Interlock or Paving Block Works Method Statement
Interlock or Paving Block Works Method Statement
Share1Save
There are projects that sometimes can proceed for interlock or paving
block works while progressing the main project. This is sometime a
technique of the management to avoid workers to be idle if they have
extra people while the project is at starting stage.
So here are the method statement for interlock work that you might
want to learn how it will be done.
1. Title
3. Work procedure
1. Preparation
Before interlock work starts, make sure that sub-grade is
compacted when the area is above natural ground.
The sub-base shall be compacted with vibratory roller, size
of roller shall be suitable for the area where it could
maneuver and can move back and fort.
Once compacted and met the specification requirement for
compaction and approved by Engineer, base course shall
then be placed above compacted sub-base but make sure
thickness of the bases are as per approved drawing.
MEP rough-in or underground embedments (wherever
applicable) shall be in placed before interlock work
commences.
In the areas where there are kerb stone, the blinding shall
be constructed first serve as the base but make sure it shall
be as per drawing.
The importance of pre-installation of kerb stone is to
prevent the migration or dis-alignment of interlock or block,
and it will serve as reference line or level.
After compaction of base-course, the black sand shall be
laid on it of 50 mm thick. There are cases that the bedding is
mixed with cement to adhere cohesiveness but it will be as
per specification requirements.
2. Installation of Interlock or Paving block
4. Safety
1. Interlock cutter
2. Plate compactor
3. Wheel borrow
4. Meter
6. Materials and references