PT PEMBANGKITAN JAWA BALI No. Dok. : PTN9/ME21/B.F.

15
PJB INTEGRATED MANAGEMENT SYSTEM Tgl. Terbit :
FORM UJI Revisi : 000
VISUAL INSPECTION Halaman : 1 of 2
Site : UBJOM Paiton Manufaktur : Tahun QP No. :
Unit : 9 Inspeksi : ME 2021 OEM Doc. No.
Furnace Waterwall - Front Side (Selatan) - Sootblower 15

T11 T9
T8

tube bergelombang/bulging
SB D15

T11 T9

T8

RECOMMENDATION ACCEPTED/REWORK/REPLACE
(by Quality Control) dilakukan retubing
Measuring Tool: Mistar, Visual, Camera digital

Description Tested/measured by Coordinator Checked by Witness


Name Afrialdi Wedha A. L. Andy Wahyu Arianto

Signature

Date 18-Feb-21 19-Feb-21


PT PEMBANGKITAN JAWA BALI No. Dok. : PTN9/ME21/B.F.15
PJB INTEGRATED MANAGEMENT SYSTEM Tgl. Terbit :
FORM UJI Revisi : 000
VISUAL INSPECTION Halaman : 2 of 2
Site : UBJOM Paiton Manufaktur : Tahun QP No. FU No.
Unit : 9 Inspeksi : ME 2021 OEM Doc. No.
Furnace Waterwall - Front Side (Selatan) - Sootblower 15

terlihat tube sekitar sootblower C15 mengalami erosi

nozzle lancetube sootblower lepas


(sootblower A15)

nozzle lancetube sootblower lepas


(sootblower B15)

RECOMMENDATION ACCEPTED/REWORK/REPLACE
(by Quality Control) dilakukan perbaikan
Measuring Tool: Mistar, Visual, Camera digital

Description Tested/measured by Coordinator Checked by Witness


Name Afrialdi Wedha A. L. Andy Wahyu Arianto

Signature

Date 18-Feb-21 19-Feb-21