Professional Documents
Culture Documents
1 SCOPE
1.1 This SOP specifies the general requirement of Iqc procedure for Quality Control Department
1.2 This SOP is applicable in overall IQc procedure for Home Appliance products
1.3 This SOP is not applicable for others department
1.4 This SOP is only applicable for Home Appliance Quality Control department only
5 METHOD
Process Reson Of this Standard,Drawing, Appendix
No Major Steps Photo Description
Code No Activities OR Checklist No
After completing the sample , Technician To identify visual Lighting condition should be
3 IQC Lab
could brouht the sample in IQC Lab problem enough;
To identify
Measuremen Measurement check should be done
5 t check according to the specification and drawing. measurement related
problem
8 Make report Record the test data and make a report To make decision
DRAFT CHECK APPROVE WALTON HI- TECH INDUSTRIES LTD.
Chandra,Kaliakoir,Gazipur
Joy Saha Md. Shahadat Ullah Muzahidul islam Dept Name QC (WHAP)
Sr.Deputy Assistant Director First Sr. Deputy Director Senior Additional Director
Section
PAGE NO. 01 Ref. No. IHHqCIRA02 Rev. No. 1.00 Sub Section
FORMAT NAME SOP of IQC Inspection for sticker Item DATE ISSUED 28/11/20
PAGE NO. 01 OF 0 Ref. No. IHHqCIRA02 Rev. No. 1.00 Sub Section
Walton Hi-Tech Industries Limited
Chandra, Kaliakoir,Gazipur
Department of Home Appliance QC
IQC Parameter
Rice Cooker Product
1 Packaging condition
1. Net weight:
3 Box weight labeling information 2. Gross weight
4 Check lot qty according to order qty should be matched
5 Carton condition New carton must be used. No torn carton can not
be used
6 Carton unfolding direction Upward arrow mark should be on carton
2 Initial lot qty of parts wise 9 Count the box and total parts wise qty before inspection start set qty - 322
6 Micro switch life test report 13 Check supplier end Micro switch electrical life test report should be pass as per their standard
7
PSI team need to put the mark/seal on carton on beside of carton
8 PSI done marking
labeling sticker;
PSI team need to mention the box number in the report parts
9 Inspection done box number mention
wise which are inspected
Check visual accuracy of control panel ,leg support,handle fittings Any kind of unfitting condition / gap/broken is not
4
with body & iron arm, microswitch fittings with middle layer. allowed.
1.8L: 252mm
8 2.2L: 265mm
2.8L: 290mm
10 Body aappearance No scratch, deformation is allowed
11 Middle layer Material, Sheet thickness 0.35mm (+/-0.02mm)
1.8L: 320g (+/-10)
12 Middle layer Weight 2.2L: 365g (+/-10)
2.8L: 440g (+/-10)
Body with
middle layer 1.8L: 253.3 (+/-0.2mm)
13 Middle layer Outer Dia 2.2L: 266.3 (+/-0.2mm)
2.8L : 291.3mm (+/-0.2mm)
15 Middle layer rust issue No rust in any portion is allowed.
16 Middle layer Color uniformity all side (inside and outside) Color coating should be uniform
Page 7 of 14
Body with
middle layer
20 Control panel cutting position height from bottom level of body Should be similar in this lot
2 Body with Accessories
22 Check visual apearance for steamer. Scratch/ spot/ color coating/ deformation/broken
is not allowed.
SS410
1.8L: 0.22mm (+/-0.01mm)
23 Material, Sheet thickness
2.2L: 0.22mm (+/-0.01mm)
2.8L: 0.22mm (+/-0.01mm)
1.8L - 155g
Steamer 24 Weight without handle 2.2L - 163g
2.8L -205g
25 Check steamer fitting on innerpot proper fitting and no up-down
Innerpot
Small innerpot should be placed normally inside big
32 Innerpot height
innerpot normally (without force)
36 Check are all respective parts assembled with heating plate? No scratch on top surface is allowed
38 Heating plate Terminal alignment No extra material should not be under terminal
insulation ring (white color)
SGA180/C182 - 65.85-76.82 ohm;
39 Heating plate Terminal extra material SGA220 - 51.2 - 59.75 ohm
SGA280 - 46.1 - 53.78 ohm
42 Only Heating plate weight 1500V,3S ,machine current not exceeds 3mA;
43 Hipot Test
44 Insulation resitance test No gap must not be. Measurement can be done by
a paper.
