Calculo De Carga Termica - PNP

HVAC Load Analysis


for

Lima

Prepared By:

Ing. Marlon Bobadilla


Mbm Proyectos Y Tecnologia Sac

jueves, 05 de marzo de 2020


Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Calculo De Carga Termica - PNP
College Station, TX 77845 Page 2

General Project Data Input


General Project Information
Project file name: D:\MBM Proyecto y Tecnologia SAC\Proyectos\Sistema
Privado\2020\12. PROYECTAR 3D - CALCULO DE CARGA
TERMICA PLANOS\Calculo de carga termica.CHV
Project title: Calculo De Carga Termica - PNP
Designed by: Marlon Bobadilla
Project date: lunes, 05 de Marzo de 2020
Project location: LIMA, PERU
Client city: Lima
Company name: Mbm Proyectos Y Tecnologia Sac
Company representative: Ing. Marlon Bobadilla
Barometric pressure: 29.876 in.Hg.
Altitude: 42 feet
Latitude: -12 Degrees
Mean daily temperature range: 11.5 Degrees
Starting & ending time for HVAC load calculations: 7am - 7pm
Number of unique zones in this project: 1

Building Default Values


Calculations performed: Cooling loads only
Lighting requirements: 2.00 Watts per square foot
Equipment requirements: 2.00 Watts per square foot
People sensible load multiplier: 275 Btuh per person
People latent load multiplier: 275 Btuh per person
Zone sensible safety factor: 15 %
Zone latent safety factor: 15 %
Zone heating safety factor: 15 %
People diversity factor: 100 %
Lighting profile number: 1
Equipment profile number: 1
People profile number: 1
Building default ceiling height: 12.0 feet
Building default wall height: 12.0 feet

Internal Operating Load Profiles (C = 100)


hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr hr
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
1 0 0 0 0 0 0 C C C C C C C C C C C C C 0 0 0 0 0
2 C C C C C C C C C C C C C C C C C C C C C C C C
3 C C C C C C C C C C C C C C C C C C C C C C C C
4 C C C C C C C C C C C C C C C C C C C C C C C C
5 C C C C C C C C C C C C C C C C C C C C C C C C
6 C C C C C C C C C C C C C C C C C C C C C C C C
7 C C C C C C C C C C C C C C C C C C C C C C C C
8 C C C C C C C C C C C C C C C C C C C C C C C C
9 C C C C C C C C C C C C C C C C C C C C C C C C
10 C C C C C C C C C C C C C C C C C C C C C C C C

D:\MBM Proyecto y Tecnologia SAC\Proyectos\Sistema Privado\2020\12. PROYECTAR 3D - CALCULO


jueves, 05DE
deCARGA
marzo de
TERMICA
2020, 1:23 a.m.
PLANOS\Calculo de carga termica.CHV
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Calculo De Carga Termica - PNP
College Station, TX 77845 Page 3

General Project Data Input (cont'd)


Building-Level Design Conditions
Design Outdoor Outdoor Indoor Indoor Grains In/Outdoor
Month Dry Bulb Wet Bulb Rel.Hum Dry Bulb Diff Correction
January 86 76 55% 72 54.84 2
February 87 76 55% 72 55.22 3
March 88 76 55% 72 52.39 3
April 85 75 55% 72 50.96 0
May 82 72 55% 72 40.30 -2
June 80 71 55% 72 36.72 -4
July 77 68 55% 72 22.80 -7
August 75 67 55% 72 21.93 -9
September 75 67 55% 72 22.09 -9
October 74 66 55% 72 17.34 -11
November 78 69 55% 72 26.91 -7
December 83 73 55% 72 41.55 -2
Winter 58 75

Master Roofs
Roof ASHRAE Roof Dark Susp.
No. Roof# U-Fac Color Ceil
1 1 0.213 No No

Master Walls
Wall ASHRAE Wall Wall
No. Group U-Fac Color
1 G 0.091 M

D:\MBM Proyecto y Tecnologia SAC\Proyectos\Sistema Privado\2020\12. PROYECTAR 3D - CALCULO


jueves, 05DE
deCARGA
marzo de
TERMICA
2020, 1:23 a.m.
PLANOS\Calculo de carga termica.CHV
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Calculo De Carga Termica - PNP
College Station, TX 77845 Page 4

