You are on page 1of 3

S.No.

Bridge Number Bridge Name Road Name


Site 2 Site bridge (Headworks)
Site 3 Adit Bridge
1 30-F030-018 Timbhu Panchkhal - Melamchi - Helambu
2 30-F030-017 Dungtemba Panchkhal - Melamchi - Helambu
3 30-F030-016 Chuda lehung Panchkhal - Melamchi - Helambu
4 30-F030-015 Katike Panchkhal - Melamchi - Helambu
5 30-F030-014 Thado Khola Panchkhal - Melamchi - Helambu
6 30-F030-013 Melamchi(Rato Pul) Panchkhal - Melamchi - Helambu
7 30-F030-012 Gori Panchkhal - Melamchi - Helambu
8 30-F030-011 Thuloshora Panchkhal - Melamchi - Helambu
9 30-F030-010 Gyallthungh Panchkhal - Melamchi - Helambu
10 30-F030-009 Talamaryang Panchkhal - Melamchi - Helambu
11 30-F030-008 Nuwar Panchkhal - Melamchi - Helambu
12 30-F030-007 Jayashori Panchkhal - Melamchi - Helambu
13 30-F026-007 Indrawati Chabahil - Sankhu
unallocated Bridge 2 melamchi(simle)

Destroyed Bridge name Length(m)


Dungtemba 28
Timbhu 42
Indrawati 105.83
Bridge 2 melamchi(simle) 70
Site bridge (Headworks) 40
Adit Bridge 25
Total cost
River/Stream Length(m) Width(m) Span No Foundation Type Cordinate
MelamchiKhola 40 1
MelamchiKhola 25 1
Timbhu 42 RW-4.66 | CW-4.25 2 RCC Foundation 27.9496 | 85.5446
Dungtemba 28 RW-4.94 | CW-4.5 1 RCC Foundation 27.9425 | 85.5508
Chuda Lehung Khola 23.5 RW-4.94 | CW-4.5 1 RCC Foundation 27.9334 | 85.5567
Katike Khola 23.5 RW-4.94 | CW-4.5 1 RCC Foundation 27.9315 | 85.5565
Thado Khola 23.5 RW-4.94 | CW-4.5 1 RCC Foundation 27.9271 | 85.5541
MelamchiKhola 41 RW-5 | CW-4 1 RCC Foundation 27.9009 | 85.5440
Gori Khola 21.5 RW-5.75 | CW-4.25 1 RCC Foundation 27.8973 | 85.5416
Thuloshora 7.3 RW-5.1 | CW-4.5 1 RCC Foundation 27.8926 | 85.5380
Gyallthungh 43 RW-5.75 | CW-4.25 2 RCC Foundation 27.8861 | 85.5392
Talamaryang 64.5 RW-5.75 | CW-4.25 3 RCC Foundation 27.8680 | 85.5387
Nuwar 25.5 RW-5.75 | CW-4.25 1 RCC Foundation 27.8500 | 85.5518
Jayashori Khola 14.5 RW-5.4 | CW-4 1 RCC Foundation 27.8278 | 85.5739
Indrawati 105.83 RW-5.75 | CW-4 3 RCC Foundation 27.8287 | 85.5767
MelamchiKhola 70 2

Amount
50,400,000.00 cost of 50m bridge 90,000,000.00
75,600,000.00 cost of 1 m bridge 1,800,000.00
190,494,000.00
126,000,000.00
72,000,000.00
45,000,000.00
559,494,000.00
Bridge Type Ref location Status

RCC T-Beam
RCC T-Beam
RCC T-Beam Near healmbu gaupalika
RCC T-Beam
RCC T-Beam Kiul
Steel Truss
RCC T-Beam
RCC Slab Shera
RCC T-Beam
RCC T-Beam
RCC T-Beam Jagat ghar
RCC T-Beam Pul bajar
RCC T-Beam
RCC T-Beam

You might also like