You are on page 1of 2

Audit & survey report for Machine Guarding system at KPM-5

28 June 28, 2017

Location Remarks Images


PIZZOLATTO CUTTER  Unbinding stand
KPM-5 Required platform with
railing

 Required side railing


for stair case
REEL WRAPPING  At crimping section
MACHINE required gap covering
on between platform
 Required side guard
with Dispenser belt

 Stopper should be
required at Unloading
area.
 Electrical cable
Rewinder No- (1) required to be covered
at Rewinder operating
section
 Required to be covered
rewinder’s (1)
coupling at back side
area
 The belt of ride roll of
Rewinder (1) required
to be covered by
guard.
 Spool of paper reel of
Rewinder (2)
 Required to be covered
Rewinder No- (2) with guard size 3X3
 The motor & roll
required to be covered
at backside of
Rewinder (2)
 The roll gear box of
top former & carden
shaft are opened at
backside of machine ,
required to be
covered with
adjustable guard size
6x6
 Couch roll & carden
KPM -5 MACHINE AREA shaft both are
opened near top
former, required to
be covered
 Pick Up roll of F.D.R.
& motor both are
opened , required to
be covered with
guard size 10X2 & 2X2
 The coupling safety
guard is to be
required at 1st, 2nd &
3rd press part. Size
2X2
 The motor carden
shaft required to be
cover with safety
guard at fourth group
dryer part. Size 2X2
 The refinery motor
coupling is required
to be safety guard at
pulp preparation
section
 The felt of primary
pressure screen is
required to cover
with safety guard.