Work at a Glance
Nos of
District Sanctioned Sanctioned Nos of Nos of in
Approved
Name Year Ammount (Cr.) Completed Progress Work
Works
tioned Length Now to be Started
pleted Length Cost of Now to be Started (Cr.)
Now to be
Started Works
1 1 State
Sr. No. State Name State/UT State Type
1 Andhra Pradesh AndhraPradesh Regular
2 2 Phase
Sr. No. Phase Number State/UT State Type
1 Phase-I AndhraPradesh Regular
2 Phase-II AndhraPradesh Regular
3 3 Project Type
4 4 Package / Division
Sr. No. Package R&B Circle District
5 5 Assembley Constituency
Sr. No. Assembley Constituency R&B Circle District
1
2
6 6 Agency/Contractor
Sr. No. Package Agency/ Contractor PAN
7 7 Target Work
Sr. No. Package Financial Year Targat Length
9 9 Road Detailes
Sr. No. Road Number Package Name of Work
10 10
Census Code Action
ST-AP Add/Delete
Action
Add/Delete
Add/Delete
NDB Senctioned
NDB Sanctioned No of Bridges
Ammount State Name Action
Length (in Km) Reconstructing
(INR in Cr.)
Yes/No
Yes/No
Material / Activity
PIN Code Moble Phone Fax Email
Earthwork Agreegate Ciment
Action
Add/Delete
Action
Add/Delete
Add/Delete
l / Activity
Remark Included in R&B Action
Grid Matel
Yes/No Add/Delete
10 1 DPR Status Connecting Mandals
Assembley Road
Sr. No. Package Length From Length To
Constituency Number
11 2 Encumbrance Detailes
Assembley Road
Sr. No. Package Length From Length To
Constituency Number
12 3 Forest Clearance
14 5 Land Acqusition
15 6 Utility Relocation
Date of Requisition
Placed with Land
Total Length Area of Acquisiton Date Of Draft
Acquisition officer
Affacted (in Km) (Acres) Notification
(LRDC/JC) along with
Land Plan Schedules
Add/Delete
Add/Delete
Date of Submission of
Draft Detailed Project
Report
Add/Delete
Add/Delete
Date of Receipt of
Valuation Ammount Permission for Tree Action
Felling
Add/Delete
Sanctioned Estimates
From the Utility TS amount in Cr. Action
Owning Dept.
Add/Delete
Add/Delete
Action
Add/Delete
Add/Delete
Type of Bridge
Sub Structure
Sub Structure
Sub Structure
Sub Structure
Sub Structure
Sub Structure
17 1 Road Detailes
Assembley
Sr. No. Package Road Number
Constituency
Assembley
Sr. No. Package Road Number
Constituency
1
2
19 3 Road Reconstruction
Assembley
Sr. No. Package Road Number
Constituency
20 4 Road Realignment
Assembley
Sr. No. Package Road Number
Constituency
Assembley
Sr. No. Package Road Number Constituency
24 7 Major Bridge
Assembley
Sr. No. Package Road Number
Constituency
25 8 Minor Bridge
Assembley
Sr. No. Package Road Number
Constituency
26 9 Box Culverts
Assembley
Sr. No. Package Road Number
Constituency
27 10 Pipe Culverts
Assembley
Sr. No. Package Road Number
Constituency
28 11 Slab Culverts
2 1
Type of Work
Reconstruction/ Outer Width of
Minor Bridge No Chanage Location Rehabilitation/ Foundation (Nos)
Structure (In Km)
Repair / Widening
Scheme
Type of Work
Reconstruction/
Outer Width of
Box Culvert No Chanage Location Rehabilitation/ Foundation (Nos)
Structure (In Km)
Repair / Widening
Scheme
Type of Work
Reconstruction/
Outer Width of
Pipe Culvert No Chanage Location Rehabilitation/ Foundation (Nos)
Structure (In Km)
Repair / Widening
Scheme
Type of Work
Reconstruction/
Slab Culvert No Chanage Location Rehabilitation/ Outer Width of Foundation (Nos)
Structure (In Km)
Repair / Widening
Scheme
TYPICAL CROSS SECTION SCHEDULE (In Nos.)
Number of Major Minor Bridge
Realignment Flexible Pavement Rigid Pavement Bridge (In Nos.)
Sub Structure (Nos) Super Structure Length Completed Till Date Targaed Comp. Work Status
(Nos) (Km) Date
Targated
Box Culverts Pipe Culverts Slab Culverts
Work Status Completion Action
(In Nos.) (In Nos.) (In Nos.)
