Major Project Report


On

“PARTIAL REPLACEMENT OF CEMENT WITH RICE HUSK ASH


ON CONCRETE ”
In partial fulfillment for the award of degree of
Bachelor of Technology
In
Civil Engineering

By
KANDADI HEMANTH REDDY 17RA1A0107

Under the Esteemed Guidance of


MS.S.SWETHA
Assistant Professor

DEPARTMENT OF CIVIL ENGINEERING


KOMMURI PRATAP REDDY INSTITUTE OF TECHNOLOGY
(AFFILIATED TO JNT UNIVERSITY, HYDERABAD)
GHANPUR, GHATKESAR, RANGAREDDY
2020-2021
KOMMURI PRATAP REDDY INSTITUTE OF TECHNOLOGY
Adjacent to NTPC Power Grid, Ghanpur Village, Ghatkesar, Telangana

DEPARTMENT OF CIVIL ENGINEERING

CERTIFICATE

This is to Certified that the major project entitled “PARTIAL REPLACEMENT OF CEMENT
WITH RICE HUSK ASH ON CONCRETE” is being submitted by the following student(s) IV
B.Tech II Semester in partial fulfillment of the requirements forth ward of degree of Bachelor of
Technology in Civil Engineering of The Jawaharlal Nehru Technological University,
Hyderabad during the year 2020-21.

KANDADI HEMANTH REDDY 17RA1A0107

Internal Guide Head of the Department


Ms.S.SWETHA Mr.K.ANJANEYULU
Assistant Professor Assistant Professor

External Examiner
ACKNOWLEDGEMENT

With great pleasure I want to take this opportunity to express my hear felt gratitude to all the
people who helped in making this mini project work a grand success.
I express my deep sense of gratitude to for his constant guidance throughout our major
project work
I grateful to Ms.S.SWETHA, for her amiable ingenious and adept suggestions and pioneering
guidance during my major project work.
I express my deep sense of gratitude and thanks to Asst Prof. K. Anjaneyulu, Head of the
department of CIVIL Engineering for his support during my major project.
First of all I am highly indebted to Principal Dr. D. ESHWAR, for giving me the permission
to carry out this major project.

I also very thankful to my Management, Staff Members and all My Friends for their
valuable suggestions and timely guidance without which I would not have been completed it.

By

KANDADI HEMANTH REDDY 17RA1A0107


DECLARATION

I hereby declare that this A Major Project entitled “PARTIAL REPLACEMENT OF


CEMENT WITH RICE HUSK ASH ON CONCRETE” in partial fulfillment of requirements
for the award of degree of “Civil Engineering” is a Bonafide work carried out by me during the
academic year 2020-21.
I further declare that this project is a result of our effort and has not been submitted for
the award of any degree or diploma by us to any institute.

KANDADI HEMANTH REDDY 17RA1A0107


ABSTRACT

Concrete is one of the significant material of the construction industry. These days
because of expansion in a population, the demand of infrastructure is expanding day by day. This
prompts the increment in production of cement .In the present scenario the overall cement
production is about 4.1 billion metric tons worldwide. This huge amount of production prompts
utilization of natural resources and it is very unsafe for environment. Enormous amount of waste
by-products are delivered from the manufacturing enterprises, for example, mineral slag, fly ash,
silica fumes, rice husk ash and so on. The rice husk ash is an agricultural by product which is
obtained from the rice mills ,the husk which is obtained from mill is of no use i.e it is not even be
used for animals to eat. Hence it is used as a fuel in various big industries the burning
temperature is very high hence they are obtained from that. The RHA is very lightweight.
In this project summarizes the feasibility of using partial rice husk ash on the cement in order to
mitigate the availability, affordability, quality and pollution issues. This work deals with the
partial replacement of cement with RHA in concrete at various percentage such as 0%, 30%, and
40% by mass of cement. The concrete specimens of M20 grade were casted by replacement of
cement to RHA by weight 0%, 5%, 10%, 15%, 20%, 25% on these various experimental
investigations are carried out to find out strength parameters, workability of concrete samples
cured for period of 7 and 28 days curing in water served as the control. Testing is included for
the strength, workability (water binding ratio and setting time). The test results revealed that the
workability and strength are slightly better than the standard concrete by satisfying the limits
initiated endorsed by standard.