Building Summary Loads


Building peaks in March at 2pm.
Bldg Load Area Sen %Tot Lat Sen Net %Net
Descriptions Quan Loss Loss Gain Gain Gain Gain
Roof 3,139 0 0.00 0 32,601 32,601 17.06
Wall 5,336 0 0.00 0 17,465 17,465 9.14
Glass 0 0 0.00 0 0 0 0.00
Floor Slab 0 0 0.00 0 0 0 0.00
Skin Loads 0 0.00 0 50,067 50,067 26.20
Lighting 6,278 0 0.00 0 24,635 24,635 12.89
Equipment 6,278 0 0.00 0 24,635 24,635 12.89
People 53 0 0.00 16,761 16,761 33,523 17.54
Partition 0 0 0.00 0 0 0 0.00
Cool. Pret. 0 0 0.00 0 0 0 0.00
Heat. Pret. 0 0 0.00 0 0 0 0.00
Cool. Vent. 1,060 0 0.00 38,567 18,628 57,195 29.93
Heat. Vent. 0 0 0.00 0 0 0 0.00
Cool. Infil. 0 0 0.00 0 0 0 0.00
Heat. Infil. 0 0 0.00 0 0 0 0.00
Draw-Thru Fan 0 0 0.00 0 0 0 0.00
Blow-Thru Fan 0 0 0.00 0 1,073 1,073 0.56
Reserve Cap. 0 0 0.00 0 0 0 0.00
Reheat Cap. 0 0 0.00 0 0 0 0.00
Supply Duct 0 0 0.00 0 0 0 0.00
Return Duct 0 0 0.00 0 0 0 0.00
Misc. Supply 0 0 0.00 0 0 0 0.00
Misc. Return 0 0 0.00 0 0 0 0.00
Building Totals 0 0.00 55,328 135,798 191,126 100.00

Building Sen %Tot Lat Sen Net %Net


Summary Loss Loss Gain Gain Gain Gain
Ventilation 0 0.00 38,567 18,628 57,195 29.93
Infiltration 0 0.00 0 0 0 0.00
Pretreated Air 0 0.00 0 0 0 0.00
Zone Loads 0 0.00 16,761 116,097 132,859 69.51
Plenum Loads 0 0.00 0 0 0 0.00
Fan & Duct Loads 0 0.00 0 1,073 1,073 0.56
Building Totals 0 0.00 55,328 135,798 191,126 100.00

Check Figures
Total Building Supply Air (based on a 17° TD): 6,277 CFM
Total Building Vent. Air (16.89% of Supply): 1,060 CFM
Total Conditioned Air Space: 3,139 Sq.ft
Supply Air Per Unit Area: 1.9996 CFM/Sq.ft
Area Per Cooling Capacity: 197.0850 Sq.ft/Ton
Cooling Capacity Per Area: 0.0051 Tons/Sq.ft
Total Heating Required With Outside Air: 0 Btuh
Total Cooling Required With Outside Air: 15.93 Tons

D:\MBM Proyecto y Tecnologia SAC\Proyectos\Sistema Privado\2020\12. PROYECTAR 3D - CALCULO


jueves, 05DE
deCARGA
marzo de
TERMICA
2020, 1:23 a.m.
PLANOS\Calculo de carga termica.CHV
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Calculo De Carga Termica - PNP
College Station, TX 77845 Page 5

Air Handler #1 - Equipo 1 - Summary Loads


Zn Description Area Htg.Loss Sen.Gain Lat.Gain Htg.O.A. Clg.O.A.
No Peak Time People Htg.CFM Clg.CFM S.Exh Req.CFM Req.CFM
Volume CFM/Sqft CFM/Sqft W.Exh Act.CFM Act.CFM
1 Auditorio 3,139 0 117,198 16,761 20/P 20/P
3pm March 53 0 6,277 0 0 1,060
72,197 0.00 2.00 0 0 1,060
Zone Peak Totals: 3,139 0 117,198 16,761
Total Zones: 1 53 0 6,277 0 0 1,060
Unique Zones: 1 72,197 0.00 2.00 0 0 1,060