Date
Rea. Is not possibel
Add/Delete
due to YSX
m)
OVERLAY / STRENTHENING WIDENING / N
BC DBM
BC DBM WMM
LHS RHS LHS
m)
OVERLAY / STRENTHENING WIDENING / N
BC DBM
BC DBM WMM
LHS RHS LHS
m)
OVERLAY / STRENTHENING WIDENING / N
BC DBM
BC DBM WMM
LHS RHS LHS
m)
OVERLAY / STRENTHENING WIDENING / N
BC DBM
BC DBM WMM
LHS RHS LHS
m)
OVERLAY / STRENTHENING WIDENING / N
BC DBM
BC DBM WMM
LHS RHS LHS
Action
Add/Delete
Action
Add/Delete
Action
Add/Delete
Action
Add/Delete
Action
Add/Delete
COMPLETED FLEXIBLE PAVEMENT TILL DATE (In Km)
WIDENING / NEW CONSTRUCTION
DBM WMM GSB Subgrade
RHS LHS RHS LHS RHS LHS
TE (In Km)
OVERLAY / STRENTHENING
Subgrade BC DBM WMM
RHS LHS RHS LHS RHS LHS RHS
TE (In Km)
OVERLAY / STRENTHENING
Subgrade BC DBM WMM
RHS LHS RHS LHS RHS LHS RHS
TE (In Km)
OVERLAY / STRENTHENING
Subgrade BC DBM WMM
RHS LHS RHS LHS RHS LHS RHS
TE (In Km)
OVERLAY / STRENTHENING
Subgrade BC DBM WMM
RHS LHS RHS LHS RHS LHS RHS
Total Length Targated
Completed Till Date Completion Work Status Action
(in Km) Date
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
For Rigid
Type of Bridge
Sub Structure
<60 mtrs From / To
29 1 Approved Work for Road
Assembley
Sr. No. Action Package Road Number
Constituency
Edit/Delete
30 2 Technical Sanction
Assembley
Sr. No. Action Package Financial Year
Constituency
Edit/Delete
31 3 Tendre
Assembley
Sr. No. Action Package Name of Work
Constituency
Edit/Delete
Assembley
Sr. No. Action Package Work Name
Constituency
Edit/Delete
Assembley
Sr. No. Action Package Work Name
Constituency
Edit/Delete
33 6 Bill Detailes
Assembley
Sr. No. Action Package Work Name
Constituency
Edit/Delete
34 7 Payment Details
Assembley
Sr. No. Action Package Bill No.
Constituency
Edit/Delete
35 8 R&BQCWing - IQM Report (R&B Quality Control Wing Monitoring / Independent Quality Monitoring)
Sr. No. Package Assembley Work Name Date
Constituency
Assembley
Gallery Sr. No. Package Year of Approval
Constituency
Assembley
Gallery Sr. No. Package Year of Approval
Constituency
Year of AS Amount (INR Length of Road in
Adm. San. Date Work Name
Approval in Cr.) Km.
Edit/Delete
Administrative
Administrative Length in Km for
Section Amount Name of Work Existing Surface
Senction Date Roads
(INR in Cr)
Administrative
Administrative Length of new
Section Amount Name of Work Existing Structure Structure in Meter
Senction Date
(INR in Cr)
No of Structures Remark
Revised
Subgrade (%) Work Status Completion Date Maintenane Remarks
Completion Date
Revised Maintenane
Completion Date Remarks
Completion Date
Remark
CD Work
Date of Stipulated date of
Actual date of Civil Stipulated date Actual date Diffact
Commencement of Civil Work
Work Completion Diffact Laibility Period Laibility Period
Work Completion
Date of
Tender Approval Contract Period in Schedule Date for Actual Date of
Commencement of
Date Months Completion of Work Completion
Work
Date of
Tender Approval Contract Period in Schedule Date for Actual Date of
Commencement of
Date Months Completion of Work Completion
Work
Stipulated Actual
Maintenance Maintenance Remarks
Completion Date Completion Date
Schedule Date for Expenditure Total Expenditure Expenditure Incurred Total Expenditure
Completion of Incurred in the incurred till last in the current month incurred up to this
Maintenance Previous FY year month current FY month in current FY
Details of Length
Total Expenditure Physical Status of substantially completed
up to till date work as on Date up to BC level (Road R&BQCWing Agency Name
wise)
No. of
No of SRI Reports No. of Satisfactory Unsatisfactory No. of ATR
No. of ATR Pending
For R&BQCWing Report For R&BQCWing Report For Approved
R&BQCWing
No. of
No of SRI Reports No. of Satisfactory Unsatisfactory No. of ATR
No. of ATR Pending
For R&BQCWing Report For R&BQCWing Report For Approved
R&BQCWing
No of
No of SRI No. of
Satisfactory Remarks
IQM Agency Name IQM Visit Reports for Unsatisfactory
Reports For Attachments
IQM Reports For IQM
IQM
No of
No of SRI No. of
Satisfactory Remarks
IQM Agency Name IQM Visit Reports for Unsatisfactory
Reports For Attachments
IQM Reports For IQM
IQM
40 3 Works of Approval Road
Statement - Works Approved Report for
Username:
Sr. No. Phase Number Project Name Package Number
1
2
Total
1
2
Total
1
2
Total
1
2
Total
1
2
Total (Vijayawada Circle)
3
4
Total (Krishna Circle)
Total
Total
1
2
Total (Vijayawada Circle)
3
4
Total (Krishna Circle)
Total
1
2
Total (Vijayawada Circle)
3
4
Total (Krishna Circle)
Total
1
2
Total
53 16 Status of Works
Statement 16 - Status of Works
Username:
Nos. of Works for which
Sr. No. Circle Division completion date is over
and works Completed
Shree Shakti
3 Krishna Road-3 Construction,
Ahmedabad
Approval Year:
Major Bridge Mino
R&B Circle
Nos. Length in Km Cost in Lacks Nos.
