Perhitungan RL Ash CJ Konya Rencana Aktual
Perhitungan RL Ash CJ Konya Rencana Aktual
Diketahui :
Bahan Galian Andesit
a. KBstd = 25
b. KSstd = 1,1
c. KJstd = 0,4
d. KTstd = 1,0
e. SGe DANFO = 0,82 gr/cc (DANFO)
f. VoD DANFO = 3300 mps = 10.826,77 fps
3
g. SGr std = 2,6 ton/m
h. SGr = 2,58 ton/m3
i. de = 3,5 inch
j. H = 22 m
k. n = 8 lubang
l. Tonaseaktual = 3370,87 ton
Hitung geometri peledakan berdasarkan rumus RL.Ash dan C.J.Konya !
Hitung Powder Factor !
Penyelesaian
MENURUT R.L.ASH
Dik : Bahan Galian Andesit.
KBstd = 25
KSstd = 1,1
KJstd = 0,4
KTstd = 1,0
ρe DANFO = 0,82 gr/cc
VoD DANFO = 3300 mps = 10.826,77 fps
ρr std = 2,6 ton/m3
ρr = 2,58 ton/m3
de = 3,5 inch
H = 21 m
Tonaseaktual = 3318,89 ton
Dit : Hitung geometri peledakan berdasarkan rumus RL.Ash !
Jawab :
a. Berdasarkan grafik pengaruh diameter lubang ledak terhadap VOD
ANFO diperoleh VODstd sebesar :
VOD std = 11500 fps
b. Burden (B)
1.) KB
KB = KB std x AF1 x AF2
3
0,82 gr/cc x (10.826,77)2 fps 3 2,6 ton/m3
KB = 25 x √ 2 x √
0,84 gr/cc x (11.500) fps 2,58 ton/m3
KB = 23,88
2.) B
KB x de (inch)
B =
12
23,88 x 3,5 inch
B =
12
B = 6,96 ft = 2,12 m
Karena, sudut kemiringan lubang 800, maka :
B’ = B x sin α
B’ = 2,12 m x sin 800
B’ = 2,09 m
c. Spacing (S)
S = KS std x B
S = 1,1 x 2,09 m
S = 2,30 m
d. Stemming (T)
T = KT std x B
T = 1,0 x 2,09 m
T = 2,09 m
e. Sub-drilling (J)
J = KJ std x B
J = 0,4 x 2,09 m
J = 0,84 m
f. Whandak (Berat Isian Bahan Peledak)
1.) Loading Density (LD)
LD = 0,508 x de2 x ρe
LD = 0,508 x (3,5)2 inch x 0,82 gr/cc
LD = 5,10 kg/m
2.) Powder Coulumn (PC)
PC = (H+J)-T
PC = (21 m + 0,84 m) – 2,09 m
PC = 19,75 m
3.) Whandak
Whandak = LD x PC
Whandak = 5,10 kg/m x 19,75 m
Whandak = 100,72 kg
g. Powder Factor (PF)
1.) Volume (V)
V =BxSxH
V = 2,09 m x 2,30 m x 21 m
V = 100,95 BCM
2.) Tonase (W)
W =Vxρ
W = 100,95 BCM x 2,58 ton/m3
W = 260,45 ton
3.) Jumlah lubang ledak (n)
Tonaseaktual
n =
W
3370,87 ton
n =
260,45 BCM
n = 12,94 lubang = 13 lubang
4.) Wpowergeltotal
Wpowergeltotal = W powergel x n Dinamit
Wpowergeltotal = 200 gram/batang x 56 batang
Wpowergeltotal = 11200 gram = 11,2 kg
5.) Whandaktotal
Whandaktotal = W handak x n
Whandaktotal = 100,72 kg x 13
Whandaktotal = 1309,36 kg
6.) Volume Total (Vtotal)
Vtotal =Vxn
Vtotal = 100,95 x 13
Vtotal = 1312,35 BCM
7.) Tonase Total (W total)
Wtotal =Wxn
Wtotal = 260,45 x 13
Wtotal = 3385,85 ton
6.) Powder Factor (PF)
Whandaktotal + Wpowergeltotal Whandaktotal + Wpowergeltotal
PF = atau
Vtotal Wtotal
3 SGe
B = 3,15 de √
SGr
3 0,82 gr/cc
B = 3,15 x 3,5 inch x √2,58 gr/cc
B = 7,52 ft = 2,29 m
Karena, sudut kemiringan lubang 800, maka :
B’ = B x sin α
B’ = 2,29 m x sin 800
B’ = 2,26 m
b. Spacing (S)
S = 1,4 B ; L>4B
S = 1,4 x 2,26 m
S = 3,16 m
c. Stemming (T)
T =B
T = 2,26 m
d. Subdrilling (J)
J = KJ x B
J = 0,4 x 2,26 m
J = 0,90 m
e. Whandak (Berat Isian Bahan Peledak)
1.) Loading Density (LD)
LD = 0,508 x de2 x ρe
LD = 0,508 x (3,5)2 inch x 0,82 gr/cc
LD = 5,10 kg/m
2.) Powder Coulumn (PC)
PC = (H+J) - T
PC = (21 m + 0,90 m) – 2,26 m
PC = 19,64 m
3.) Whandak
Whandak = LD x PC
Whandak = 5,10 kg/m x 19,64 m
Whandak = 100,16 kg
f. Powder Factor (PF)
1.) Volume (V)
V =BxSxH
V = 2,26 m x 3,16 m x 21 m
V = 149,97 BCM
2.) Tonase (W)
W =Vxρ
W = 149,97 BCM x 2,58 ton/m3
W = 386,92 ton
4.) Jumlah lubang ledak (n)
Tonaseaktual
n =
W
3370,87 ton
n =
386,92 BCM
n = 8,71 lubang = 9 lubang
5.) W powergeltotal
Wpowergeltotal = W powergel x n Dinamit
Wpowergeltotal = 200 gram/batang x 56 batang
Wpowergeltotal = 11200 gram = 11,2 kg
6.) Whandaktotal
Whandaktotal = W handak x n
Whandaktotal = 100,16 kg x 9
Whandaktotal = 901,44 kg
7.) Volume Total (Vtotal)
Vtotal =Vxn
Vtotal = 149,97 x 9
Vtotal = 1349,73 BCM
8.) Tonase Total (W total)
Wtotal =Wxn
Wtotal = 386,92 x 9
Wtotal = 3482,28 ton
7.) Powder Factor (PF)
Whandaktotal + Wpowergeltotal Whandaktotal + Wpowergeltotal
PF = atau
Vtotal Wtotal