Function: [ ] Line Breaker [ ] Bank Breaker [ ] Cap. Bank Breaker [ X ] Tie BreakerStation Service
Insulating Medium: [ ] Oil [ X ] SF6 [ ] Air [ ] Vacuum
[X ]
Reason for Test: [ ] PMT [ ] Servicing [ ] Faulted Others:_______________New
I. TIMING TEST
A. OPERATION: CLOSE
B. OPERATION: OPEN
Retention: Twenty (20) years EQUIPMENT LIFE
SUBSTATION PREVENTIVE MAINTENANCE PROCEDURE
POWER CIRCUIT BREAKER TEST REPORT
VISUAL INSPECTION
Oil Level / SF6 Pres. Main Contacts Control Mechanism
Contamination Wooden Members Condition
Grounding Interrupters Clearance
LEAK TEST / CHECK [ ] No leaks found [ ] Leaks found at: (enumerate below)