Professional Documents
Culture Documents
Prepared By:
Master Roofs
Roof ASHRAE Roof Dark Susp.
No. Roof# U-Fac Color Ceil
1 8 0.080 No No
Master Walls
Wall ASHRAE Wall Wall
No. Group U-Fac Color
1 C 0.080 M
2 C 0.010 M
Master Partitions
Partition Partition Cool Heat
No. U-Factor T-D T-D
1 0.080 18 20
2 0.010 10 20
Master Glass
Glass Summer Winter Glass Interior Interior
No. U-Factor U-Factor Shd.Coef. Shading Shd.Coef
1 1.100 1.100 1.000 1 0.650
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Essalud - Módulo N°12 Administración
Hell Page 4
Check Figures
Total Building Supply Air (based on a 19° TD): 1,908 CFM
Total Building Vent. Air (45.61% of Supply): 870 CFM
Total Conditioned Air Space: 657 Sq.ft
Supply Air Per Unit Area: 2.9036 CFM/Sq.ft
Area Per Cooling Capacity: 83.2 Sq.ft/Ton
Cooling Capacity Per Area: 0.0120 Tons/Sq.ft
Heating Capacity Per Area: 31.75 Btuh/Sq.ft
Total Heating Required With Outside Air: 20,860 Btuh
Total Cooling Required With Outside Air: 7.90 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Essalud - Módulo N°12 Administración
Hell Page 5
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 237 CFM
Total Air Handler Vent. Air (23.22% of Supply): 55 CFM
Total Conditioned Air Space: 100 Sq.ft
Supply Air Per Unit Area: 2.3683 CFM/Sq.ft
Area Per Cooling Capacity: 113.8 Sq.ft/Ton
Cooling Capacity Per Area: 0.0088 Tons/Sq.ft
Heating Capacity Per Area: 17.26 Btuh/Sq.ft
Total Heating Required With Outside Air: 1,726 Btuh
Total Cooling Required With Outside Air: 0.88 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Essalud - Módulo N°12 Administración
Hell Page 7
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 200 CFM
Total Air Handler Vent. Air (22.44% of Supply): 45 CFM
Total Conditioned Air Space: 66 Sq.ft
Supply Air Per Unit Area: 3.0378 CFM/Sq.ft
Area Per Cooling Capacity: 99.5 Sq.ft/Ton
Cooling Capacity Per Area: 0.0100 Tons/Sq.ft
Heating Capacity Per Area: 17.86 Btuh/Sq.ft
Total Heating Required With Outside Air: 1,179 Btuh
Total Cooling Required With Outside Air: 0.66 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Essalud - Módulo N°12 Administración
Hell Page 9
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 247 CFM
Total Air Handler Vent. Air (20.27% of Supply): 50 CFM
Total Conditioned Air Space: 94 Sq.ft
Supply Air Per Unit Area: 2.6240 CFM/Sq.ft
Area Per Cooling Capacity: 106.6 Sq.ft/Ton
Cooling Capacity Per Area: 0.0094 Tons/Sq.ft
Heating Capacity Per Area: 14.57 Btuh/Sq.ft
Total Heating Required With Outside Air: 1,369 Btuh
Total Cooling Required With Outside Air: 0.88 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Essalud - Módulo N°12 Administración
Hell Page 11
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 624 CFM
Total Air Handler Vent. Air (19.22% of Supply): 120 CFM
Total Conditioned Air Space: 162 Sq.ft
Supply Air Per Unit Area: 3.8546 CFM/Sq.ft
Area Per Cooling Capacity: 75.1 Sq.ft/Ton
