You are on page 1of 7

Cetpro

HVAC Load Analysis


for

Prepared By:

domingo, 18 de abril de 2021


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Cetpro
College Station, TX 77845 Page 2
Project Information
Project Title: Cetpro
Designed By:
Date: jueves, 1 de Agosto de 2019
Comment:

Client Name: Company Name:


Address: Representative:
City: Address:
Phone: City:
Fax: Phone:
Comment: Fax:
Comment:

D:\Proyectos\Milton ERP\Edificio\Edificio.CHV domingo, 18 de abril de 2021, 7:50 a.m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Cetpro
College Station, TX 77845 Page 3

General Project Data Input


General Project Information
Project file name: D:\Proyectos\Milton ERP\Edificio\Edificio.CHV
Project title: Cetpro
Project date: jueves, 1 de Agosto de 2019
Project location: MOYOBAMBA, LA LIBERTAD, PERU
Barometric pressure: 907.142 mbar
Altitude: 900 meters
Latitude: -6 Degrees
Mean daily temperature range: 18 Degrees
Starting & ending time for HVAC load calculations: 1am - 12am
Number of unique zones in this project: 1

Building Default Values


Calculations performed: Cooling loads only
Lighting requirements: 10.00 Watts per square meter
Equipment requirements: 20.00 Watts per square meter
People sensible load multiplier: 80 Watts per person
People latent load multiplier: 80 Watts per person
Zone sensible safety factor: 10 %
Zone latent safety factor: 10 %
Zone heating safety factor: 10 %
People diversity factor: 100 %
Lighting profile number: 1
Equipment profile number: 1
People profile number: 1
Building default ceiling height: 3.6 meters
Building default wall height: 3.6 meters

Internal Operating Load Profiles (C = 100)


hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 0 0 0 0 0 0 C C C C C C C C C C C C C 0 0 0 0 0
2 C C C C C C C C C C C C C C C C C C C C C C C C
3 C C C C C C C C C C C C C C C C C C C C C C C C
4 C C C C C C C C C C C C C C C C C C C C C C C C
5 C C C C C C C C C C C C C C C C C C C C C C C C
6 C C C C C C C C C C C C C C C C C C C C C C C C
7 C C C C C C C C C C C C C C C C C C C C C C C C
8 C C C C C C C C C C C C C C C C C C C C C C C C
9 C C C C C C C C C C C C C C C C C C C C C C C C
10 C C C C C C C C C C C C C C C C C C C C C C C C

D:\Proyectos\Milton ERP\Edificio\Edificio.CHV domingo, 18 de abril de 2021, 7:50 a.m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Cetpro
College Station, TX 77845 Page 4

General Project Data Input (cont'd)


Building-Level Design Conditions
Design Outdoor Outdoor Indoor Indoor Grams In/Outdoor
Month Dry Bulb Wet Bulb Rel.Hum Dry Bulb Diff Correction
August 32 29 50% 22 17.98 -3
Winter 20 20

Master Roofs
Roof ASHRAE Roof Dark Susp.
No. Roof# U-Fac Color Ceil
1 9 1.306 No Sí

Master Walls
Wall ASHRAE Wall Wall
No. Group U-Fac Color
1 B 2.027 M

Master Partitions
Partition Partition Cool Heat
No. U-Factor T-D T-D
1 2.027 5 0
2 1.200 5 0

Master Glass
Glass Summer Winter Glass Interior Interior
No. U-Factor U-Factor Shd.Coef. Shading Shd.Coef
1 5.700 5.800 0.950 1 0.700

D:\Proyectos\Milton ERP\Edificio\Edificio.CHV domingo, 18 de abril de 2021, 7:50 a.m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Cetpro
College Station, TX 77845 Page 5

Building Summary Loads


Building peaks in August at 1pm.
Bldg Load Area Sen %Tot Lat Sen Net %Net
Descriptions Quan Loss Loss Gain Gain Gain Gain
Roof 76 0 0.00 0 505 505 1.74
Wall 18 0 0.00 0 280 280 0.96
Glass 22 0 0.00 0 3,104 3,104 10.67
Floor Slab 0 0 0.00 0 0 0 0.00
Skin Loads 0 0.00 0 3,888 3,888 13.37
Lighting 762 0 0.00 0 838 838 2.88
Equipment 7,500 0 0.00 0 8,250 8,250 28.37
People 25 0 0.00 2,200 2,200 4,400 15.13
Partition 217 0 0.00 0 2,424 2,424 8.34
Cool. Pret. 0 0 0.00 0 0 0 0.00
Heat. Pret. 0 0 0.00 0 0 0 0.00
Cool. Vent. 152 0 0.00 7,705 1,346 9,050 31.13
Heat. Vent. 0 0 0.00 0 0 0 0.00
Cool. Infil. 0 0 0.00 0 0 0 0.00
Heat. Infil. 0 0 0.00 0 0 0 0.00
Draw-Thru Fan 0 0 0.00 0 0 0 0.00
Blow-Thru Fan 0 0 0.00 0 225 225 0.77
Reserve Cap. 0 0 0.00 0 0 0 0.00
Reheat Cap. 0 0 0.00 0 0 0 0.00
Supply Duct 0 0 0.00 0 0 0 0.00
Return Duct 0 0 0.00 0 0 0 0.00
Misc. Supply 0 0 0.00 0 0 0 0.00
Misc. Return 0 0 0.00 0 0 0 0.00
Building Totals 0 0.00 9,905 19,170 29,075 100.00

