Connection Of Mezzanine's Main

Beam With The Column

Mx= 19.78 t.m Qy= 17.3 ton


IPE 500 M20(8.8)
TENSION-
Yct = 96.8
T = C = Mx/Yct = 20.4 ton
μ ∅2
Tall = 0.33Fub* 4 = 5.31 ton
n = T/Tall = 4 Bolts

1
SHEAR-
μ ∅2
Rshear= 0.25Fub* 4 = 4 ton
q(single bolt) = 17.3/6 = 2.9 ton
q < Rshear ∴ safe
:HEAD PLATE-
M= (20.4*11.6)/8 = 29.58
tp= √ 6∗29.58
20∗1.4 = 2.52 = 3 cm

:WELD-

:For Moment*
xMxamY
=f

dlewxI

Ymax= 49.9

2
0.7∗42.63 7.64∗0.73
I =4(
x 12
+0.7∗42.6∗24.2
2
)+ 4( 12
+ 0.7∗42.6∗1.5 )+ 4(
2

42.6∗0.73 2 20∗0.7 3 2
12
+0.7∗42.6∗47.25
)+ 2( 12
+0.7∗20∗49.55
)= 204450

f = 0.48 < 0.2Fu ∴ safe


:SHEAR-
17.3
q= 4∗42.6∗0.7 = 0.14 < 0.2 Fy
feq = √ 0.48 +3∗0.14 = 0.54 < 1.1*0.2Fu