Approval Year:
Approval Year:
Technical Sanction
Total Approved Works
R&B Circle (Nos. o
Nos. Length in Km Cost in Lacks Nos.
of Road Work Progress
Approval Year:
Achievement Length
R&B Circle Sanctioned Length Widening &
Reconstruction Realignment
Strengthening
Approval Year:
Achievement Length
R&B Circle Sanctioned Length
Major Bridge Minor Bridge Box Culverts
Approval Year:
Nos. of Works for
Nos. of Works for which
which completion
completion date is over
date is over but
but works in Progress
works not started
3 0
Progress Chart
Achievement Length
Pipe Culverts Slab Culverts Total
Approved Year:
For the current year
Total Total
Total
Expenditure up Expenditure up
Expenditure incurred Expenditure incurred Expenditure up to till date (Rs in to till date (in
till last month in the current month to this month Cr.) Mn $)
Work Completed
Length in Km
Flexible Pavement Rigid Pavement
Nos. Length in Km Cost in Lacks Nos. Length in Km Cost in Lacks
Work in Progress
Work Order
Works Started
issued (Nos. of Works)
(Nos. Nos.
of Works) Length in Km Cost in Lacks Nos. Length in Km Cost in Lacks
Total Approved Works
Nos. Length in Km Cost in Lacks
Work Completed
Nos. Length in Km Cost in Lacks
57 1 List of Equipment
Assembley
Sr. No. Package Type of equipment
Constituency
Hydraulic Excavator
Motor Grader
Dozer
Tippers
WMM Plant
Hydro Static Paver
Smooth Wheel Road Roller
Vibrator Roller
Pneeumatic Road Roller
Water Tankers
Batch type Hot mix Plant
Loader
Paver Finisher Mechanical
Bitumen Pressure Distributor
Concreet Batching Plant
Project In-charge
Highway Engineer
Bridge Engineer
Material Engineer
Environment and Safety Manager
Quality Surveyor
Lab Management / Technician
Site Supervisor
Maintenance Engineer
Minimum
Equipment
Required as Deficiency if any Remark Action
per contract Available at site
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
Minimum
Required as Available at Site Deficiency if any Remark Action
per contract
Add/Delete
Add/Delete
Add/Delete
Add/Delete
ty Manager Add/Delete
Add/Delete
Add/Delete
Add/Delete
Add/Delete
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
1 Abbrevation
3 Alerts
Search Alerts Title | | Date | | - Search
+ Add Alerts
Title Massage Date
4 Related Links
Edit/Delete
1 User
Login Name:
+ Add User
Login Name First Name Middle Name Last Name
2 Role
Role Name:
+ Add Role
Role Name Role Description Action
Administrator Administrator Edit/Delete
Cicle Circle Level Role Edit/Delete
Do Division Office Role Edit/Delete
R&B R&B Role Edit/Delete
PMC PMC User Edit/Delete
+ Add Funct.
Update Functionality
Role Name: -Search Role-
UPDATE CANCEL
7 R&B Notification
List of inactive users
List of users with inactive activity
Search User
First Name: SEARCH
Search Role
SEARCH
Search Functinality
SEARCH
Functionality List
Role Name Action
Administrator Edit Fun./Delete
PMC Edit Fun./Delete
Do Edit Fun./Delete
Circle Edit Fun./Delete
R&B Edit Fun./Delete
SEARCH
Minor Bridge
6-60 meters
Box Culvets
>6 meters
Pipe Culvets
Slab culvat