TEST REPORT

Customer Rio Tinto Job No. SPS-851096


Location Marandoo Work Order 110604284
Substation SUB2101 Primary Crushing Date 03/04/2024
Switchboard SUB2101.MCC1 Panel Incomer

1. NAMEPLATE DETAILS

NAMEPLATE INFORMATION

Make: Terasaki Rated Voltage: 1000V Tripping Voltage: 110 Vdc Closing Voltage: 110 Vdc

Tempower ✘ Spring Solenoid Hydraulic


Model: Nominal Current: 2500 A Mechanism:
AGR-31B S/Pole

Serial Short Circuit Live Tank Dead Tank ✘ Indoor


12104-276 85 kA Format:
No: Current:
Outdoor
Asset Insulating Oil ✘ Air SF6
N/A Short Circuit Time: 1 Sec
No: Medium: Vacuum

2. ELECTRICAL TESTS

INSULATION RESISTANCE TEST IN BREAKER OPEN POSITION

Connection +VE Connection -VE Test Voltage Duration Resistance (Ω) Remarks

RED red 500 V 60 sec > 1T Pass

WHITE white 500 V 60 sec > 1T Pass

BLUE blue 500 V 60 sec > 1T Pass


INSULATION RESISTANCE TEST IN BREAKER CLOSE POSITION

RED WHITE 500 V 60 sec > 1T Pass

WHITE BLUE 500 V 60 sec > 1T Pass

BLUE RED 500 V 60 sec > 1T Pass


Note: Insulation Resistance Test in OPEN Breaker Position to check insulation integrity of insulation.
Insulation Resistance Test in CLOSE Breaker Position with Earth,

CONTACT RESISTANCE TEST

Connection +VE Connection -VE Current Inj. Resistance (Ω) Remarks

RED red 100 A 10.2 µ Pass

WHITE white 100 A 7.8 µ Pass

BLUE blue 100 A 7.2 µ Pass

Tested by: Bilal Ahsan Reviewed By: Usman Ali


TERASAKI TEMPOWER 2 Page 2 of

AGR-31B
TEST REPORT

3. INSPECTION / FUNCTIONAL CHECK

FUNCTION / OPERATION TESTS

Earthed support structure and mechanism N/A Interlocks functional N/A

Manual open close operation available ✘ Arc chutes removed and contacts checked N/A

Operation of the manual spring charge/discharge ✘ Operational nameplate in position ✘

Visual inspection completed ✘ Structural or paint damage No

Mechanism checked and lubricated N/A Racking mechanism tested and working N/A

4. TEST EQUIPMENT

Test Equipment Used

Equipment Number Equipment Description Calibration Due Date

ANU-1 Terasaki OCR Checker 23/10/2024

5. COMMENTS

COMMENTS:

Full service has was performed. Circuit breaker has been cleaned and all contacts including slide points greased. All test results are
satisfactory and Circuit breaker is healthy.

Tested by: Bilal Ahsan Reviewed By: Usman Ali


TERASAKI TEMPOWER 2 Page 3 of

AGR-31B
TEST REPORT

6. VISUAL INSPECTION

Terasaki ACB – Front View AGR-31B Relay

Terasaki ACB – Nameplate Information Terasaki ACB – Back View

Tested by: Bilal Ahsan Reviewed By: Usman Ali