Vessel/Rig Approach Certificate Page 1 of 3

Field: AAB
Vessel/Rig:

Installation Planned Approach Date Est'd Days On Location

Reason For Approach

Approved Workscope Summary

Assurance Review Complete And Actions Identified (Accountable Department to Verify by ☑)

☐ Vessel Prerequisites ☐ Installation Emergency Equipment ☐ Riser Integrity


☐ Topsides Piping ☐ Wells Review

I hereby confirm that the assurance checks in my area of responsibility are complete. The vessel
may safely approach the above noted facility and perform the designated works, subject to Sign Date
implementation of mandatory actions noted below.
Vessel: Drilling consultant/ Field GM
Emergency Equipment:
Field General Manger
Risers & Topsides Piping:
Production ass. Manager
Wells: Offshore production ass. General Manager
Compliance With Assurance
HSE General Manager
Process:

The following actions must be completed before the vessel may safely approach the facility. Offshore Production GM to
confirm these actions are complete, before submitting this certificate to Field GM for final approval.

ACTIONS COMPLETE
Items to be Actioned Prior To Approach
Sign (By O/P GM) Date

Validation
In accordance with the assurances provided above, approach certificate approved for the following period:
Valid From: To: Signed: Engineering GM
Revalidation From: To: Signed: Engineering GM
(Note: Certificate to be revalidated by Engineering GM after 3-months).
Vessel/Rig Approach Assurance Page 2 of 3

Field AAB
Vessel/Rig

Estimated No of Day's On
Installation Planned Approach Date
Location

Rig/Vessel Procedure Status (Cairo Drilling consultant / Field General Manager)

Description Yes/No Action required to permit approach Signed


Emergency interface document approved by
Operations.
Outstanding critical actions from pre-hire audit
or pre move meeting closed out.
Anchor pattern approved

Emergency Equipment Status on Installation (Offshore Production GM)


Last test
Description Yes/No Action required to permit approach Signed
date
Fire Pumps Operational
Deluge Systems Operational
ESD system tested and functioning
Do all HPG Pipelines have auto ESD fitted?
Do all Oil Pipelines have auto ESD fitted?
PA, Alarm and telecoms systems functional

Riser Integrity (Facilities AGM)

Riser Inspections Yes/No Date Action required to permit approach Signed

HPG Risers Inspected

Oil Risers Inspected

Known Red Anomalies Affecting Approach Action required to permit approach Signed
Vessel/Rig Approach Assurance Page 3 of 3

Field AAB

Vessel/Rig

Installation Planned Approach Date Estimated No of Day's On Location

Topsides Piping Integrity (Facilities AGM)


Piping Inspections Yes/No Date Action required to permit approach Signed

HPG Piping Inspected

Oil Piping Inspected

WI Piping Inspected

Known Red Anomalies Affecting Approach Action required to permit approach Signed

Well Integrity (petroleum Enginering Ass. GM)


Number of prodution wells Average H2S level in gas stream
ppm
Number of free flowing wells Maximum H2S

Yes/No Yes/No
Do any wells have significant B annulus pressure (80 % of surface
All free flowing wells have a valid communication test.
casing collapse pressure psi) or direct communication with A annulus.

Do all wells have valid Tree checks, SSSV Tests, Do any wells have tree integrity issues that fall below Amapetco
communication tests. minimum acceptance guidelines.

Do any Wells have conductor vibration Does any Well have Production Or Test Header Valves Passing.

Do any Wells have HP Gas Injection Valve Integrity


Any wells identified as needing rig assisted repairs
issues (If Yes, repair or spade)
Rig approach well information sheet completed and
attached

Outstanding actions required to establish well integrity and develop associated pre-approach mandatory actions.

Well Type (NF/GL/TA/PA etc.) Problem Action Responsible Date Status

All wells not meeting the minimum well integrity requirments for rig mobilisation and SIMOPS must be killed and/or isolated before approach
certificate will be issued.