You are on page 1of 1

 

RAS MARKAZ CRUDE OIL PARK PROJECT (PHASE1)

PROCEDURE FOR LAYING OF UNDERGROUND RTRP PIPING SYSTEM

Doc No: 9686-6120-MS-PO0103-5000 Rev. 01 Doc. Class 3

CONTENTS

1.  Scope ....................................................................................................................................................................... 3 

2.  Objective ................................................................................................................................................................. 3 

3.  References ............................................................................................................................................................... 3 

4.  Definitions: ............................................................................................................................................................... 3 

4.1 Responsibility ............................................................................................................................................................ 3 

5.  Abbreviations: .......................................................................................................................................................... 4 

6 Specification ................................................................................................................................................................. 4 

6.2 Applications ............................................................................................................................................................... 4 

6.2.1 Excavation of the Trench ........................................................................................................................................ 4 

6.2.1.1 Trenching on Slope .......................................................................................................................................... 5 

6.2.2 Pipe Bedding .......................................................................................................................................................... 6 

6.2.3 Pipe Laying............................................................................................................................................................. 6 

6.2.4 Pipe assembly ........................................................................................................................................................ 7 

6.2.5 Back filling .............................................................................................................................................................. 8 

6.2.6 Soil Compaction ..................................................................................................................................................... 8 

6.2.7 Anchor / Thrust blocks ............................................................................................................................................ 9 

6.2.8 Road / Wadi crossing ............................................................................................................................................. 9 

6.2.8.1 Installation of Centralizer and End seal for Road crossing Pipes ......................................................................... 9 

Attached:
1.Scope Responsibility matrix
2.Flange Pit Drawing.

9686-6120-MS-PO0103-5000 Page 2 of 10