The document provides details on the parameters and performance of a production drill. It measures the width, height, area, densities, and capacities of the stopes and drill holes. It also outlines the cycle times for setup, drilling, delays, and productivity. On average, the drill can drill 216 meters per cycle in 7.9 hours, producing 1,665 metric tons per row. Over a month it can drill over 13,000 meters and produce over 101,000 metric tons of rock.
The document provides details on the parameters and performance of a production drill. It measures the width, height, area, densities, and capacities of the stopes and drill holes. It also outlines the cycle times for setup, drilling, delays, and productivity. On average, the drill can drill 216 meters per cycle in 7.9 hours, producing 1,665 metric tons per row. Over a month it can drill over 13,000 meters and produce over 101,000 metric tons of rock.
The document provides details on the parameters and performance of a production drill. It measures the width, height, area, densities, and capacities of the stopes and drill holes. It also outlines the cycle times for setup, drilling, delays, and productivity. On average, the drill can drill 216 meters per cycle in 7.9 hours, producing 1,665 metric tons per row. Over a month it can drill over 13,000 meters and produce over 101,000 metric tons of rock.
Parameter Measurement Width, m 5 Height, m 4.5 Area, m2 22.5 Stope width, m 15 Stope height, m 20 Area, m2 300 Area total, m2 277.5 Rock density (wet), t/m3 2.4 Stope burden, m 2.5 Stope space, m 2.5 Metric tons per row, t 1665.0 Number of charged holes 16 51-mm-diameter face holes, meters drilled, m 216.0 Metric tons per meters drilled, t/m 7.7
Production drill cycle time
Component Measurement Setup Tramming speed, k/h 4 Average distance between stopes, km 0.0025 Tramming time, min 0.0375 Setup and markup time, min 10 Total setup time, min 10.0375 Setup time (=engine hours) per cut, h 0.2 Drilling Cycle Instantaneous penetration rate, 51-mm holes, m/min 0.57 Meters drilled, 51-mm holes, m 216.0 Drilling time, 51-mm holes, min 378.9 Total drilling time, h 6.3 Holes drilled 16 Setup time per hole drilled, min 5.5 Total set-up time, min 88 Total set-up time, h 1.5 Total set-up and drill time, h 7.8 Total time per face, h 7.9
Production drill performance
Component Measurement Roster Days per year 360 Days worked per week 7 Days worked per month 30.0 Shifts per day 2 Shift length, h 12 Delays Shift change, h 1.2 No stope available, h 0.85 No power, h 0.5 Meetings, h 0.7 No ventilation, h 0.2 Pump/water problems, h 0.1 Maintenance/breakdown, h 0.4 Total delays, h 3.95 Productivity Balance of shift available, h 8.05 Rows drilled out 1.01 Meters drilled per shift, m 219 Meters drilled per working day, m 437 Meters drilled por month, m 13,123 Metrics tons per shift, t 1,686 Metrics tons per working day, t 3,372 Metrics tons per month, t 101,160 ancho x alto