Cooling Capacity Per Area: 0.0133 Tons/Sq.ft
Heating Capacity Per Area: 21.77 Btuh/Sq.ft
Total Heating Required With Outside Air: 3,527 Btuh
Total Cooling Required With Outside Air: 2.16 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Essalud - Módulo N°12 Administración
Hell Page 13
Check Figures
Total Air Handler Supply Air (based on a 19° TD): 599 CFM
Total Air Handler Vent. Air (100.13% of Supply): 600 CFM
Total Conditioned Air Space: 235 Sq.ft
Supply Air Per Unit Area: 2.5498 CFM/Sq.ft
Area Per Cooling Capacity: 70.9 Sq.ft/Ton
Cooling Capacity Per Area: 0.0141 Tons/Sq.ft
Heating Capacity Per Area: 55.57 Btuh/Sq.ft
Total Heating Required With Outside Air: 13,058 Btuh
Total Cooling Required With Outside Air: 3.32 Tons
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Essalud - Módulo N°12 Administración
Hell Page 15
Zone 2-SALA DE TELECOMUNICACIONES peaks (sensible) in February at 5pm, Air Handler 2 (SALA
DE TELECOMUNICACIONES), Group 0, 66.0 x 1.0, Construction Type: 1 (Light)
Roof-1-8-No.Clg-L 66 0.50 21.0 0.080 111 1.280 84
Wall-1-NE-C-M 79 0.83 19.0 0.080 120 1.280 101
Partition-2-1 75 18/20 0.080 108 1.600 120
Lights-Prof=1 150 1.000 512
Equipment-Prof=1 450 1.000 1,535 0
People-Prof=1 4.0 1.000 1,000 800
Cool. Infil.Direct CFM 20 216 655
Heat. Infil.Direct CFM 0 0.000 0
Sub-total 3,603 1,455 306
Safety factors: +10% +0% +0%
--------- --------- ---------
Total w/ safety factors: 3,963 1,455 306
Zone 3-CENTRAL DE VIGILANCIA Y SEGURIDAD II peaks (sensible) in February at 4pm, Air Handler 3
(CENTRAL DE VIGILANCIA Y SEGURIDAD II), Group 0, 94.0 x 1.0, Construction Type: 1 (Light)
Roof-1-8-No.Clg-L 94 0.50 17.5 0.080 132 1.280 120
Partition-1-1 174 18/20 0.080 251 1.600 278
Lights-Prof=1 250 1.000 853
Equipment-Prof=1 350 1.000 1,194 0
People-Prof=1 6.0 1.000 1,500 1,200
Cool. Infil.Direct CFM 50 585 1,594
Heat. Infil.Direct CFM 0 0.000 0
Sub-total 4,515 2,794 399
Safety factors: +8% +0% +0%
--------- --------- ---------
Total w/ safety factors: 4,876 2,794 399
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Essalud - Módulo N°12 Administración
Hell Page 16
Zone 5-ALMACÉN DE MATERIAL ESTÉRIL peaks (sensible) in February at 5pm, Air Handler 5
(ALMACÉN DE MATERIAL ESTÉRIL), Group 0, 235.0 x 1.0, Construction Type: 1 (Light)
Roof-1-8-No.Clg-L 235 0.50 21.0 0.080 395 1.280 301
Wall-1-NE-C-M 7 0.83 19.0 0.010 1 0.160 1
Wall-2-NE-C-M 241 0.83 19.0 0.080 366 1.280 308
Partition-3-1 413 18/20 0.080 595 1.600 661
Gls-NE-1-90-Tran 8.0 1.000 11 1.100 99 17.600 141
0%S-0-WS-Solar 8.0 0.650 154 0.180 144
Lights-Prof=1 353 1.000 1,203
Equipment-Prof=1 470 1.000 1,604 0
People-Prof=1 2.0 1.000 500 400
Sub-total 4,907 400 1,412
Safety factors: +2% +0% +0%
--------- --------- ---------
Total w/ safety factors: 5,005 400 1,412
Chvac - Full Commercial HVAC Loads Calculation Program Elite Software Development, Inc.
pReJkEr Essalud - Módulo N°12 Administración
Hell Page 17