You are on page 1of 4

EParts Rôplacemer)t and cleäning > lmage Fornlatrün systenì > Renrovrrrg the rl-B > procecJure

4-95
Removing the ITB 3) Pull the ITB Pressure Release Lever to the front
4) Remove the harness.
! Preparations . 3 wire saddles

1)Upgrade the nrachine to the follow¡ng version or later


. 1 edge saddle

MN-CON: Ver.34.05 D-CON: Ver.18.01


2)Open the Front Cover, Right Lower Cover and Right Upper Cover.
3) Remove the ITB Cover.
4)Remove the ITB Unit.
5) Remove the ITB Cleaning Unit.

CAUTION:

Do not tough the surface of lrB. (lf needed, hold the lrB within l omm from both edge
of the belt.)

I Procedure 5) Remove the rear p¡n.


. 1 screw
1) Turn over the ITB Unit.
2) Remove the Push Slider.
. 1 stop ring

F-4-129

Replacement and cleantng > lmage Fornration sysrenì >


Renrovrrrç.1 the lrB > procedure 4-95
øParts
Parts Replacernenl and creaning >
lmage Fcrrmatlcrn system > Renroving
the rr' > proceclure

'tanc it on [þg l-l s, r-:ny,¡


7) Pull out the front p¡n.

8) Bend the secondary Trensfer


lnner Roter unit by g0 degree and reinsta,
removed in step 7). it with the pin

Replacement and clea^ing >


lmage Formation syster > Rerrrovinç¡ ,re rrB > procecrure
AParts
øParts Replacemerìt and cleäning )' lmâge Ëornr¿¡hon system > Re.ìüvrng
the t B ;, procecrure
A C\J
T-Jf
9)lnsert papers as shown in the figure to prevent the ITB gett¡ng damage
by the plate when
removing the lTB.

F_4_135
10) Hold the ITB within 1omm from the edge and remove
¡t upward

F-4-136

Reptacement arrd creani^g > lmage Formation


syster > R-"nrovinç1 the rrB > procedure 4-97
ÃParts
ÃPar1s Replacement and cleanÍng > f mage Fo¡'mation
system > *un,ou,nn t e primary Transfer Roter (Bk) > procecrure

I Actions after Replacement 4-98


nemoving the primary Transfer Roller (Bk)
1) Turn ON the power of the host machine. @
2)when the machine is in standby condition, execute
the
,'Auto
gradation correction,,. I Preparations
3) Execute the
rrB equiribrium position detection in serv¡ce mode (coprER >
FUNcrroN > 1)Open the Front Cover, Right Lower Cover
and Right Upper Cover.
MISC-P > ITBINÐ. This service mode will take
approx. 2 to 3 minutes. 2) Remove the ITB Cover.
3)Remove the ITB Unit.
4) Remove the ITB Cleaning Unit.
5) Remove the lTB.

I Procedure

Roller and Primary

Replacement and cleaning >


lmage Formation system >
Renroving the primary Transfer
AParts Roter (Bk) > procedu¡.e 4-98

You might also like