You are on page 1of 5

IDENTIFYING TRAINING GAPS

Required Units of Current Training


Competency/Learning Competencies Gaps/Requirements
Outcomes based on
CBC
BASIC COMPETENCIES
1. PARTCIPATE IN WORKPLACE COMMUNICATION
1.1 Obtain and Obtain and convey
convey workplace workplace information
information
1.2 Participate in Participate in workplace
workplace meetings and
meetings and discussions
discussions

1.3 Complete Complete relevant


relevant work work related
related documents
documents
2. Work in a team environment
2.1 Describe team Describe team role and
role and scope scope

2.2 Identify own role Identify own role and


and responsibility responsibility within
within team team

2.3 Work as a team Work as a team


member member
3. Practice career professionalism
3.1 Integrate Integrate personal
personal objectives with
objectives with organizational goals
organizational
goals
3.2 Set and meet Set and meet work
work priorities priorities
3.3 Maintain Maintain professional
professional growth and
growth and development
development
4. Practice occupational health and safety procedures
4.1 Identify hazards 1 Identify hazards and
and risks risks

4.2 Evaluate hazards Evaluate hazards and


and risks risks

4.3 Control hazards Control hazards and


and risks risks
4.4 Evaluate hazards Evaluate hazards and
and risks risks

4.5 Maintain OHS Maintain OHS


awareness awareness

Required Units of Current Training


Competency/Learning Competencies Gaps/Requirements
Outcomes based on
CBC
COMMON COMPETENCIES
1. Prepare construction materials and tools
1. Identify and access Identify and access
specification/man specification/manuals
uals
1.2 Requisition Requisition materials
materials

1.3 Receive and Receive and inspect


inspect materials materials
2. Observe procedures, specifications and manuals of instruction
2.1 Identify and Identify and access
access specification/manuals
specification/man
uals
2.2 Interpret Interpret manuals
manuals

2.3 Apply Apply information in


information in manual
manual
2.4 Store manuals Store manuals

3. Perform mensuration and calculations


3.1 Select measuring Select measuring
instruments instruments

1.2 Carry out Carry out


measurements measurements and
and calculations calculations
4. Maintain tools and equipment
4.1 Check condition Check condition of tools
of tools and and equipment
equipment
4.2 Perform basic Perform basic
preventive preventive maintenance
maintenance

4.3 Store tools and Store tools and


equipment equipment

Required Units of Current Training


Competency/Learning Competencies Gaps/Requirements
Outcomes based on
CBC
CORE COMPETENCIES
1. Prepare / Stake-out building lines
1. Prepare materials Prepare materials for
for stake-out stake-out building lines
building lines
1.2 Set batter boards Set batter boards

1.3 Fix stake-out Fix stake-out building


building lines lines
2. Fabricate formworks
2.1 Prepare materials Prepare materials for
for fabricating fabricating formworks
formworks
2.2 Lay-out Lay-out dimension of
dimension of form form sheathing and
sheathing and stiffeners
stiffeners

2.3 Assemble form Assemble form panels


panels
3. Install formwork components
3.1 Prepare Prepare materials, tools
materials, tools and equipment for
and equipment for installing formworks
installing
formworks
3.2 Lay- Lay-out/assemble
out/assemble scaffolds and braces
scaffolds and
braces
3.3 Set/fix form Set/fix form panels of
panels of building building components
components
4. Strip formwork components
4.1 Prepare staging Prepare staging area,
area, tools and tools and equipment
equipment
4.2 Strip formworks Strip formworks of
of building building components
components

4.3 Shore or/and Shore or/and re-shore


re-shore and and removal
removal
5. Install framing works
5.1 Prepare materials Prepare materials for
for framing works framing works

5.2 Lay-out/erect and Lay-out/erect and


assemble post, girts assemble post, girts and
and supports supports

5.3 Lay-out/install Lay-out/install floor


floor joists joists
5.4 Lay-out/install Lay-out/install wall
wall studs studs

5.5 Lay- Lay-


out/fabricate/install out/fabricate/install
roof frames roof frames

5.6 Lay-out/install Lay-out/install ceiling


ceiling joists/frames
joists/frames

You might also like