You are on page 1of 1

Sheet 29 of 45

Date :
Consortium of QI-L13 22-May-21

LOMBOK CFSPP FTP 2 (2x50 MW) PROJECT Doc. No.: Page :


of

Subject : LIQUID PENETRAN EXAMINATION REPORT Project No :

Client : PT. PLN (PERSERO)

Project Title : Lombok CFSPP FTP 2 (2x50MW)

Name of Equipment : DEMIAN WATER TANK B.


and Identification No.

Stage of Examined
Applicable Code ASME SECT.V

As Welded After Hydro. Test


Material PIPA A312 TP 304
After P.W.H.T. Others
Surface Preparation Grinding Machine Others
Type Color Contrast Fluorescent
Penetrant Application Brushing Spraying
Temperature 30 deg Penetrant Time 10 Minutes
Water-Washable Penetrants Dry Developer
Removal Post-Emulsifying Penetrants Developing
Solven-Removable Penetrants Wet Developer
Location Examined

Area BOP

MAIN HOLE 1. NOZZLE 12. NOZZLE11.


W : PSP-02.

Judgement Satisfactory Attachment Report


Unsatisfactory

Prepared by, Inspected by Witness by Approved


Signature Signature Signature Signature

NDT LEVEL II PT.REKAYASA INDUSTRI PT.PLN (Persero) PT.PLN (Persero)


PUSMANPRO UPP NUSRA 1
Date : 22 MEI 2021 Date : Date : Date :