You are on page 1of 2

Date

FM-PEN-01/JS
WORK JS PROJECT JETTY
PLTU TANJUNG BALAI Report No Page
KARIMUN 2X7 MW
Of

Subject : LUQUID PENETRANT EXAMINATION REPORT

Client :

Project Area :

Name of Equipment :

Identification :

Applicable Code Stage Of Examited

As Welder After Hydro Test


Material
After P.W.H.T Others

Surface Preparation Grinding Machine Others

Type Color Contrast Fluorescent

Penetrant Application Spraying

Temperature Penetrant Time Minute

Water-Washable Penetrants Dray Developer


Removal Post-Emulsifying Penetrants Developing
Solven-Removable Penetrants Wet Developer

Location Examined

Satisfactory Attcment Report


Judgement
unsatisfactory

Welder Stamp : 01 02 03

ETI / PDP PUSMANPRO PLN

Name

Signature

Date
Date
FM-PEN-01/JS
WORK JS PROJECT JETTY
PLTU TANJUNG BALAI Report No Page
KARIMUN 2X7 MW
Of

Subject : LUQUID PENETRANT EXAMINATION REPORT

Client :

Project Area :

Name of Equipment :

Identification :

Applicable Code Stage Of Examited

As Welder After Hydro Test


Material
After P.W.H.T Others

Surface Preparation Grinding Machine Others

Type Color Contrast Fluorescent

Penetrant Application Spraying

Temperature Penetrant Time Minute

Water-Washable Penetrants Dray Developer


Removal Post-Emulsifying Penetrants Developing
Solven-Removable Penetrants Wet Developer

Location Examined

Satisfactory Attcment Report


Judgement
unsatisfactory

Welder Stamp : 01 02 03

ETI / PDP PUSMANPRO PLN

Name

Signature

Date