ACCIDENT / INCIDENT Page No. Page 1
INVESTIGATION
Issued Date 18/11/2023
REPORT
DESIGN AND BUILD MEP CONTRACT FOR DETAILED DESIGN, AUTHORITY SUBMISSION, DELIVERY,
INSTALLATION, TESTING & COMMISSIONING, OBTAIN CERTIFICATE OF COMPLETION & COMPLIANCE, SUPPORT
DURING DEFECTS LIABILITY PERIOD, AND MAINTENANCE OF PHASE 2 DATA CENTRE FOR BRIDGE DATA
CENTRE MALAYSIA III SDN BHD ON HS(D) 78142 PTD 32674, MUKIM OF BUKIT BATU, DISTRICT OF KULAI
STATE OF JOHOR, MALAYSIA
7. Immediate Action
• Immediately Gensis ESH personnel bring the guy to Clinic Kelapa Sawit for medical treatment.
• The workers referred to doctor, and doctor advised to sews up the wound (5 stitches) with medicines.
8. Acknowledgement
Immediate Superior Safety Officer Project Manager
Reported by
AUTHORITY :
BOMBA/POLICE Yes / No Yes /
SOCSO Yes / No SITE OFFICE Yes / No HQ
/DOE/ DOSH No
Finding:-
• Slippery condition raining
13. Comments
Comment PMX Safety and Health Comment :
PMX Project Manager
Officer
Muhamad Raihan Mohd Khirol Izam
Date : Date :
14. Follow-up Status on Corrective and Preventive Action by Lead Investigator (as per item#11 & 12 agreed)
No. Item Due Date Status Remarks Initial
Date : Date :
CHRONOLOGY
17th nov 2023,14.30 hrs
Two workers start work at roof top using staircase 14 and install CU unit.
17th nov 2023, 16.00 hrs
Due to rain work stop at our workers rest inside the staircase 14. and workers resume work at CU unit at 5.00pm
When during the work of installing the CU unit one of the worker slippery from the stairs because the floor was wet and
another worker was holding the ladder said while holding the ladder he could not control the ladder because the ladder
was bare.
17th nov 2023, 17.32hrs
Then The Witness Informed With HSE and site Supervisor Then The personal HSE Arrange To Bring The Victim To
near Clinic.
Send worker to see doctor and doctor doing treatment around 6.20pm (5 stitches) and get medicines from clinic.
PMX MALAYSIA SDN BHD Reg. No. 202201018355 (1464052-K)
Unit 30-01 Level 30, Tower A Vertical Business Suite Avenue 3, Bangsar South, No.8 Jalan Kerinchi, 59200 Kuala Lumpur, W.P.
Kuala Lumpur, Malaysia
Tel: +60 3-5569 3881
Doc.Ref
ACCIDENT / INCIDENT Page No. Page 1
INVESTIGATION REPORT Issued Date 14/07/2023
DESIGN AND BUILD MEP CONTRACT FOR DETAILED DESIGN, AUTHORITY SUBMISSION, DELIVERY,
INSTALLATION, TESTING & COMMISSIONING, OBTAIN CERTIFICATE OF COMPLETION & COMPLIANCE, SUPPORT
DURING DEFECTS LIABILITY PERIOD, AND MAINTENANCE OF PHASE 2 DATA CENTRE FOR BRIDGE DATA
CENTRE MALAYSIA III SDN BHD ON HS(D) 78142 PTD 32674, MUKIM OF BUKIT BATU, DISTRICT OF KULAI
STATE
OF JOHOR, MALAYSIA
Attachment
Picture Description
INCIDENT AREA
INCIDENT AREA
INJURY PERSON