46 Curvature gap between innerpot and heating plate Should be similar with picture
Match the parts with reference picture and notice arrow marked SGA - 1.8L - 155.5 mm;
47 SGA - 2.2L - 179 mm;
point specially SGA - 2.8L - 193 mm;
1.8L: 184.6mm
48 Outer diameter of heating plate . 2.2L: 203mm
2.8L: 213.5mm
Page 8 of 14
SN Item list SN Checklist Standard/requirement
1.8L: 85g (+/-5)
49 2.2L: 100g (+/-5)
2.8L: 115g (+/-5)
55 leg screw hole diameter Should be symmentrical with 3 side screw hole
56 Screw hole position matching with body No breakage, should be transparent and tempered
glass
57 Apperance 4mm (+/-0.3)
1.8L: 410g (+/- 10g)
58 Thickness 2.2L: 480g (+/- 10g)
2.8L: 570g (+/- 10g)
59 Weight 2 pcs with 6mm dia
5 Glass lid SGA - 1.8L - 227.5 mm;
60 Steam release hole diameter SGA - 2.2L - 245.8 mm;
SGA - 2.8L - 267.5 mm;
61 Check Diameter easy fitting and not much gap between Lid and pot
Check appearance for body such as tap, scratch or any other No plastic up-down/ loose fitting/ gap with body/
2 color/spot issue position misalignment – need video
3 Control panel position, fititng and gap with body Center position and flat level not angled
4 Control lever knob position and level in control panel slot from Easy and flexible movement. No jam is allowed.
outside view
Should be free and easily rotating.
5 Control lever up-down for 'cook' & 'warm' with no-load and load
Should not be stucked into middle layer
6 Inner pot putting-removing and rotation into rice cooker No gap with Lid cover
7 Lid handle fitting No up-down/gap is not allowed
Fitting &
15 Check body fitting with bottom part and ring specially curling and No plastic up-down/ loose fitting/ gap with body/
appearance 8
lock seaming position position misalignment – need video
9 Control panel fitting No movement of body and proper fitting
10 Body fitting with middle layer No loose fitting and breakage of hadle
11 Handle loose fitting issue No misalignment
Steamer loose fitting ,movement and fall down into
12 Steamer handle alignment with body
inner pot are not allowed.
13 Check Steamer properly sitted on inner pot or not? Lid loose fitting ,movement and fall down into
steamer are not allowed.
14 Check lid properly sitted on Steamer or not? Small uniform gap can be allowed
Have any gap between bottom cover and body around the whole
15 side 1500V,3S ,machine current not exceeds 3mA;
Running test
20 (Water boil for 2 27 Check wire connection and any burn issue?
hour)
Page 10 of 14
ndustries Limited
iakoir,Gazipur
ome Appliance QC
rameter
ker Product
Major Visual
Minor Visual
Major Count
Major Visual
Major Visual
Major Visual
Major Visual
Major Count
Major Visual
Major Visual
Major Visual
Major Visual
Major Visual
Major Visual
Major Visual
Major Visual
Major Visual
Major Measure
Major Measure
Major Measure
Major Visual
Major Visual
Major Measure
Major Measure
Major Visual
Major Visual
Major Visual
Page 11 of 14
Category Inspection type Remark
Major Visual
Major Measure
Major visual
Major visual
Major visual
Major Measure
Major Measure
Major Visual
Major Visual
Minor Measure
Major Visual
Major Measure
Major Measure
Major Measure
Major Measure
Major Visual
Major Visual
Major Visual
Major Visual
Major Visual
Major Visual
Major Measure
Major Measure
Major Measure
Major Measure
Major Measure
Major Visual
Major Visual
Major Measure
Page 12 of 14
Category Inspection type Remark
Major Measure
Major Measure
Major Visual
Major Visual
Major Measure
Major Visual
Major Measure
Major Visual
Major Visual
Major Measure
Major Measure
Major Measure
Major Measure
Major Visual
Major Measure
Major Visual
Major Visual
Major Visual
Major Measure
Major Visual
Major Measure
Minor Measure
Major Measure
Major Measure
Major Measure
Major Visual
Major Measure
Major Measure
Major Visual
Major Measure
Major Measure
Major Visual
Major Visual
Major Count
Major Measure
Major Measure
Major Measure
Major Measure
Major Measure
Major Measure
Major Measure
Major Measure
Major Measure
Major Measure
Major Measure
Major Visual
Major Visual
Major Visual
Major Visual
Major Visual
Major Visual
Major Visual
Major Visual
Major Visual
Major Visual
Major Visual
Major Visual
Major Visual
Major Visual
Major Visual
Major Measure
Page 13 of 14
Category Inspection type Remark
Major Measure
Major Measure
Major Visual
Major Measure
Major Measure
Major Visual
Major Visual
Major Measure
Major Visual
Major Visual
Page 14 of 14