Ref: MDCG/MF/01/---- 12 July 2021

Mr. Chen Yongjian


Authorized Representative
CGGC-DESCON JV
Khaista Communications and TCS Office,
Garangi Road Miraj Khan Market Near Liaqat Super Store,
Shabqadar, Charsadda, Khyber Pakhtunkhwa.

MOHMAND DAM HYDROPOWER PROJECT


REQUEST TO PROVIDE IFC DRAWINGS FOR CONCRETE STRUCTURE LINING OF
DIVERSION TUNNEL
1. CDJV-MDHP-MDCG-2021-2673 dated: 11 Apr, 2021
2. MDCG/MF/01/4727 dated: 22 Jun, 2021

Dear Mr. Chen,


With reference to your letter at ref. 1 above, please see our letter at ref. 2 for detailed
response.

Yours sincerely,

Mark Fox
Project Manager / Construction Manager
Mohmand Dam Consultants Group (MDCG)
TUR

Copy to: 1. General Manager / PD (MDHP), WAPDA


2. Mirza Asif Baig, Dr Shahzad Rehman, Zafar Ahmed, Zafer Demirselcuk,
Tahir ur Rehman, Rao Awais Khan

Page 1 of 1