Production Schedule - Audio Visual

Audio Visual Production

Filming Date Timescal Materials Equipment Personnel


e
(Activities) (Costume, Props and (Cast and
Pre-production work) Crew)
Establishing 12/5/21 22:00 - Not needed Camera Luke Aldred

shots 22:30
Tripod
The Flat 12/5/21 13:00 - Props: Camera Luke Aldred

shoots 16:00 Louis Bimpson


Belt Gimbal
Hareth Hamam
chair Lighting Kyle Voss

mirror India Tait

Costume:
Joggers and jacket
Leggings and hoodie
Backstreet / 13/5/21 12:00 - Costume: Camera Luke Aldred

Car Shoots 14:00 Louis Bimpson


joggers and Gimbal
Hareth Hamam
coat/jacket/hoodie
Kyle Voss
legging and
India Tait
coat/jacket/hoodie

Housing 13/5/21 14:30 - Costume: Camera Luke Aldred

Estate / 16:00 Louis Bimpson


joggers and Gimbal
Park Hareth Hamam
coat/jacket/hoodie
Shoots
Kyle Voss
legging and
India Tait
coat/jacket/hoodie

Reviewing Footage

Footage Date for reviewing and selecting footage


Establishing 13/5/21
Shots
The Flat 13/5/21
Backstreet 13/5/21
Car 14/5/21
Housing 14/5/21
Park 14/5/21

Post Production

Editing Date Time Materials Equipment


Thriller Trailer 18/5/21 10:30 - 12:00 Establishing Computer
Shots
Adobe Premier
The Flat
18/5/21 09:00 - 10:30 Backstreet Computer
Adobe Premier
Car
18/5/21 14:30 - 16:00 Housing Computer
Adobe Premier
Park

Budget

Equipment Link Price


Canon Eos R https://store.canon.co.uk/canon-eos-r-body-rf-24-105mm-f4-7-1- £2,049.
is-stm-lens/3075C128/ 99

Gimbal https://www.bhphotovideo.com/c/product/1576697- £409,88


REG/manfrotto_mvg220ff_gimbal_220_pro_kit.html
Memory https://shop.westerndigital.com/en-gb/products/memory- £23.99
Card cards/sandisk-extreme-pro-uhs-i-sd#SDSDXXY-064G-GN4IN
Adobe Suite £49.94
/mo

PC (with https://www.apple.com/uk/shop/buy-mac/macbook-pro/16-inch £2,799.


large 99
memory)

Total £5,283.
85
+
£49.94/
mo

Launch Date:
28th May

Contingency Plan
Our contingency plans are in place to help me make sure my production is possible and
achievable by the given date for it to be finished. For instance if one of our actors in any of
my filmings cancel on me and aren't able to do the task. I will have backup people that I can
sort a date with to replace my original, this will be possible as we will organise anything
beforehand so the deadline for the thriller trailer is met.
Another plan I will have in place is the location’s if somewhere is not open or is not
accessible I will then go to another place that is very similar to my original idea, I will then
make sure they too are accessible and I am able to get to the location to meet the deadline
for my trailer.
If any of my equipment doesn't work or breaks I will always make sure I have access to more
equipment, I will have multiple pieces of equipment I can use such as batteries if one dies or
get access to another camera if one breaks.