Minutes of Meeting

DOCUMENT NUMBER FILE CODE DATE PAGE


002/MOM/JINDI-TJAUN/XI-2020 20/11/2020 1 of 4

MOM No: 02
Title / Subject: Weekly Meeting EPC Hari#1, Hari#2 Flowline and Hari Pipelines Project
Place: Online, Zoom meeting
Date: Friday , 20 Nov 2020

Set Time: 09.00 – 10.00 WIB

Meeting Chair:

Jindi South Jambi B Triagung Jaya Abadi


1. Mr. Peter
1. Mr. Luan Zhenhua 2. Mr. Faeruzy Arnandi
2. Mr. Roy Primasatria 3. Mr. Tomy
3. Mr. F. Janto 4. Mr. A. Hernadi Wibowo
Attending: 4. Mr. A. Sabidi 5. Mr. Suharto
5. Mr. Michael Sutirta 6. Mr. Minannur
6. Mr. A. Akbar 7. Mrs. Citra Widayanti K.
8. Mr. Irvando
9. Mrs. Ocky Meilianie P
10. Mr. Hari Sofyedi
Safety/Quality Moment : 11.
12.

PROPRIETARY INFORMATION

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION BELONGING TO JINDI SOUTH JAMBI B AND MUST NOT BE WHOLLY OR PARTIALLY REPRODUCED NOR DISCLOSED WITHOUT PRIOR WRITTEN PERMISSION FROM JINDI
SOUTH JAMBI B
Minutes of Meeting
DOCUMENT NUMBER FILE CODE DATE PAGE
002/MOM/JINDI-TJAUN/XI-2020 20/11/2020 2 of 4

No Discipline Description PIC Target Date Status


1 Contract Overview 
2 GENERAL  Overall Progress Cut Of Date : 20 Nov 2020
 Cumm Plan : __ %
 Cumm Actual : ___%
 Deviation : 0%
 Issue related to deviation:

 Company request for all engineering target and procurement target


achieved or meet the target
 Company asks the Contractor to achieve the target project with safety
and quality.
 Company suggested Contractor to contact JINDI site Reps. before
communicate with the local people.

3 PROJECT CONTROL  Company ask to Contractor to do reporting and submit project progress TJA 27 Nov 2020 OPEN
report in first week for all process (engineering, procurement, also
construction)

4 HSE  Company request Contractor to accommodate the local people TJA


considering to minimizing the social issue.
 Company remind about risk of the venomous animal in project location TJA Info
to prepare the antigen for the workers or Contractor could cooperate
with Puskesmas around the project site

PROPRIETARY INFORMATION

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION BELONGING TO JINDI SOUTH JAMBI B AND MUST NOT BE WHOLLY OR PARTIALLY REPRODUCED NOR DISCLOSED WITHOUT PRIOR WRITTEN PERMISSION FROM JINDI
SOUTH JAMBI B
Minutes of Meeting
DOCUMENT NUMBER FILE CODE DATE PAGE
002/MOM/JINDI-TJAUN/XI-2020 20/11/2020 3 of 4

No Discipline Description PIC Target Date Status


 Contractor shall contact JINDI Site Reps.(Pak Agus or Pak Nurcholis) to Info
communicate about the project safety protocol especially for COVID 19
issue.

5 ENGINEERING  TIP will arrange regular coordination with TJA for design engineering
for all long lead material
 TIP confirmed to complete design basics and PNID for submit to TJA
included schedule and S-Curve.
 TJA and TIP will conduct site survey and will report to Company for
the survey result.

6 PROCUREMENT  Contractor already release Purchase Order for material Pipe 6” CS


API 5L X52 to Vendor
 Company request to Contractor to really assure the China Vendor TJA
about the API Monogram Status
 Company request fit or clear schedule for long lead item material
and Contractor shall assuring that the delivery for critical item really
meet the JINDI’s schedule
 If possible, Contractor could directly coordinate to Company for
make sure about the import material matter

7 QA/QC N/A

8 CONSTRUCTION &  Contractor already have Site survey schedule on Saturday, 21 Nov Info
FABRICATION 2020

PROPRIETARY INFORMATION

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION BELONGING TO JINDI SOUTH JAMBI B AND MUST NOT BE WHOLLY OR PARTIALLY REPRODUCED NOR DISCLOSED WITHOUT PRIOR WRITTEN PERMISSION FROM JINDI
SOUTH JAMBI B
Minutes of Meeting
DOCUMENT NUMBER FILE CODE DATE PAGE
002/MOM/JINDI-TJAUN/XI-2020 20/11/2020 4 of 4

No Discipline Description PIC Target Date Status


 Contractor shall use professional surveyor considering to make sure TJA
the measurement of the pipeline
 Contractor inform that the surveyor will take 7 up to 10 days to do Info
the work

9 OPERATION  N/A

10 OTHERS  N/A

JINDI SOUTH JAMBI B TRIAGUNG JAYA ABADI

Mr. A. Sabidi Mr. Faeruzy Arnandi


Operation Manager Project Manager

PROPRIETARY INFORMATION

THIS DOCUMENT CONTAINS PROPRIETARY INFORMATION BELONGING TO JINDI SOUTH JAMBI B AND MUST NOT BE WHOLLY OR PARTIALLY REPRODUCED NOR DISCLOSED WITHOUT PRIOR WRITTEN PERMISSION FROM JINDI
SOUTH JAMBI B