D:\MBM Proyecto y Tecnologia SAC\Proyectos\Sistema Privado\2020\12. PROYECTAR 3D - CALCULO


jueves, 05DE
deCARGA
marzo de
TERMICA
2020, 1:23 a.m.
PLANOS\Calculo de carga termica.CHV
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Calculo De Carga Termica - PNP
College Station, TX 77845 Page 6

Air Handler #1 - Equipo 1 - Total Load Summary


Air Handler Description: Equipo 1 Variable Air Volume
Supply Air Fan: Blow-Thru with program estimated horsepower of 0.42 HP
Fan Input: 70% motor and fan efficiency with 0 in. water across the fan
Sensible Heat Ratio: 0.87 --- This system occurs 1 time(s) in the building. ---
Air System Peak Time: 2pm in March.
Outdoor Conditions: 87° DB, 76° WB, 116.46 grains
Because of the diversity in zone, plenum and ventilation loads, the zone sensible peak time in March at 3pm is different
from the total system peak time, hence the air system CFM was computed using a zone sensible load of 117,198.
Summer: Ventilation controls outside air, ----- Winter: Exhaust controls outside air.
Zone Space sensible loss: 0 Btuh
Infiltration sensible loss: 0 Btuh 0 CFM
Outside Air sensible loss: 0 Btuh 0 CFM
Supply Duct sensible loss: 0 Btuh
Return Duct sensible loss: 0 Btuh
Return Plenum sensible loss: 0 Btuh
Total System sensible loss: 0 Btuh
Heating Supply Air: 0 / (.998 X 1.08 X 0) = 0 CFM
Winter Vent Outside Air (0.0% of supply) = 0 CFM
Zone space sensible gain: 116,097 Btuh
Infiltration sensible gain: 0 Btuh
Draw-thru fan sensible gain: 0 Btuh
Supply duct sensible gain: 0 Btuh
Reserve sensible gain: 0 Btuh
Total sensible gain on supply side of coil: 116,097 Btuh
Cooling Supply Air: 117,198 / (.998 X 1.1 X 17) = 6,277 CFM
Summer Vent Outside Air (16.9% of supply) = 1,060 CFM
Return duct sensible gain: 0 Btuh
Return plenum sensible gain: 0 Btuh
Outside air sensible gain: 18,628 Btuh 1,060 CFM
Blow-thru fan sensible gain: 1,073 Btuh
Total sensible gain on return side of coil: 19,700 Btuh
Total sensible gain on air handling system: 135,798 Btuh
Zone space latent gain: 16,761 Btuh
Infiltration latent gain: 0 Btuh
Outside air latent gain: 38,567 Btuh
Total latent gain on air handling system: 55,328 Btuh
Total system sensible and latent gain: 191,126 Btuh

Check Figures
Total Air Handler Supply Air (based on a 17° TD): 6,277 CFM
Total Air Handler Vent. Air (16.89% of Supply): 1,060 CFM
Total Conditioned Air Space: 3,139 Sq.ft
Supply Air Per Unit Area: 1.9996 CFM/Sq.ft
Area Per Cooling Capacity: 197.0850 Sq.ft/Ton
Cooling Capacity Per Area: 0.0051 Tons/Sq.ft
Total Heating Required With Outside Air: 0 Btuh
Total Cooling Required With Outside Air: 15.93 Tons

D:\MBM Proyecto y Tecnologia SAC\Proyectos\Sistema Privado\2020\12. PROYECTAR 3D - CALCULO


jueves, 05DE
deCARGA
marzo de
TERMICA
2020, 1:23 a.m.
PLANOS\Calculo de carga termica.CHV
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Calculo De Carga Termica - PNP
College Station, TX 77845 Page 7

Zone Detailed Loads (At Zone Peak Times)


