in Wet soil
Proof Consultant:
Flowmore Limil;er
N3/36, IRC Village,
Navapalli, BBSR-
Vert. Trust
631,41
- 68109
Uplift
47CtBg
523i56
eight of Dry soil
ight of wet soil
ght of dry concrete (R.C.C)
ght of wet con
Proof Consultantl
Flowmore Limitecl
N3/36, IRC Villag;e,
Nayapalli, BBSR-7 5 L 0 1 5
PAGE.4
of 22QkV "0C+15rn"
er in Wet soil
Proof Consultantl
Flowmore Limitecl
N3/36, IRC VillapJe,
Navapalli, BBSR-75 1 015
= 2.78,, 2.50
= 2.50 :r 2.00
crete surface
PAGE-6
of 22gkv "0C+1Snt"
er in Wet soil
Foundatio
Embedded le
Ulrt. tlond s
Bearing sl.ren
No. of M16 bo
Strength of
Total s
H
rtI
l.[
l
I
|i
{
l.
I
+
L
I
i'
I
I'
II
I
I
23
x 0,90 x72.6
red =
94x4.5
Tor (12
=l
os.)
x2.07
2
30 cm
[1.5 x 16
)'
= 226 mm
PAGE.B
Proof Consultant:
Flowmore Limitecl
N3/36, IRC Village,
Nayapalli, BBSR-751
of 220kV "0C+15m"
er in Wet soil
Foundatio

You might also like