Building Sen %Tot Lat Sen Net %Net


Summary Loss Loss Gain Gain Gain Gain
Ventilation 0 0.00 7,705 1,346 9,050 31.13
Infiltration 0 0.00 0 0 0 0.00
Pretreated Air 0 0.00 0 0 0 0.00
Zone Loads 0 0.00 2,200 17,600 19,800 68.10
Plenum Loads 0 0.00 0 0 0 0.00
Fan & Duct Loads 0 0.00 0 225 225 0.77
Building Totals 0 0.00 9,905 19,170 29,075 100.00

Check Figures
Total Building Supply Air (based on a 10° TD): 2,009 L/s
Total Building Vent. Air (7.58% of Supply): 152 L/s
Total Conditioned Air Space: 76 Sq.m
Supply Air Per Unit Area: 26.3741 L/s/Sq.m
Area Per Cooling Capacity: 2.6194 Sq.m/kW 9.2121 Sq.m/Ton
Cooling Capacity Per Area: 0.3818 kW/Sq.m 0.1086 Tons/Sq.m
Total Heating Required With Outside Air: 0.00 kW
Total Cooling With Outside Air: 29.08 kW 8.27 Tons

D:\Proyectos\Milton ERP\Edificio\Edificio.CHV domingo, 18 de abril de 2021, 7:50 a.m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Cetpro
College Station, TX 77845 Page 6

Air Handler #1 - Vrv-101 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.L/s Clg.L/s S.Exh Req.L/s Req.L/s
Volume L/s/Sqm L/s/Sqm W.Exh Act.L/s Act.L/s
101 Sala De
76 0 22,182 2,200 2/Hr 2/Hr
1 Reuniones 1
25 0 2,009 0 0 152
8am August
274 0.00 26.37 0 0 152

Zone Peak Totals: 76 0 22,182 2,200


Total Zones: 1 25 0 2,009 0 0 152
Unique Zones: 1 274 0.00 26.37 0 0 152

D:\Proyectos\Milton ERP\Edificio\Edificio.CHV domingo, 18 de abril de 2021, 7:50 a.m.


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Cetpro
College Station, TX 77845 Page 7

Air Handler #1 - Vrv-101 - Total Load Summary


Air Handler Description: Vrv-101 Constant Volume - Sum of Peaks
Supply Air Fan: Blow-Thru with program estimated horsepower of 0.25 kW
Fan Input: 80% motor and fan efficiency with 0.1 kPa across the fan
Sensible Heat Ratio: 0.91 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 1pm in August.
Outdoor Conditions: 30° DB, 29° WB, 28.01 grains
Because of the diversity in zone, plenum and ventilation loads, the zone sensible peak time in August at 8am is different
from the total system peak time, hence the air system L/s was computed using a zone sensible load of 22,182.
Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.
Zone Space sensible loss: 0 Watts
Infiltration sensible loss: 0 Watts 0 L/s
Outside Air sensible loss: 0 Watts 0 L/s
Supply Duct sensible loss: 0 Watts
Return Duct sensible loss: 0 Watts
Return Plenum sensible loss: 0 Watts
Total System sensible loss: 0 Watts
Heating Supply Air: 0 / (.898 X 1.21 X 0) = 0 L/s
Winter Vent Outside Air (0.0% of supply) = 0 L/s
Zone space sensible gain: 17,600 Watts
Infiltration sensible gain: 0 Watts
Draw-thru fan sensible gain: 0 Watts
Supply duct sensible gain: 0 Watts
Reserve sensible gain: 0 Watts
Total sensible gain on supply side of coil: 17,600 Watts
Cooling Supply Air: 22,182 / (.898 X 1.23 X 10) = 2,009 L/s
Summer Vent Outside Air (7.6% of supply) = 152 L/s
Return duct sensible gain: 0 Watts
Return plenum sensible gain: 0 Watts
Outside air sensible gain: 1,346 Watts 152 L/s
Blow-thru fan sensible gain: 225 Watts
Total sensible gain on return side of coil: 1,570 Watts
Total sensible gain on air handling system: 19,170 Watts
Zone space latent gain: 2,200 Watts
Infiltration latent gain: 0 Watts
Outside air latent gain: 7,705 Watts
Total latent gain on air handling system: 9,905 Watts
Total system sensible and latent gain: 29,075 Watts

Check Figures
Total Air Handler Supply Air (based on a 10° TD): 2,009 L/s
Total Air Handler Vent. Air (7.58% of Supply): 152 L/s
Total Conditioned Air Space: 76 Sq.m
Supply Air Per Unit Area: 26.3741 L/s/Sq.m
Area Per Cooling Capacity: 2.6194 Sq.m/kW 9.2121 Sq.m/Ton
Cooling Capacity Per Area: 0.3818 kW/Sq.m 0.1086 Tons/Sq.m
Total Heating Required With Outside Air: 0.00 kW
Total Cooling With Outside Air: 29.08 kW 8.27 Tons

D:\Proyectos\Milton ERP\Edificio\Edificio.CHV domingo, 18 de abril de 2021, 7:50 a.m.

You might also like