6.2.7 Anchor / Thrust Blocks: Ras Markaz Crude Oil Park Project (Phase1)
6.2.7 Anchor / Thrust Blocks: Ras Markaz Crude Oil Park Project (Phase1)
Anchor / Thrust blocks shall be installed at the specified locations as per the stress analysis Isometric Drawing
before doing the hydro test.
The RTRP pipe has to be installed and protected with concrete slab or CS/ HDPE sleeve pipes for those road
crossing with buried depth less than 1500mm. Centralisers shall be used to support the RTRP pipe inside the
casing (sleeve). The end seals shall be used to prevent the entering of any dust or sand particles.
In case of metallic casing pipe, Pipe sleeve shall be coated as per the approved coating procedure.
At locations where concrete protection has been applied, the trench shall be backfilled with coarse gravel
and rock with a minimum dimension of 50 mm up to a level of 500 mm below grade level.
RTRP pipes shall be tested independently before inserting into the sleeves to check the integrity of the joint
which is coming inside the sleeve. For reducing the number of testing of road crossing and test ends, it can be
made as a longer slings and can be cut to the required length and shifted to the location for which it is required.
6.2.8.1 Installation of Centralizer and End seal for Road crossing Pipes
Cenralizers fixed on pipe Pipe fixed with centralizer inserting inside the casing
pipe
9686-6120-MS-PO0103-5000 Page 9 of 10