Load Unit -SC- CLTD U.Fac Sen. Lat. Htg. Htg.
Description Quan CFAC SHGF -CLF- Gain Gain Mult. Loss
Zone 1-Auditorio peaks (sensible) in March at 3pm, Air Handler 1 (Equipo 1), Group 0, 43.0 x 73.0,
Construction Type: 1 (Light)
Roof-1-1-No.Clg-L 3,139 0.50 41.4 0.213 27,680 3.621 11,366
Wall-1-N-G-M 989 0.83 37.2 0.091 3,346 1.547 1,530
Wall-2-W-G-M 1,679 0.83 48.8 0.091 7,456 1.547 2,597
Wall-3-S-G-M 989 0.83 20.6 0.091 1,852 1.547 1,530
Wall-4-E-G-M 1,679 0.83 27.2 0.091 4,159 1.547 2,597
Lights-Prof=1 6,278 1.000 21,421
Equipment-Prof=1 6,278 1.000 21,421 0
People-Prof=1 53.0 1.000 14,575 14,575
Sub-total 101,912 14,575 0
Safety factors: +15% +15% +15%
--------- --------- ---------
Total w/ safety factors: 117,198 16,761 0

D:\MBM Proyecto y Tecnologia SAC\Proyectos\Sistema Privado\2020\12. PROYECTAR 3D - CALCULO


jueves, 05DE
deCARGA
marzo de
TERMICA
2020, 1:23 a.m.
PLANOS\Calculo de carga termica.CHV
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
Elite Software Development Calculo De Carga Termica - PNP
College Station, TX 77845 Page 8

Air System #1 (Equipo 1) Psychrometric Analysis


System Load Analysis Latent Grains Sensible Temp CFM
Leaving Coil Condition 60.445 55.000
Draw-Thru Fan 0 0.000 0
Misc Load on Supply Side 0 0.000 0
Supply Air Duct 0 0.000 0
Zone Loads 16,761 3.933 117,198 17.000 6,277
Sensible Reserve 0 0.000 0
Zone Condition 16,761 64.378 117,198 71.600 6,277
Return Air Duct 0 0.000
Return Air Plenum 0 0.000
Misc Load on Return Side 0 0.000
Vent Air 1,060 CFM 38,567 8.773 18,628 2.702
Blow-Thru Fan 1,073 0.156
Entering Coil Condition 55,328 73.151 136,899 74.858 6,277

General Psychrometric Equations Used In Analysis:


PR = (Barometric pressure of site / Standard ASHRAE pressure of 29.921)
TSH = PR x 1.10 x CFM x (DB entering - DB leaving)
TLH = PR x 0.68 x CFM x (Grains entering - Grains leaving)
GTH = PR x 4.50 x CFM x (Enthalpy entering - Enthalpy leaving)

TSH = 0.998 x 1.10 x 6,277 x( 74.858 - 55.000 )= 136,899 Btuh


TLH = 0.998 x 0.68 x 6,277 x( 73.151 - 60.445 )= 54,150 Btuh
----------
SUM = 191,049 Btuh
GTH = 0.998 x 4.50 x 6,277 x( 29.403 - 22.574 )= 192,583 Btuh
Total System Load = 191,126 Btuh

Chilled and Hot Water Flow Rates and Steam Requirement


Cooling GPM = 192,583 / ( 0.00 x 500 ) = 0.0 GPM
Heating GPM = 0 /( 0.00 x 500 ) = 0.0 GPM
Steam Req. = 0 / 970 = 0.0 lb./hr

Entering Cooling Coil Conditions Entering Heating Coil Conditions


Dry bulb temperature: 74.86 Dry bulb temperature: 75.00
Wet bulb temperature: 64.27
Relative humidity: 56.66
Enthalpy: 29.40 Btu/lbm

Leaving Cooling Coil Conditions Leaving Heating Coil Conditions


Dry bulb temperature: 55.00 Dry bulb temperature: 75.00
Wet bulb temperature: 53.98
Relative humidity: 93.85
Enthalpy: 22.57 Btu/lbm

D:\MBM Proyecto y Tecnologia SAC\Proyectos\Sistema Privado\2020\12. PROYECTAR 3D - CALCULO


jueves, 05DE
deCARGA
marzo de
TERMICA
2020, 1:23 a.m.
PLANOS\Calculo de carga termica.CHV