Date : 29/11/2014 Page : 1 of 9 F – S.C.

46 Konsultan

Report No : 01/Penetrant test


Kontraktor
Liquid Penetrant Examination Report

Project : Power plant Phase IV


Name of Eq.
& Identification
: 01/pt/pbs/2104
No

Stage of Examined :
Applicable Code ANSI / AWS D.1.1

 As Welded  After Hydrotest


Material Gip mid class
 After P.W.H.T  Other
Surface Preparation  Grinding  Machine  Other
 Type  Color Contrast  Fluorescent
Penetrant  Application  Brushing  Spraying
 Temperature Penetrant time 10 minutes
 Water washable penetrant  Dry Developer
Developing
Removal  Post emulsifying penetrant  Wet Developer
 Solven removable penetrant
Location Examined
WTP 2 Line 08

Pile No.

Joint No.01

Attachment report :
 Satisfactory Mapping drawing
Judgement
and pictur
 Unsatisfactory
Remarks :
Result of good test

Consultan Contractor Owner


Name Djuri Mimar Kodina Samsir
Date : 29/11/2014 Page : 1 of 9 F – S.C.46 Konsultan

Report No : 01/Penetrant test


Kontraktor
Liquid Penetrant Examination Report

Signature
Date 29 Nov. 2014 29 Nov. 2014 29 Nov. 2014