SFG TANK RELOCATION AND FUNCTION

Project Title : BULK LIQUID DESIGN


Project Owner : PT. Bentoel Prima Date :
Consultant : PT. Archetype Indonesia Report No. :
Main-Contractor : PT. Livia Andalan Indonesia Page : of
Document No. : QA/QC-ELE-LIVI-33 Rev. :

Sheet No, : Area/Location :


Drawing Hook-up No. : Unit/ Facility :

RESULT ACCEPTED
NO. ITEM TO CHECK REMARKS
YES NO N/A DATE SIGN
A INSTALLATION
1 SFG Tank relocation completed
2 No mechanical damage after relocation
3 Base plate for SFG Tank completed
4 Cable Installation and termination completed

B FUNCTION
1 Voltage Check
2 Phase Sequence Check
3 Start Stop Motor Test
4 Motor run test
5 Control Valve test
6 Function test for SFG Tank system
7 Motor Rotation
- CW
- CCW

Note. :

Prepared by, Witnessed/Reviewed by, Approved by,


PT. Livia Andalan Indonesia PT. Archetype Indonesia British American Tobacco

Print name Date Print name Date Print name Date